ASCV_SEP_ANNEX_B_PWBS.PDF
PDF 14 KB Posted
- Solicitation number
- N3943019R2117
About this file
ASCV_SEP_ANNEX_B_PWBS.PDF
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amphibious Surf Capable Vehicle (ASCV) Systems Engineering Plan
FOR OFFICIAL USE ONLY
Annex B Work Breakdown Structure (WBS) 573
WBS Task Name
1 ASCV
1.1 Primary Vehicle
1.1.1 Assembly, Integration, Test, and Checkout
1.1.2 Hull and Structure
1.1.2.1 Hull/Structure Assembly, Test, and Checkout
1.1.2.2 Hull and Structure Design
1.1.3 BLANK
1.1.4 BLANK
1.1.5 Suspension/Steering
1.1.6 Vehicle Electronics/Power
1.1.7 Propulsion/Drive Train
1.1.8 Auxiliary Subsystems
1.1.9 Energy Storage/Conversion
1.2 Payload Control Segment
1.2.1 Navigation
1.2.2 Communication System
1.2.3 Bathymetry Payload
1.2.4 Launch and Recovery Equipment
1.2.5 Storage Subsystems
1.2.6 Vehicle Handling Equipment
1.2.7 Auxiliary Equipment
1.2.8 Assembly, Integration, Test, and Checkout
1.3 System Integration & Testing (Prototype Down Select)
1.4 Systems Engineering (integrate Code812 & NEPO's info)
1.5 NEPO Program Management (integrate NEPO's info)
1.6 System Test and Evaluation
1.7 Training
1.8 Data
1.9 Peculiar Support Equipment
1.1 Common Support Equipment
1.11 Operational Site Activation/Demonstration
1.12 Initial Spares and Repair Parts
1.13 Design Finalization
File details come from the government source that posted it.