N3943019R2126-0002.pdf
PDF 215 KB Posted
- Attached to
- Synopsis of Enterprise Computer and Information Technology Support Services (ECITS) Federal contract opportunity
- Solicitation number
- N3943019R2126
About this file
This document is an amendment to a solicitation for enterprise computer and information technology support services. The amendment provides responses to 16 questions from offerors, removes appendices from Section J, and modifies Sections H.8 and H.9 of the solicitation. The services solicited include technical, engineering, and management support for information technology and networks. The solicitation was issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy for an indefinite delivery/indefinite quantity multiple award contract with firm-fixed price and labor hour task orders. Offerors are required to submit their proposals by the amended date of June 3, 2019.
N3943019R2126-0002.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3943019R2126-0009.pdf | ||
| N3943019R2126-0008.pdf | ||
| N3943019R2126_0001-0008_(Conformed_Copy).pdf | ||
| N3943019R2126_0001-0007_(Conformed_Copy).pdf | ||
| N3943019R2126-0007.pdf | ||
| N3943019R2126_0001-0006_(Conformed_Copy).pdf | ||
| N3943019R2126-0006.pdf | ||
| Attachment_J-7_Safety_Data_Sheet_-_Safety_Narrative.docx | DOCX document | |
| N3943019R2126-0005.pdf | ||
| Attachment_J-1_Schedule_of_IDIQ_Price.xlsx | XLSX spreadsheet | |
| Attachment_J-1_Schedule_of_IDIQ_Price.xlsx | XLSX spreadsheet | |
| CDRLS.zip | ZIP file | |
| N3943019R2126-0004.pdf | ||
| N3943019R2126-0003.pdf | ||
| N3943019R2126-0001.pdf | ||
| ECITS_ATTACHMENTS.zip | ZIP file | |
| N3943019R2126.pdf | ||
| N3943019R2126_ECITS_Pre-Solicitation_Notice.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to:
1) Provide response to Offeror's questions
2) Remove Appendices from Section J of the Solicitation
3) Revome No SOFA Sponsor language from Section H.8 of the Solicitation
4) Renumber Section H to account for the revoval of Section H.8
See page tw o, Summary of Changes, for more details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Jun-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3943019R2126
X 9B. DATED (SEE ITEM 11)
03-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Jun-2019
CODE
NAVFAC EXWC
CODE ACQ / NAVAL BASE VENTURA COUNTY
1100 23RD AVE BLDG 1100
PORT HUENEME CA 93043-4301
N39430 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3943019R2126
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 2
Amendment 2
a) Provide Government answers to the following contractor’s questions:
Q1: I would like to see if I could offer our products and services to the current incumbent and to the bidders. Do you have contact information for these companies I can have?
A1: The current incumbents and their contact information are as follows:
VSolvit C.J. SETO SUPPORT SERVICES, LLC 4171 Market Street, Suite 2, 2300 Knoll Drive Unit G Ventura, CA 93003 Ventura, CA 93003 Inquiries: info@vsolvit.com Phone: 805.644.1214 Phone: 805.277.4705 Fax: 805.654.9421 Fax: 805.409.4757
Q2: Page 71 of 80, Section L.7 (1) Factor 1, Technical Approach, Para 2 of the Solicitation: Do the copies of our CMMI SVC Level III and CMMI DEV Level III appraisal and/or certificate count towards the 44-page count limit on our Technical response?
A2: No, certification copies do not count as part of the 44-page limit.
Q3: Page 71, Section L.5 – Content of Proposal, Paragraph “d” of the Solicitation: The RFP specifies a general 12-point font size for text. Will the Government allow the Offeror to use:
10-point font for tables?
8-point font size for graphics?
A3: The Government will allow the Offerors to use 10-point font for tables and 8-point font for graphics.
Q4: Page 60 of 80, Section J – List of Document, Exhibits and Other Attachments, Appendix: This section references three Appendices (Business Systems, acronyms, and Commercial and Industrial Certification Utilization. These appendices do not appear to be included in the RFP documents. Can the Government please provide or clarify?
A4: Appendices (A, B, and C) on Page 60, Section J of the Solicitation have been removed.
Q5: Page 40 of 80, Section H.8 No Sofa Sponsor, of the Solicitation: The referenced paragraph indicates that contractors will not be sponsored under the SOFA Treaty. However, Page 49 of 80, Section I – Contract Clauses in the Solicitation includes 252.225-7976, Contractor Personnel Performing in Japan, which implies that SOFA will be applicable to contractors working in Japan. Can the Government please confirm?
