ASCV_Phase_I_Solicitation_Amendment_0001.pdf

PDF 243 KB Posted

Attached to
Amphibious Surf Capable Vehicle (ASCV) - The purpose of this amendment is to correct the proposal due date on the SF 30.
Solicitation number
N3943019R2117
Issued by

About this file

ASCV_Phase_I_Solicitation_Amendment_0001.pdf

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is to add Phase I deliverables to the SOW and post Government responses to industry questions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3943019R2117

X 9B. DATED (SEE ITEM 11)

11-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-May-2019

CODE

NAVFAC EXWC

CODE ACQ / NAVAL BASE VENTURA COUNTY

1100 23RD AVE BLDG 1100

PORT HUENEME CA 93043-4301

N39430 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3943019R2117

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES REVISED

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SECTION C

SECTION C. Description / Specification / Work Statement Background

The Amphibious Surf Capable Vehicle (ASCV) will be capable of performing the full mission set of the Lighter Amphibious Re-Supply Cargo (LARC)-V A1/A2. The ASCV’s core capabilities include amphibious warfare during Assault Echelon (AE), Assault Follow-on Echelon (AFOE), Logistics over the Shore (LOTS), Combined Joint Logistics Over-the-Shore (C/JLOTS), and Maritime Prepositioning Force (MPF) operations. The purpose of the ASCV is to provide surf zone support to landing craft and lighterage during logistics offload and on-load, by identifying underwater holes and obstacles, rescuing personnel overboard, delivering anti-broaching lines, and towing disabled vehicles. The ASCV Concept of Operation (CONOPS) describes the anticipated operations for the vehicle including ramp checks, surf zone rescue, boat lane preparation, anti-broaching, personnel transport, equipment transport, surf and beach salvage, and conduct diving operations. The ASCV Performance Specification contains the performance specifications for the vehicle. Instructions to obtain the ASCV Performance Specification and ASCV CONOPS is located at Attachment J-1

The Government encourages and seeks low risk, cost effective approaches in the design and construction of the ASCV. The government also seeks to eliminate the use of military standards in favor of commercial standards and will consider contractor recommendations to this end.

The ASCV acquisition is planned for three contract phases with the intent that work will continue without disruption between phases. Contractors must have the ability to complete all three phases in order to receive any contract. The Government intends to award to multiple Contractors for Phase I and subsequently select a single contractor for Phase II, finally leading to Phase III production. Phase I selection will be based on Contractor proposal(s) submitted in response to this solicitation The three procurement phases are as follows:

ASCV Program Contracting Phases:

Phase I:

Contract Type: Firm Fixed Price Anticipated Number of Awards: multiple Duration: 6 months Purpose: Preliminary Design of Engineering Design Model (EDM), Systems Engineering, and Planning

Phase II:

Contract Type:

a) Firm Fixed Price for Engineering Development Model (EDM): to include detailed design, construction, testing, and logistics support

b) Firm Fixed Price for Low Rate Initial Production (LRIP) construction and logistics support Anticipated Number of Awards: Single Duration: 50 months Purpose: Design development and validation, including:

EDM Detailed Design – 6 months EDM Construction, one (1) unit – 12 months, EDM Testing

– 3 months, EDM Logistics support – 12 months, Low Rate Initial Production (LRIP), four (4) units – 12 months, LRIP Logistics support – 12 months Technical Data Package (optional) – 12 months

Phase III:

Contract Type: Firm Fixed Price Anticipated Number of Awards: Single Duration: 51 months Purpose: Full Rate Production (FRP) – 40 Units.

This statement of work is for the award of Phase I only. Only awardees under Phase I will be eligible for award under Phase II. Awardees under phase II are eligible for award under Phase III.

ASCV Statement of Work

C.1 INTRODUCTION

The existing LARC-V A1/A2 vehicles are reaching the end of their service life, resulting in a capability gap when they are no longer in the fleet. The LARC-V A1/A2’s hull form, which has more than 40 years of in-surf experience, is described in the LARC-V A1/A2 Hull Form Description document. Instruction on how to obtain this document is found in Attachment J-1. The ASCVs will be a direct replacement for the LARC-V A1/A2. The ASCV will utilize non-developmental technologies to meet the program schedule and ensure ASCVs are available to replace the aging LARC-V A1/A2s.

