N3904026Q3133 Attachment 3 Enclosure 2 (460VAC 800 AMP 800 KVA ).pdf

PDF 706 KB Posted

Attached to
Isolation Transformers
Solicitation number
N3904026Q3133
Issued by

About this file

This is a Statement of Work (SOW) Compliance Checklist for isolation transformers specified at 460VAC 800 AMP 800 KVA capacity. The checklist is part of Specification #2026 and serves as a template for vendors to document compliance with SOW requirements across three transformer configurations: 460VAC 400 AMP 400 KVA, 460VAC 800 AMP 800 KVA, and 460VAC 1200 AMP 1250 KVA.

The checklist requires vendors to complete two primary assessments: (1) indicate YES or NO compliance with specific SOW requirements organized under Paragraphs 3 through 6, including electrical output specifications, connections, footprint, construction standards, maintenance responsibilities, operator and maintenance manuals, delivery and return procedures, security protocols, inspection criteria, and response timelines; and (2) document any exceptions to SOW requirements with explanations for non-compliance. Vendors must ensure all responses are consistent with supporting documentation such as brochures and specification sheets included in their quotations. The checklist covers requirements in Paragraphs 3.1-3.4 (Requirements), 4.2 and 4.4 (Responsibilities), 5.1-5.3 and 5.5 (Delivery/Return), and 6.1 (General), with blank cells provided for vendor completion of compliance and exception information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISOLATION TRANSFORMERS 460VAC 400 AMP 400 KVA, 460VAC 800 AMP 800 KVA, & 460VAC 1200 AMP 1250 KVA

Spec #: 2026 Rev:- Page 7 of 9

Enclosure 2

Table E2

SOW Compliance Checklist for 460VAC 800 AMP 800 KVA

SOW

REQUIREMENT

COMPLIANCE WITH SOW.

(See Instructions Below)

EXCEPTIONS TO SOW.

(See Instructions Below)

Paragraph 3. Requirements

3.1 Electrical output

3.2 Connections

3.3 Footprint

3.4 Construction

Paragraph 4. Responsibilities

4.2 Maintenance

4.4 Operator / Maintenance Manuals

Paragraph 5. Delivery / Return

5.1 Delivery

5.2 Security

5.3 Inspection Criteria

5.5 Return

Paragraph 6. General

6.1 Response to request

INSTRUCTIONS

2. COMPLIANCE WITH SOW.

(i) Use YES or NO to identify if equipment and services comply with all SOW requirements.

(ii) Ensure answers are consistent with any brochures, specification sheets or other descriptive literature provided in your quote.

3. EXCEPTIONS TO SOW.

(i) Identify any exceptions to the SOW. Note, answers are required for any NO in prior column.

(ii) Explain reason for exception.