Attachment 21 - N39040-23-R-0008 Answers to Industry Questions.docx

DOCX document 19 KB Posted

Attached to
Touch Labor Production Support for Portsmouth Naval Shipyard
Solicitation number
N3904023R0008
Issued by

About this file

This document contains responses to industry questions for solicitation number N3904023R0008 for touch labor production support at Portsmouth Naval Shipyard. The government intends to award five-year indefinite-delivery, indefinite-quantity contracts with cost-plus-fixed-fee level of effort terms. Offerors must demonstrate the capability to perform all trades listed and include training plans, trade training plans, and training records for each trade in their proposals while staying within page count limits. The deadline for proposals remains August 20, 2023 and the checklist should be included in Volume II.

View the file

Other files

File Type Posted
Amendment0003_Discussion_Letter_Memo.docx DOCX document
Enclosure 3_Amendment_23R0008_U0003.pdf PDF
Attachment 24 - Final Questions Answer N39040-23-R-0008.docx DOCX document
Attachment 22 - Entry Regulations.pdf PDF
Amended Solicitation 2 N3904023R0008.pdf PDF
Final Solicitation N3904023R0008 Complete.pdf PDF
Attachment 23 - Amendment 2 - Questions Answer N39040-23-R-0008.docx DOCX document
Final Released Amended Solicitation 1 N3904023R0008.pdf PDF
Attachment 15 - Wage Determination.pdf PDF
Attachment 2 - DD254.doc DOC document
Attachment 13 - Contractor Employee Injury Report.pdf PDF
Attachment 16 - Wage Determination - San Diego.pdf PDF
Attachment 11 - Quality Assurance Surveillance Plan.pdf PDF
Attachment 7 - Past Performance Report Form.doc DOC document
Attachment 9 - Contractor Weekly Reporting Hours.xlsx XLSX spreadsheet
REVISED - CDRL A001 - CDRL A004.pdf PDF
Attachment 17 - Wage Determination - Groton.pdf PDF
Attachment 4 - List of Identity Proofing Documents.pdf PDF
Attachment 8 - Contracted Employee Timesheet.docx DOCX document
Attachment 5- Production Support Direct Rate Spreadsheet.xlsx XLSX spreadsheet
Attachment 12 - QASP Matrix.xlsx XLSX spreadsheet
Attachment 1 - Status Reporting Requirements.pdf PDF
Attachment 14 - DON Testing Designated Positions.pdf PDF
Attachment 6 - Past Performance Information Form.doc DOC document
REVISED CDRL A009 - CDRL A011.pdf PDF
Attachment 10 - Onboarding and Offboarding.xlsx XLSX spreadsheet
REVISED CDRL A005 - CDRL A008.pdf PDF
Attachment 3 - SECNAV 5512-1.pdf PDF
Final Solicitation N3904023R0008.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to Industry Questions Solicitation No. N39040-23-R-0008, Touch Labor Production Support Portsmouth Naval Shipyard

1. Pop is Base + 4 options (per page 8, SOW 1.2). CLINS only for one year (per section B). Answer: The Government intends to award IDIQ contracts with a five-year ordering period as permitted by DFARS 217.204(e)(1). The CLINs and the SOW will be revised to clarify the ordering period.

2. CPFF LOE? Pg 5 fee table & B-232-H005 page 6 Answer: The Government intends to award Cost Plus Fixed Fee Level of Effort contracts.

3. Section L, instructions to Offerors (page 134 of 166) says “3 separate volumes” (Volume I, Volume II and General Volume) but asks for many of the General Volume items to be included in Volume II. Should they be included in both volumes or are all of the “tabs” in the General Volume supposed to be included in Volume II?

Answer: They should be included in both Volumes.

4. Pg 135 of 166 – Para 52.215-1, (c)(2)(i) states that proposals require “a minimum of three (3) labor categories . . . “Does that mean that we do not have to bid on all the trades in the RFP?”

Answer: Offerors are required to demonstrate an understanding of and capability to perform all Trades listed in the Solicitation. The RFP has been amended.

5. Block 9 of the solicitation’s SF 33 identifies the close date of Sunday, 20 Aug 2023. Will the government consider extending the due date to Friday, 25 Aug 2023?

Answer: The Deadline is going to stand as Sunday, 20 AUG 2023.

6. Section L, instructions to Offerors (page 139 of 166) says “**NOTE: If an OCI is applicable, include it in Volume I, Non-Price Proposal with Factor II, Management Approach under a separate tab.” On page 134 of 166, “Tab D. Organizational and Consultant Conflict” states it should be included in the General Volume (one of the 3 volumes called out in paragraph “I. GENERAL” on that same page. Where should this information be provided?

Answer: This should be included in Volume I.

7. Beginning on Page 146 of 166, paragraph 252.215-7009 requires the inclusion of the completed “PROPOSAL ADEQUACY CHECKLIST (JAN 2014)”. In which volume should this checklist be included?

Answer: This checklist should be included in the Volume II.

8. “Factor I require the submission of numerous training items. On page 140 of 166 (second bullet on the page), the RFP states: “. . . . Submit copies of the following: (i) Training Plans for the confined/enclosed space entry, personal fall arrest system, and respirator programs; (ii) Trade Training Plans for each Trade the Offeror intends to perform during contract performance; and (iii) Training Records for ten (10) employees in each Trade the Offeror intends to perform during contract performance.” Submission of these items would greatly exceed the page limits established for this factor. Is it the government's intention to include these in the RFP submission or only for individual task orders after the IDIQ award? If not, can these items be excluded from the page count limits.”

Answer: It is the government’s intention to have these included in the RFP submission.

File details come from the government source that posted it. Updated .