C.2 APPLICABLE DOCUMENTS

C.2.1 Government Documents

a) STANDARDS

MIL-STD-881D Work Breakdown Structures 18 April 2018 for Defense Materiel Items

b) OTHER GOVERNMENT DOCUMENTS

DoD Technology Readiness Office of the Director of Assessment (TRA) Defense Research and Deskbook July 2009 Engineering, Washington DC

DoD Directive 5000.01 The Defense Acquisition 12 May 2003 System

DoD Instruction 5000.02 Operation of the Defense 10 August 2017 Acquisition System

Systems Engineering Department of Defense Fundamentals Syste ms Management College January 2001

C.2.2 Other Publications

AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASME Y14.100-2017

Engine ering Drawing Practices 2017

ASME Y14.24 Types and Applications of 5 April 2013 Engineering Drawings

ASME Y14.34 Associated Lists 2013

ASME Y14.35M Revision of Engineering 29 August 2014 Drawings and Associated Documents

ASME Y14.41 Digital Product Definition 2012 Data Practices

ASME Y14.42

Di gital Approval Systems 1 January 2002

AMERICAN NATIONAL STANDARDS INSTITUTE

ANSI/EIA 632 Processes for

Engineering a Systems International Standards Organization

ISO 10303-21 The STEP Standard 2016

In addition to the documents specifically listed above the contractor shall comply with all applicable local, state, and federal laws.

C.3 REQUIREMENTS

The Contractor shall develop an Amphibious Surf Capable Vehicle (ASCV) Preliminary Design Package. The Contactor shall provide Design Reviews.

C.3.1 ASCV Preliminary Design Package

The ASCV Preliminary Design Package shall include a Preliminary Design, Performance Assessment Report, and Cost Model.

C.3.1.1 ASCV Preliminary Design

The ASCV Preliminary Design shall be designed to meet the requirements in the ASCV Performance Specifications.

The ASCV Preliminary Design shall utilize mature technologies, Technology Readiness Level 7 or greater, to meet the requirements. The ASCV Preliminary Design shall be documented IAW ASME Y14.100-2017 Engineering Drawing Practices in conjunction with ASME Y14.24, ASME Y14.34, ASME Y14.35M, ASME Y14.41 and ASME Y14.42. The ASCV Preliminary Design shall include the following, at a minimum, to document the design:

a) General Arrangements Model, three-dimensional data model, providing general arrangements layout of sub-systems and major components within the vehicle.

b) Freeform Curves Model, three-dimensional data model, providing hull geometries and all wetted surface areas, that will be used for hydrostatic and hydrodynamic analysis.

c) Vehicle Overview Drawing, including isometric view, elevation view, plan view, front view, and rear view. No dimensions are required.

d) List of major sub-systems and major components identifying their materials of construction; providing a range of viable sub-systems and major components is encouraged for preliminary design, versus point design solutions.

e) Electrical load report including all subsystems and major components.

f) Draw-bar Pull (land) Towing Arrangement Drawing for one ASCV towing another ASCV, including isometric view, elevation view, and plan view. No dimensions are required.

g) Bollard Pull (marine) Towing Arrangement Drawing for one ASCV towing another ASCV, including isometric view, elevation view, and plan view. No dimensions are required.

h) Hoisting Arrangement Drawing, including isometric view, elevation view, and plan view. No dimensions are required.

i) Vehicle placemat consistent with LARC-V A1/A2 placemat, instructions to obtain document can be found in Attachment J-1.

j) List of internal interfaces between sub-systems and major components and proposed standards, if applicable.

k) Weight report IAW with a government approved ASCV Contractor Work Breakdown Structure (CWBS).

C.3.1.2 ASCV Performance Assessment Report

The ASCV Performance Assessment Report shall demonstrate the ASCV Preliminary design’s ability to meet the requirements in the ASCV Performance Specifications. The Performance Assessment Report shall include the following, at a minimum:

a) Analytical verification of the following ASCV performance requirements, see ASCV Performance Specificiton, section 3 for details:

i) Gradient – Maneuver (3.3.1.1.12), via torque analysis

ii) LCU Ramp Maneuver – Ascend (3.3.2.2), via torque and traction analysis

iii) Gradient Braking (3.3.1.1.14)

iv) Intact Stability (3.3.1.3.5), via General Hydro Statics (GHS) analysis. The contractor shall provide the GHS input and output files. GHS analysis will be used to verify:

(1) Personnel Transport Capacity (3.3.6.1)