A5: Section H.8 No SOFA Sponsor on Page 40 of 80 was removed from the Solicitation. DFARS Contractor Personnel Performing in Japan (DEVIATION 2018-O0019) (AUG 2018) should be used for contractor personnel performing in Japan.
Q6: Page 5 of 80, Section C.1.3. Scope, Paragraph 2 of Amendment 0001: states in part that the contractor may be required to possess one or more of the following credentials at the individual task order level:
ISO 9001:2000
ISO 9001:2008
CMMI Level III (or higher) – Dev, etc.
Are these credentials mandatory for the Prime or will the government accept these credentials from the proposed team composition on the individual task order response(s)?
A6: Credentials from the Prime and team members will be considered; However, credentials by Prime members may be rated higher than the team members.
Q7: Page 39 of 40, Section L.7 (4), Factor 4, Past Performance of Amendment 0001, Past Performance states:
Offerors are required to submit past performance information for no more than three projects.
What is the specific number of past performance references required by the prime vs proposed subcontrator(s)?
A7: There is no specific number or mix of past performance references required by the prime vs proposed subcontractor(s).
Q8: Page 38 of 40, Secion L.7 (1) Factor 1, Technical Approach of Amendment 0001: "Offerors shall also describe relevant Capability Maturity Model Integration (CMMI) or equivalent model-based process maturity certification. As a part of this description, offerors shall identify the granting organization, applicable model, level achieved and provide a copy of the appraisal and/or certificate"
To maximize participation and competition, would the Government accept Subcontractor certification in CMMI in lieu of Prime certification?
A8: Yes, however Prime certification may be rated higher than subcontractor certification.
Q9: Page 5 of 40, Section C.2.3.2.2 Monthly Contract Status Report of Amendment 0001: “Earned Value Management metrics when applicable.” Is EVMS a requirement for the IDIQ, or are EVMS requirements limited to the individual task order level?
A9: EVMS requirements are limited to, and will be specified at the task order level.
Q10: Page 27 of 40, Section C.4.2.2 Technology of Amendment 0001: “Due to the emerging nature of this acquisition request, the government cannot anticipate all technology requirements.” Will contractors be permitted to add subcontractors at the task order level to accommodate emerging requirements?
A10: Yes, contractors will be permitted to add subcontractors at the task order level to accommodate emerging requirements.
Q11: Page 37 of 40, Section L.7 (1) Factor 1, Technical Approach of Amendment 0001: We believe it will be difficult for most 8(a) businesses to meet the CMMI certification requirement, which may impact the competitiveness of this acquisition. Will the Government:
a) Consider removing or revising this requirement?
b) Allow offerors to meet the certification after award?
c) Confirm that certification requirements can be met through teaming arrangements (i.e., a subcontractor with the appropriate certification).
A11: For questions A, B, and, C: CMMI is not absolutely required; CMMI and any other certifications that support the functional areas will be used in evaluating an offeror’s ability to perform the requirements.
Certification through teaming arrangements will be considered as well as equivalent and/or other certifications will be considered. Prime certifications will be rated higher than team member certification.
Q12: Page 37, Section L.7 (1) Factor 1, Technical Approach of Amendment 0001: Will the Government consider ISO 9001:2015 certification in lieu of a CMMI certification?
A12: Yes, the solicitation includes options for equivalent or alternate certifications.
Q13: Page 71 of 80, Section L.5, Paragraph d. of the Solicitation: Do Graphs, Charts and Tables also have to meet the 12-point font requirement or can they have a smaller font limit?
A13: The Government will allow the Offeror to use 10-point font for tables and 8-point font for graphic.
Q14: The solicitation references multiple locations including OCONUS sites. Yet, the pricing sheet only allows for one bare rate per labor category. Is one location the primary place of performance and all the other sites TDY locations? If not, shouldn’t there be a separate rate for each location?
A14: The location referenced in Amendment 0001 of the Solicitation, Page 8 of 40, Section C.2.7 Travel / Temporary duty (TDY) are indeed travel locations and not primary place(s) of performance.
Q15: Page 5 of 80, Section C.1.3. Scope, Paragraph 2 of the Solicitation: Regarding the CMMI potential requirements at the individual task order level and description of said certification on Page 71 of 80, Section L.7
(1) Factor 1, Technical Approach Paragraph 2 of the Solicitation: Is CMMI a hard requirement? If so, must it be held by the prime contractor or can one of the subcontractors on the team hold the certification for the team?
