AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modificaiton is to post additional industry questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3943019R2117
X 9B. DATED (SEE ITEM 11)
11-Apr-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-May-2019
CODE
NAVFAC EXWC
CODE ACQ / NAVAL BASE VENTURA COUNTY
1100 23RD AVE BLDG 1100
PORT HUENEME CA 93043-4301
N39430 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3943019R2117
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added by full text:
GOVERNMENT RESPONSES
1. Question: Please confirm if the government intends to request a second proposal with the detailed design, engineering, manufacturing, and testing approaches, as well as detailed pricing of the proposed ASCVs under Phases II and III. If so, please clarify the timing of the second proposal, and if it will be a deliverable under Phase I of the ASCV contract.
Response: Yes, the Government intends to request a second proposal from those that were awarded a contract in Phase I for detailed design, engineering, manufacturing, and testing, as well as detailed pricing of the ASCV, at the conclusion of Phase I. The proposal will not be a deliverable under Phase I but will include deliverables that were developed under the Phase I contract. PHASE II IS A DOWNSELECT FROM PHASE I AWARDEES.
See RFP Section C, third paragraph.
2. Question: Please confirm that the non‐narrative proposal content listed in sections RFP Section L.1, (1), page 37and in Section L.3, A. 1. page 39, are both, not considered a "page" for page limit purposes, and also not included in the page count limitation.
Response: The solicitation has been amended to clarify what is included in the page count.
See Sections L.3 table and L.4(1).
3. Question: The attachment numbers and titles included in the requirements of RFP Section L3 for factors 3 and 4, pages 39 to 42, differ from the attachment numbers and titles listed under RFP Section: J ‐ List of Documents, page 31. Please confirm that the attachment numbers and titles listed under RFP Section: J ‐ List of Documents are correct.
Response: The solicitation has been amended to correct the attachment numbers throughout the document.
Refer to updated Section J and corresponding Sections L.5(3) and L.5(4).
4. Question: Please confirm if Offerors must include a completed copy of Section K in both, Volume I and Volume II of the Proposal.
Response: The requirement for Section K is separate from the requirements in Volumes I and II.
Section K may be included in the Volume II pricing binder to save space; this is left up to the Offeror. The solicitation has been amended to reflect this update.
Solicitation has been amended to clarify this requirement.
Refer to section L.3 table and L.3(h)
5. Question: Please confirm if the “dollar value” of the work performed by the prime contractor (Factor 3, page 41) is considered “cost information” (Page 37, 1. b.) and is not to be “contained in Volume I”.
Response: Dollar value of the work in terms of Small Business utilization is not considered cost information and should be included in the response to this factor.
6. Question: Please confirm if the “Cost Model” required by Section C.3.1 to be included in ASCV Preliminary Design Package (page 5) is a deliverable or part of a deliverable under Phase 1 of the ASCV contract.
Response: The solicitation has been updated to include information regarding cost models.
See Section C and Attachment J‐6
7. Question: Organization of offer, it states that blank pages, cover letter, tables of content, glossary and index do not count towards the page count. On page 39 Paragraph L3 A General. It states that blank pages, cover letter, title page, table of contents and lists all count towards the page count Response: The solicitation has been amended to clarify what is included in the page count.
Refer to section L.4(1)
8. Question: In regards to the ASCV Specification ‐ "The ASCV shall conform to all Federal Laws and regulations governing safety, noise levels, reduction of Ozone Depleting Substances (ODS), and heavy metals, which are in effect on the date of contract, or publicly known to be scheduled for implementation during the performance of the contract, for a commercial craft."
Request the Government specify the safety, noise, ODS, and heavy metal standards which must be adhered to, or otherwise limit compliance to the numerous Federal, military, and international standards listed in Section 2.1.
Response: All Offerors are required to comply with all Federal Laws and regulations, the Federal, military, and international standards listed in Section 2.1 are to guide Offerors but is not a complete list of Federal Laws and regulations.
9. Question: In regards to the ASCV Specification ‐ Using the contract date as the baseline, rather than the proposal date, raises the risk of previously unaccounted‐for laws and regulations (with possible cost and schedule implications) arising between the proposal date and contract date. Request the Government use the proposal date as the baseline, rather than the contract date.