(2) Equipment Capacity (3.3.7.1)

v) Bollard Pull (3.3.8.7)

vi) Growth Margin (3.4.10.1), via Weight report

vii) Ramp Seating Load Requirement (3.3.2.4), via Weight report

viii) Design Margin (3.4.10.2), via Weight report

ix) Construction Margin (3.4.10.3), via Weight report

x) Simulated Wave Drop (3.3.1.2.4)

xi) Fuel Alternative – Threshold (3.4.1.2.2), via technical manuals or alternative supporting documentation.

xii) Righting Propensity Parameter (3.3.1.3.6), via GHS analysis. The contractor shall provide the GHS input and output files.

xiii) Fuel Alternative – Objective (3.4.1.2.3), via supporting documentation

b) Technology Maturity Assessment of sub-systems and major components

IAW DoD Technology Readiness Assessment (TRA) Deskbook (July 2009).

c) Reliability Assessment of sub-systems and major components.

d) Standardization Assessment of sub-systems and major components.

C.3.1.3 ASCV Total Ownership Cost (TOC) Model

The Contractor shall develop, maintain, update, and provide an ASCV Total Ownership Cost (TOC) Model in accordance with CDRL A011. The ASCV TOC Model shall convey a complete lifecycle cost estimate for the ASCV Program based on the ASCV design developed. The Government will provide top-level assumptions for the TOC Model as J-6, Government TOC Model Assumptions. The ASCV TOC Model shall include, and be broken down by: Research Development Test and Evaluation (RDT&E) – Phase I Design and Phase II EDM tasks and Procurement – Phase II LRIP units Tasks and Phase III FRP units. Operations & Support (O&S) – Sustainment and Disposal costs are not required at this phase of the program. The ASCV TOC Model format shall reflect the CWBS.

The ASCV TOC Model shall contain the CWBS data element dictionary. The ASCV TOC Model shall report and define the required number of labor hours, labor rates (by labor category, position, and/or grade), and scope of labor effort by the lowest level CWBS element. The ASCV TOC Model shall utilize a build-up approach for labor, material, and other direct costs for all sections of the report. The ASCV TOC Model shall represent cost from unburdened direct dollars to partially burdened cost (includes overhead, fringe, etc.) to fully burdened price line cost (includes Facilities Capital Cost of Monies (FCCM), General and Administrative (G&A), and profit/fee). All cost shall be defined at the lowest CWBS element level. In the development of labor learning and material cost improvement curves, the Contractor shall provide sufficient justification and/or supplemental data to support the learning and production curves.

The Contractor shall maintain and provide a history of changes to the ASCV TOC Model and rationale for those changes. Information required to use the ASCV TOC Model such as user guides, training materials, etc., shall be provided with the initial submittal.

C.3.1.3.1 TOC MODEL: RDT&E

The RDT&E section of the ASCV TOC Model shall include all Contractor controlled actuals (as incurred) plus estimates for the program for all material, labor and other direct costs funded using development appropriated funds.

C3.1.3.2 TOC MODEL: PROCUREMENT

The procurement cost section of the ASCV TOC Model shall include projected contractor controlled costs for vehicle production. The procurement section should include estimated costs, where available, for materials, labor, and other direct costs incurred in the fabrication, checkout, and processing of parts, subassemblies, major assemblies, and subsystems needed for the final system, and associated burdens necessary to build complete production vehicles. Additionally, the procurement cost section should include, where available, projected contractor controlled costs associated with nonrecurring engineering, training, data, logistics, support equipment, ancillary equipment, or initial spares.

C.3.2 Design Reviews

Design Reviews shall include participation in one (1) design kick off review, two (2) design status reviews, and (1) one formal preliminary design review. Design reviews shall include documentation of completed portions of the Preliminary Design Package; design risks; near-term task planning; project execution risks; and review of most recent Contract Progress, Status, and Management Report (CPSMR), at a minimum.