A15: CMMI is not absolutely required; CMMI and any other certifications that support the functional areas will be used in evaluating an offeror’s ability to perform the requirements.
Q16: Page 70 of 80, Section L.3 Evaluation Methodology, Factor 4 Past Performance of the Solicitation: Is the subcontractor’s past performance acceptable for factor 4?
A16: Yes, subcontractor(s) past performance in acceptable for Factor 4 on Page 70 of 80, Section L.3 Evaluation Methodology of the Solicitation.
b) Portions of this Solicitation were altered as follows:
1. Page 60, Section J, all Appendices (A, B, and C) were removed from the Solicitation.
2. Page 40 of 80, Section H.8 No SOFA Sponsor was removed from the Solicitation.
3. Page 40 of 80, Section H.9 Travel was changed to Section H.8.
4. Page 42 of 80, Section H.10 Authority was change to Section H.9.
5. Page 42 of 80 Section H.11 Service Contracts General was changed to H.10
SECTION A - SOLICITATION/CONTRACT FORM
The solicitation issue date has changed from 22-May-2019 to 03-Jun-2019.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SECTION H
H.1 PLANT ACCESS
The Government Contracting Officer’s Representative (COR) and other authorized Government personnel shall be allowed access to the contractor’s plant in which work under this contract is being performed during normal working hours as long as the visiting government personnel has complied with the visit planning and coordination requirements of FAR 42.402.
H.2 OCCUPATIONAL SAFETY AND HEALTH REQUIREMENTS
If performance of any work under this contract is required at a Naval facility, the Contractor shall contact the Navy Occupational Safety and Health Office prior to performance of work at any Navy facility.
Contractors are responsible for following all safety and health related State and Federal statues and corresponding State, Federal, and/or Navy regulations protecting the environment, contractor employees, and persons who live and work in and around contractor and/or federal facilities.
Contractor shall monitor their employees and ensure that they are following all safety regulations particular to the work area. Contractor shall ensure that their employees (a) wear appropriate safety equipment and clothing; (b) are familiar with all relevant emergency procedures should an accident occur, (c) have access to a telephone and telephone number, to include emergency telephone numbers, for the facility when work is performed.
H.3 WAGE DETERMINATIONS, MINIMUM WAGE RATES FOR INDIVIDUALTASK ORDERS
Wage Determination will be included at the task order level.
H.4 SECURITY WARNING
The contract, or the performance thereof, may involve access to information affecting the national defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Section 793 and 794. The transmission or the revelation of the classified contents, or of the classified matter to which access may be had, in any manner to an unauthorized person is prohibited by law, in accordance with FAR Clause 52.204-2 – “Security Requirements” (incorporated by reference in Section I).
H.5 HOLIDAYS
All or a portion of the effort under this contract will be performed on a Government installation. Listed below are the holidays observed by the Federal Government. The Contractor will not be allowed to work on the Government installation on these days.
NAME OF HOLIDAY TIME OF OBSERVANCE
New Year’s Day 1 January Martin Luther King, Jr. Day Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
In the event any of the above holidays occur on Saturday or a Sunday, then such holiday shall be observed by the Contractor in accordance with the practice as observed by the assigned Government employees at the using activity.
H.6 PERFORMANCE AT GOVERNMENT INSTALLATION
The contractor shall be required to furnish to the security department, at least 10 days in advance of commencement of the task order, the name(s) and place(s) of birth of the individual(s) who shall be performing the services.
H.7 EMPLOYMENT OF NAVY PERSONNEL RESTRICTED
In performing this contract, the contractor will not use as a consultant or employ (on either a full or part time basis) any active duty navy personnel (civilian or military) without the prior approval of the Contracting Officer. Such approval may be given only in circumstances where it is clear that no laws and no department of Defense (DoD) or Navy instructions, regulations, or policies might possibly be contravened and no appearance of a conflict of interest will result.
H.8 TRAVEL
Some of the task orders issued under this contract will require travel. The number of trips and locations have not yet been identified.
Travel costs will be reimbursed only to the extent travel is specifically ordered in the task order. Travel costs will be reimbursed in accordance with the Federal Acquisition Regulation, FAR 31.205-46.
Travel costs are payable only to the extent that they do not exceed the rates or amounts authorized by the following:
Joint Travel regulation, volume 2, DoD civilian personnel, Appendix A as prescribed by the Department of Defense for travel in Alaska, Hawaii, the commonwealth of Puerto Rico and the territories and possessions of the United States; or
Standardized regulations (Government civilians, foreign areas) Section 925, maximum travel per diem allowances in foreign areas prescribed by the Department of State for travel in areas not covered in travel regulations cited above.