Response: Government does not anticipate any changes to Federal Laws and regulations between this proposal date and anticipated contract award date. If there is a change that would impact an Offerors proposal they should bring it to the Government attention.
10. Question: In regards to the ASCV Specification – The specification references the NAVFAC/Component CIO/ISSM Cybersecurity Strategy.
Request the Government make this document available to Offerors.
Response: Not available for release at this time.
11. Question: In regards to the ASCV Specification – Specification requires maneuverability aboard a large number of ship classes.
Request the Government provide such drawings or information for each required vessel, or otherwise specify dimensional and/or other requirements that would allow Offerors to validate conformance.
Response: The Government believes shipboard maneuverability requirements may be validated through conformance with the following requirements of the ASCV Specification: Section 3.2.5 Geometric Constraints,
3.3.1.1 Land Performance, 3.3.1.2 Surf Zone Performance, 3.3.1.3 Waterborne Performance, 3.3.1.4.1 Speed – Shipboard, and 3.3.1.4.2 Deck Point Pressure.
12. Question: In regards to the ASCV Specification – Specification cites several Government references, can they be made available.
Request the Government make available the following references cited in the Solicitation:
a. NSWCCD‐12‐TM‐2011/05
b. NSWCCD‐23‐TM‐2011/05
c. NSWCCD‐23‐TM‐2009/65
d. NSWCCD‐23‐TM‐2009/58
e. TOP 02‐2‐501
f. TOP 01‐1‐065
g. MIL‐STD‐3056
h. US Air Force Technical Order 1C‐17A‐9
Response: a. NSWCCD‐12‐TM‐2011/05 – Not our requirement
b. NSWCCD‐23‐TM‐2011/05 – Releasable as Distribution “A”
c. NSWCCD‐23‐TM‐2009/65 – Releasable as Distribution “A”
d. NSWCCD‐23‐TM‐2009/58 – Releasable as Distribution “A”
e. TOP 02‐2‐501 – Releasable as Distribution “A”
f. TOP 01‐1‐065 – Releasable as Distribution “A”
g. MIL‐STD‐3056– Releasable as Distribution “D”
h. US Air Force Technical Order 1C‐17A‐9 – Releasable as Distribution “D”
13. Question: In regards to the ASCV Specification ‐ MIL‐STD‐1472G for Vehicular Whole‐Body Vibration.
Request the Government specify whether the LARC‐V currently conforms to this requirement.
Response: The LARC‐V A1 was not designed to MIL‐STD‐1472G.
14. Question: In regards to the ASCV Specification ‐ MIL‐STD‐1472G for Vehicular Whole‐Body Vibration.
Request the Government specify whether the requirement applies to all embarked passengers, or just seated passengers.
Response: MIL‐STD‐1472G for Vehicular Whole‐Body Vibration applies to only the seated crew members in the operator’s cabin.
15. Question: In regards to the ASCV Specification, section 3.2.1 through 3.2.4, applicable design requirements, but do not clearly address the order of precedence between marine‐based specifications.
Request the Government confirm that where conflict between CFR, ISO, and NSWCCD specifications exist, the ISO and NSWCCD specifications listed in paragraphs 3.2.2 through 3.2.4 take precedence over the CFR standards in paragraph 3.2.1.
Response: The order of precedence is; CFR, MIL STD, NSWCCD, ISO or other commercial standard unless otherwise specifically stated in the SOW or ASCV Performance Specification. When specifically stated, lower standard will take precedence as in Section 3.2.2, 3.2.3 and 3.2.4 would take precedence over Section 3.2.1 for that requirements. Additionally, if there is a conflict between standard at the same precedence the more restrictive or stringent standard shall be followed.
16. Question: In regards to the ASCV Performance Spec, section 3.3.2.1, “Detect holes; the ASCV shall be capable of detecting holes greater than 4 feet deep by traversing over them.”
Can additional information be provided such as how deep is the surrounding area around the hole? What are the surface dimensions of the hole (length/width)?
Response: The surrounding area depth up to 4 feet. The size of the hole is 27 inches in diameter or greater and depth greater than 4 feet.
(End of Summary of Changes)