C.3.3 Draft Systems Engineering Management Plan

Draft Systems Engineering Management Plan (SEMP) for contract Phases II and III shall describe program planning and implementation of planning to manage concurrent and interactive efforts of all program disciplines affecting ASCV systems engineering and construction. The Draft SEMP shall be developed in accordance with ANSI/EIA 632. The Draft SEMP shall include the following, as a minimum:

a) Description of all new processes and tooling developed exclusively to meet the requirements of Phases II and III and address how these processes will be validated.

b) Description of how the approach followed will meet the system performance requirements and minimize life cycle costs.

c) Contract Work Breakdown Structure (CWBS). The CWBS shall extend from the SEP, Program Work Breakdown Structure (PWBS). The CWBS shall be developed to the fifth level at a minimum. The Contractor shall use MIL-STD-881D for guidance.

d) Drawing Tree, Level II.

e) Task dictionary that details each work breakdown structure element required to perform the total contract and its relation to each product required to complete the contract.

f) Systems Engineering Management Schedule (SEMS).

g) Identification of long lead items and order schedule to support orderly construction.

h) Identification of all software (brand, product, and version) required to design, analyze, estimate the system’s cost, schedule, performance.

i) Documentation of Equipment and Component standardization process.

j) Configuration Management (CM) approach.

k) Draft Systems Requirements Verification Matrix (SRVM) for Contract Phases II and III shall contain the requirement number, requirement text, and verification method for each requirement, IAW ASCV Performance Specifications. Verification methods shall be analysis, inspection, demonstration, and/or test as defined in DAU Systems Engineering Fundamentals Chapter 7 (page 66).

C.4 DELIVERABLES DESCRIPTION

C.4.1 Preliminary Design Models

C.4.1.1 General Arrangements Model

The contractor shall provide the ASCV Preliminary Design General Arrangements Model in both native and “STP” file formats. The native file format refers to the default file format of the modeling software package that the original design model was created in. A “STP” file format is an industry standard three-dimensional assembly file supported by multiple mechanical design programs. “STP” files conform to the STEP Application Protocols, ISO

10303-21. Note: “STP” files may also use the less common “STEP” extension in accordance with CDRL A005.

C.4.1.2 Freeform Curves Model

The contractor shall provide the ASCV Preliminary Design Freeform Curves Model in a Non-uniform rational basis spline (NURBS) based model, in either “IGES” ANSI standard or “.3DM” Rhinoceros ® file formats and in accordance with CDRL A006.

C.4.1.3 TOC Model

The contractor shall provide the ASCV Preliminary Design TOC Model in Excel “.xlsx” file format, developed by Microsoft Inc. and in accordance with CDRL A011.

C.4.2 Drawings

C.4.2.1 All drawings shall be provided in the “.PDF” file format and in accordance with CDRL A004.

C.4.3 Intact Stability Assessments

C.4.3.1 GHS Analysis Input Files

The contractor shall provide the GHS input files used to analyze vehicle’s intact stability, including geometry files, “.GF” GHS data format and the run files, “RF” GHS data format and in accordance with CDRL A007.

C.4.3.2 GHS Analysis Output Files

The contractor shall provide the GHS output files, used to analyze vehicle’s intact stability, in the “.PDF” file format and in accordance with CDRL A008.

C.4.4 Reports

C.4.4.1 Progress Reports

Contract Progress, Status, and Management Report (CPSMR) shall be developed in the contractor’s format, addressing required content. CPSMR shall be provided in Microsoft Word or “.pdf” file formats and in accordance with CDRL A003.

C.4.4.2 Technical Reports

ASCV Performance Assessment Report shall be developed in the contractor’s standard report format. Reports shall be provided in Microsoft Word or “.pdf” file formats and in accordance with CDRL A009.

C.4.5 Reviews Documentation

Review Documentation shall be developed in the contractor’s standard review documentation format, addressing required content. Review Documentation shall be provided in Microsoft PowerPoint or “.pdf” file format and in accordance with CDRL A001.

C.4.6 Draft SEMP

Draft SEMP shall be developed in the contractor’s format, addressing required content. Draft SEMP shall be provided in Microsoft Word file format and in accordance with CDRL A012.

C.4.7 Proposed CWBS

Proposed CWBS shall be developed in the contractor’s format, addressing required content. Proposed CWBS shall be provided in Microsoft Word file format and in accordance with CDRL A010.

C.5 Delivery Schedule

C.5.1 Design kick off review, 1 day between 0-10 days after award.

C.5.2 Technical Report listing all software (brand, product, and version) that will be used to design, analyze, estimate the system’s cost, schedule, performance shall be provided in accordance with CDRL A002 30 days after award.

C.5.3 Proposed Contractor Work Breakdowns Schedule (CWBS), as part of Draft SEMP preparation – 45 days after award.

C.5.4 First Contract Progress, Status, and Management Report (CPSMR) – 60 days after award.

C.5.5 First design status reviews, 1 day between 61-70 days after award.

C.5.6 Second CPSMR – 120 days after award.

C.5.7 Draft TOC Model – 120 days after award.