Federal Travel Regulation (FTR)
The contractor will be reimbursed for wages paid to contractor personnel in travel status subject to the following.
Travel must be to and from the temporary duty site designated in the task order. Payment will be at the straight (regular) time rate regardless of when the travel occurs and its duration. Such billing shall not exceed eight hours per person per calendar day.
The Contractor shall not be reimbursed travel expenses for Contractor personnel who reside in the metropolitan area where the tasks are being performed.
Local transportation of an employee both from their place of residence to their place of work and the return trip (i.e., work commute) is an unallowable cost under the contract regardless of whether the cost is reported as taxable income to the employees.
Transportation
When transportation by privately owned conveyance is authorized, the Contractor shall be paid on a mileage basis not to exceed the applicable Government transportation rate specified in the travel regulations cited in FAR 31.205- 46(a)
The Contractor agrees, in the performance of necessary travel, to use the lowest cost mode commensurate with the requirements of the mission and in accordance with good traffic management principles. When it is necessary to use air or rail travel, the Contractor agrees to use coach, tourist class or similar accommodations to the extent consistent with the successful and economical accomplishment of the mission for which the travel is being performed.
Documentation must be provided to substantiate non-availability of coach or tourist if business or first class is proposed to accomplish travel requirements.
Contractor travel shall be reviewed and authorized by the COR prior to travel.
Any travel required to perform a task order should be specifically identified by the Contractor in its task order proposal
If the contractor discovers a need to travel after task order award the Contractor shall send the travel request to the COR, with the PCO cc’d, with the following information:
a. Date, time, and place of proposed travel
b. Purpose of the travel and how it relates to the contract
c. Contractor’s estimated cost of travel
d. Names of individuals travel
e. A breakdown of estimated travel and per diem charges
The Contractor is responsible for obtaining visas, passports, international driver’s licenses and any other documentation required to perform their work.
Per Diem
The Contractor shall not be paid per diem for Contractor personnel who reside in the metropolitan area where the tasks are being performed. Per diem shall not be paid on services performed at the Contractor’s home facility and at any facility required by the contract or at any location within a radius of 50 miles from the Contractors home facility and any facility required by this contract.
Costs for subsistence and lodging shall be paid to the Contractor only to the extent that overnight stay is necessary and authorized in writing by the Government for performance of the work under this contract. When authorized, per diem shall be paid by the Contractor to his employees at a rate not to exceed the rate specified in the travel regulations, cited in FAR 31.205-46(a)(2) and authorized in writing by the Government. The authorized per diem rate shall be the same as the prevailing locality per diem rate. The written Government authorization will be by Task Orders or by a modification to an issued Task Order.
Reimbursement to the Contractor for per diem shall be limited to payments to employees for authorized per diem, as described above, not to exceed the authorized per diem. Fractional parts of a day shall be payable on a prorated basis for purposes of billing for per diem charges attributed to subsistence on days of travel.
Fractional billing shall be on a ¼, ½ and ¾ basis. The Contractor shall retain supporting documentation for per diem paid to employees as evidence of actual payments, as required by the FAR 52.216-7 Allowable Cost and Payment clause of the contract.
H.9. AUTHORITY
1. No person other than the Contracting Officer has authority to bind the Government with respect to this contract.
2. No action or omission of any government employee or representative other than the Contracting Officer shall increase or decrease the scope of this contract or shall otherwise modify the terms and conditions of this contract.
3. In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:
(a) An understanding or agreement between the Contractor and anyone other than the Contracting Officer;
(b) A purported modification or change order issued by anyone other than the Contracting Officer;
(c) A promise by anyone other than the Contracting Officer to provide additional funding or make payments; or
(d) An order, direction, consent, or permission from anyone other than the Contracting Officer to:
(i) Incur costs in excess of a specified estimated cost, allotment of funds, or other ceiling; or
(ii) Expend hours in excess of a specified level of effort.
H.10. SERVICE CONTRACTS GENERAL
In accordance with NMCARS 5237.102, the contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the ECITS via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
Attachment 1 Schedule of IDIQ Price 2 Past Performance Questionnaire 3 Non-Disclosure Form 4 Department of Homeland Security Employment Eligibility Verification Form 5 Application for Indemnification Card DEER Enrollment Form 6 System Authorization Request Form 7 Safety Data Sheet / Safety Narrative
(End of Summary of Changes)
File details come from the government source that posted it. Updated .