C.5.8 Second design status reviews, 1 day between 121-130 days after award.

C.5.9 Draft Systems Engineering Management Plan – 160 days after award.

C.5.10 Final TOC Model – 160 days after award.

C.5.11 Preliminary Design Package – 165 days after award.

C.5.12 Formal preliminary design review, 1 day between 175-180 days after award.

C.5.13 Final CPSMR – 180 days after award.

C.6 Personnel Requirements

C.6.1 GENERAL

The requirements of Section 3 dictate the need for experienced personnel capable of managing and executing tasks with current working knowledge that qualifies them to perform the tasks. The Key Personnel below will have varying levels of effort across the ASCV Program Contracting Phases I through III; however, Key Personnel are required to be identified for Phase I to ensure there is no disruption to the work and ensure Phase I planning is relevant to Phase II and III execution. The paragraphs below describe the Key Personnel. Each individual proposed by the contractor should have demonstrated qualifications for the Key Personnel labor categories identified below.

C.6.2 Personnel Qualifications for Key Personnel

The Government has identified six (6) Key Personnel required to complete the ASCV Program Contracting Phase I.

The target qualifications for the key personnel labor categories are provided below. For the qualifications listed below, the term “platform” applies to amphibious vehicles, boats or ships, or land vehicles.

Program Manager: targets twenty (20) years of professional experience in project management of platform systems and subsystems development and production. Program Manager should have proven experience in developing budgets and schedules and coordinating efforts for multiple tasks. This individual should be an effective liaison with government and contractor management and have a thorough understanding of DoD requirements, policies, and procedures related to acquisition programs.

Principal Engineer: targets twenty (20) years of professional experience in organizing, managing, and executing technical activities that pertain to platform systems and subsystem development, with applications relevant to the ASCV tasks identified in Phases I through III. The Principal Engineer shall have a Bachelor of Science (BS) degree in engineering. An advanced degree in engineering or related discipline can be substituted for five years of experience. Experience shall include preparation and oversight of engineering calculations; oversight of platform design studies; and developing new platforms for customers.

Senior Naval Architect: targets ten (10) years of progressively responsible professional experience applying the principles of naval architecture to boat or ship design and development efforts, relevant to the ASCV tasks identified in Phases I through III. The Senior Naval Architect shall have a BS degree in naval architecture and shall be professionally licensed.

Senior Systems Engineer: targets ten (10) years of progressively responsible professional experience applying the principles of systems engineering to platform design and development efforts, relevant to the ASCV tasks identified in Phases I through III. The Senior Systems Engineer shall have a BS degree in engineering. Experience shall demonstrate a thorough understanding of DoD Systems Engineering policies and procedures related to acquisition programs.

Senior Control Systems Engineer: targets ten (10) years of professional experience developing control systems for platforms, relevant to the ASCV tasks identified in Phases I through III. The Senior Control Systems Engineer shall have a BS degree in mechanical, marine, or electrical engineering. However, A BS degree in another engineering science with an additional five years of experience for a total of fifteen (15) years of experience may be substituted for a mechanical, marine, or electrical engineering degree.

Senior Propulsion Design Engineer: targets ten (10) years of professional experience developing platform propulsion systems, with applications relevant to the ASCV tasks identified in Phases I through III. The Senior Propulsion Design Engineer shall have a BS degree in mechanical, marine, or electrical engineering. However, A BS degree in another engineering science with an additional five years of experience for a total of fifteen (15) years of experience may be substituted for a mechanical, marine, or electrical engineering degree.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.227-1 52.227-2 252.227-7013 252.227-7014 252.227-7015

252.227-7016 252.227-7017 252.227-7019 252.227-7025 252.227-7027 252.227-7028 252.227-7030 252.227-7037 252.227-7038 252.246-7001

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J

Attachment Description Number of Pages

J-1: Instructions to obtain ASCV Performance Specification, LARC-V

A1/A2 Placemat, and ASCV CONOPS (Distribution D) 1 page

J-2: Past Performance Questionnaire 7 pages

J-3: Small Business Subcontracting Record 3 pages

J-4: Small Business Participation and Commitment Strategy 4 pages

J-5: Contract Data Requirements List (CDRL) – 12 CDRLs 36 pages

J-6: Total Ownership Cost Model Assumptions 2 pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

SECTION L

L.1 INQUIRIES BY PROSPECTIVE OFFERORS

Offerors may submit inquiries, concerns, or request clarification of any aspect of this solicitation via electronic mail to the Contract Specialist, Nicole Bell at nicole.m.bell@navy.mil and Antoinette Ceglia and antoinette.ceglia@navy.mil. The Offeror must include N39430-19-R-2117 ASCV Questions and Company Name in the email subject line. All inquiries shall include the page number and paragraph number or identifier, which pertains to the Offeror’s question. Inquiries should be submitted before 20 May 2019 at 5:00pm Pacific.

All questions will be answered via written amendment to the solicitation.

L.2 ORGANIZATION OF OFFER

Organization. The proposal shall contain all pertinent information in sufficient detail to conduct an effective evaluation. The information shall be organized as follows:

a. Standard Form 33, Solicitation, Offer, and Award and all its Amendments in Standard Form 30

b. Confirmation of VETS-4212 report(s) filing

c. Requirements of Section K

d. Volume I – Technical Proposal

e. Volume II – Price Proposal

L.3 CONTENT AND GENERAL INSTRUCTIONS

Volume/Tab Title Max No. of Pages A Standard Form 33 & Amendments -- B Confirmation of VETS-4212 report(s) filing

C Requirements of Section K -- 1/1 Factor 1: Technical Capability

30 (32 for joint ventures) 1/2 Factor 2: Safety 1/3 Factor 3: Small Business Utilization 2 1/4 Factor 4: Past Performance -- 2 Price Proposal --

a. Each volume of the porposal shall be separately bound in a three-ring loose-leaf binder that permits the volume to lie flat when open. Staples shall not be used. A cover sheet shall be bound in each volume indicating volume number, title (price or technical proposal), copy number, solicitation number, and the Offeror's name. The same identifying data shall be placed on the spine of each binder. Offerors shall submit proposals in response to this solicitation in both paper (hard copy) and CD in PDF (electronic).

b. Each section shall start on a new page and pages shall be sequentially numbered and identified with the name of the Offeror and the RFP number. No price information shall be contained in your technical proposal except that which is specifically required.

c. Each volume of the proposal shall contain a detailed table of contents to outline the subparagraphs. Tab indexing shall be used to identify/separate sections.

d. Each volume shall contain a glossary of all abbreviations and acronyms used with an explanation for each.

Glossaries do not count against page limitations.

e. Standard Form 33, Solicitation, Offer, and Award and all its Amendments in Standard Form 30: A copy of the Standard Form 33 with blocks 12 through 18 completed, signed by an authorized representative of your company by the closing date and time indicated on the face page of the RFP, shall be included.

f. Confirmation of VETS-4212 report(s) filing: A copy of the email confirmation of VETS-4212 reports(s) filing at www.dol/vets/vets4212.htm, as required by regulation (41 CFR Part 61-300), shall be included. Upon the successful submission of a VETS-4212 report(s), federal contractors will receive an email confirmation of receipt notification for their records. These confirmation notifications will be used as verification of submission by the Contracting Officer. A copy of a submitted report is NOT required to suffice for a confirmation /validation of submission.

g. Requirements of Section K: Offerors shall include an additional section in their proposal that addresses all the requirements in Section K of this solicitation, and shall include a statement of its representations and certifications in the System for Award Management (SAM). Offerors shall provide identification of any Organizational Conflict of Interest.

h. Volume/Tab A, B, and C may be included in the Volume II, Price Proposal binder.

L.4 INSTRUCTIONS FOR SUBMISSION OF OFFERS

Offerors shall submit proposals in response to this solicitation in paper (hard copy) format as follows:

(1) Page limits, if stipulated, must be adhered to. The proposal shall be typewritten and shall be presented on Standard 8.5” x 11” inch paper, one-inch margins, single-spacing using 12-point Times New Roman font. Pages submitted which exceed the page limits will not be considered in the evaluation. The Cover Letter, blank pages, tables of contents, glossaries, indexes, and Key Personnel resumes are not considered a "page" for page limit purposes.

(2) HARD COPY INSTRUCTIONS: The proposal shall be submitted to the address cited below. The package(s) shall be marked with the name of the Offeror, the solicitation number, and the date and time specified for receipt of proposals. No other markings shall be used on the package(s). Proposals not received at the address below on or before the hour and date set forth for receipt of proposals shall be subject to the provisions of FAR 52.215-1 INSTRUCTIONS TO OFFERORS – COMPETITIVE ACQUISITION (JAN 2017). Modifications, amendments, or withdrawal of proposals and other written non-electronic communications should also be made to the address indicated below.

The Offeror shall submit a technical and price proposal in the following format:

• Volume I – Technical Proposal: Submit one (1) original technical proposal and three (3) copies separately bound and organized by evaluation factor in paper (hard copy) format.

• Volume II – Price Proposal: Submit one (1) original signed price proposal and one (1) copy separately bound and organized in paper (hard copy) format.

(3) Submit all of the requested paper (hard copy) to the following address:

NAVFAC EXWC Acquisitions Department Code ACQ73 Naval Base Ventura County Attn: Nicole Bell & Antoinette Ceglia, N39430-19-R-2117 ASCV 1000 23rd Avenue, Bldg. 1100, Room B105 Port Hueneme, CA 93043-4301

(4) Offerors are advised to be aware of FAR 15.208 and take proper steps to ensure timely receipt of their proposals at NAVFAC EXWC Acquisitions Department, Code ACQ73, Naval Base Ventura County, Port Hueneme.

L.5 SUBMISSION REQUIREMENTS FOR EACH FACTOR

Multiple proposals for different designs for the Amphibious Surf Capable Vehicle (ASCV) from each offeror will be accepted. Offerors submitting multiple proposals shall identify their additional proposals as such. The proposal must be sufficiently detailed and complete to demonstrate an understanding of, and the ability to comply with, all the requirements specified in Section C, as well as the ability, to the extent specified in Section M, to perform in Phase II and Phase III. General statements "that the offeror can or will comply with the requirements," "standard procedures will be used," "well known techniques will be used," or that paraphrase the Statement of Work in whole or in part will not satisfy the requirements of this RFP. Failure to conform to the requirements of this RFP may form the basis to reject the proposal.

A written award or acceptance of offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer shall result in a binding contract without further action by either party. Prior to expiration of the offer, the Government may accept an offer, unless a written notice of withdrawal is received before award.

(1) Factor 1, TECHNICAL APPROACH:

Solicitation Submittal Requirements: The Offeror shall describe their technical approach to fulfilling the requirements of the SOW in sufficient detail to demonstrate that it has a clear understanding of the requirements laid out in the SOW including developing a system that meets the requirements of the Performance Specification.

a. The Offeror shall provide its plan to complete full design, engineering, manufacturing, and test of the ASCV under Phases II and III. The plan shall address the Offerors approach to continuously evaluate and integrate both existing and emerging commercial and non-developmental technology as a function of their systems engineering process to develop a lowe risk, cost effective solution.

b. Key Personnel: The offeror shall identify and provide resumes for key personnel. Resumes are limited to two

(2) pages per person. Resumes will include the following: name of the employee, employment history, name of employer, period of employment, description of duties and responsibilities, and title(s) held. Provide description of education and professional license(s) held. Resumes pages are not included in the Volume I page count; however, all resumes will be cut off after page two and will not be evaluated.

The list of required Key Personnel is contained in Section C.

(2) Factor 2 SAFETY

Solicitation Submittal Requirements: The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR, DART and TRC Rates shall not be submitted for subcontractors.)

a. Experience Modification Rate (EMR): Include three previous complete calendar years’ worth of data. This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the factor submission.

b. OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate and Total Recordable Case

(TRC) Rate: Submit three previous complete calendar years’ worth of data. If an offeror cannot submit an OSHA DART and TRC rates, for any year, affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA, DART, and TRC rate data negatively must be addressed as part of this factor submission.

c. Technical Approach for Safety: Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. The offeror shall submit a narrative that fully describes the safety management system that they will used to oversee the safety compliance and performance of self-performed and subcontractor performed work. The offeror will describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels. Additionally, the contactor will describe their methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.

The narrative shall be limited to two pages. For a partnership or joint venture, the submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Safety narratives for joint ventures may be up to four pages in length.

(3) Factor 3 SMALL BUSINESS UTILIZATION

This Factor assesses both the historical achievements in utilizing small business concerns as subcontractors and proposed small business participation and commitment strategies.

Solicitation Submittal Requirements:

a. Achievements: All Offerors shall provide a narrative (limited to two pages) to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance. In support of narrative submissions:

i. All Offerors shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor in the format provided in Attachment J-3, Small Business Subcontracting Record.

ii. Offerors representing as other than small businesses shall also provide copies of the most current individual subcontracting reports (ISRs) associated with each project cited under the Corporate Experience Factor if a small business subcontracting plan was required by the contract. If such projects were completed under specific task orders, provide ISRs for the overall contract. For cited projects with state and local government agencies, provide similar subcontracting performance reports if required by the contracts. When not specifically addressed in the ISR or similar report, Offerors shall provide explanations for all instances of failures to meet dollar or percentage goals in individual subcontracting plans.

Notes:

The Government reserves the right to consider achievements information on other recent, relevant projects from all available sources.

Offerors utilizing achievements information of team members or key subcontractors shall clearly demonstrate how these companies will have meaningful involvement in the management of the subcontracting program for this acquisition. If not, such achievement information will not be considered under this factor. If the offeror is a new joint venture, partnership or other entity consisting of more than one company, provide achievements information for each individual business entity(ies) that will be responsible for managing the subcontracting program and clearly describe those responsibilities.

Failure to provide ISRs or any other requested information must be fully explained and may negatively impact your evaluation.

b. Small Business Participation and Commitment: All Offerors All Offerors shall submit a small business participation and commitment strategy including all data elements shown in Attachment J-4, Small Business Participation and Commitment Strategy.

i. Identify in terms of dollar value and percentage of the total acquisition the extent of work the offeror will self-perform as the prime contractor. If submitting an offer as a joint venture, identify the percentage of work each member will be responsible for and indicate the size status of each member (e.g. small business, woman-owned small business, other than small business).

ii. Include supplemental narratives (limited to five pages) to address other elements of the offeror’s strategy such as binding agreements covering post award roles for execution of the contract and specific initiatives and tools that will be employed under the contract to enhance small businesses opportunities to both participate in this acquisition and build capabilities to support future NAVFAC acquisitions.

iii. The anticipated prime and first tier overall small business participation rate for this acquisition (i.e.

work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value. Offerors are encouraged to exceed this percentage and seek meaningful levels of participation in each of the small business socioeconomic programs listed in Attachment J-4 consistent with efficient contract performance. Offerors shall explain in their participation and commitment strategies how proposed participation rates were established. The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award.

c. SMALL BUSINESS SUBCONTRACTING PLAN (Reference FAR 52.219-9 Alt II and DFARS 252.219-

7003): NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting plan goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.

SB 45%

SDB 5%

HUBZone SB 3%

WOSB 15%

SDVOSB 5%

Small businesses identified by name in Offerors’ proposals/participation and commitment strategies and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e). Material discrepancies between the small business participation and commitment strategy and small business subcontracting plan (if required) shall be corrected and responses provided to questions identified.

If applicable, Offerors shall use the Small Business Subcontracting Plan (Template) for format in submittals.

(4) Factor 4 PAST PERFORMANCE

Solicitiation Submittal Requirements: The contractor shall submit past performance information of 3 past performance projects. If a completed CPARS evaluation is available, it shall be submitted with the proposal. If there is not a completed CPARS evaluation, the past performance questionnaire (PPQ) in Sectin J Attachment J-2 of the solicitation. is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal. The completed PPQs shall be submitted directly from the Offeror’s client filling out the PPQ to the specified Government contract specialist prior to proposal closing date. An Offeror shall not submit a PPQ when a completed CPARS is available. However, it is the responsibility of the Offeror to ensure requested PPQs are submitted directly to the Government from the client.

If the Offeror is unable to confirm that a completed PPQ from a client for a project(s) has been submitted to the Government contract specialists before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (refer to Attachment J-2), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.

As stated above, all PPQs shall be submitted directly to the Government contract specialists, Nicole M. Bell, via email at nicole.m.bell@navy.mil and Antoinette Ceglia, via email at antoinette.ceglia@navy.mil, prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/Entity Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the Offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

(5) Factor 5 PRICE

Submittal Requirements:

a. The Contracting Officer has determined that certified cost or pricing data is not required to be submitted for this solicitation because the “adequate price competition” exception applies (FAR 15.403-1(b)(1). However, Offerors are required to submit other than certified cost or pricing data per the submittal requirements below.

b. The price proposal shall be submitted in a separate volume from the technical proposal. No technical information shall be submitted as part of the price proposal.

c. Complete a price on Contract Line Item (CLIN) 0001 in Section B of the solicitation.

d. Offerors may include the following in Volume II, Price Proposal, binder:

• Standard Form 33, Solicitation, Offer, and Award and all its Amendments in Standard Form 30

• Confirmation of VETS-4212 report(s) filing

• Requirements of Section K

(End of Summary of Changes)