Exhibit C.pdf
PDF 40 KB Posted
- Attached to
- Level 1 Material Cap Screws Federal contract opportunity
- Solicitation number
- N3904022R0043
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3904022R0043 0005 Mod Copy.pdf | ||
| N3904022R0043 0005 Conform Copy.pdf | ||
| N3904022R0043 U00004 Mod Copy.pdf | ||
| N3904022R0043 U00004 CONFORM Copy.pdf | ||
| N3904022R0043 U00003 CONFORM Copy.pdf | ||
| Attachment 3.pdf | ||
| N3904022R0043 U00003 MOD Copy.pdf | ||
| Attachment 1 to Exhibit C.pdf | ||
| N3904022R0043 U00002.pdf | ||
| N3904022R0043 U00001.pdf | ||
| Attachment 2.docx | DOCX document | |
| N3904022R0043 1449.pdf | ||
| Attachment 1 to Exhibit A.docx | DOCX document | |
| Attachment 1 to Exhibit B.docx | DOCX document | |
| Attachment 1.docx | DOCX document | |
| Exhibit A.docx | DOCX document | |
| Exhibit B.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT __________________
PAGE _______
EXHIBIT C
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM: CAP SCREW, HEX SOCKET, CYLINDRICAL HEAD CATEGORY ____________
ITEM NO CONTRACTOR
01 SEQ NO C001
02 DATA DESC MATERIAL CERTIFICATION
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT C
05 CONTRACT REF PARA. C.6.1
06 TECH OFFICE 2305.4
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY ONE/R
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 1/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL 4
16 REMARKS
SEQ. NO. C001
PREPARED BY ________________________________________________ DATE__________________ APPROVED BY ________________________________________________ DATE__________________
DD FORM 1423
01 SEQ NO C002
02 DATA DESC MAGNETIC PARTICLE PROCEDURE
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT C
05 CONTRACT REF PARA. C.6.2
06 TECH OFFICE 135T
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY ONE/R
11 AS OF DATE
12 DATE 1ST SUBM 30 DAYS AFTER DATE OF CONTRACT
13 DATE SUB SUBM
14 DISTRIBUTION 410 1/
15 TOTAL 1
16 REMARKS MAGNETIC PARTICLE INSPECTION PROCEDURE, IN ACCORDANCE
WITH MIL-STD-2132F, SHALL BE SUBMITTED
PROCEDURE MUST BE RESUBMITTED IF REVISED
SEQ. NO. C002
01 SEQ NO C003
02 DATA DESC ZINC PHOSPHATE COATING PROCEDURE
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT C
05 CONTRACT REF PARA. C.6.3
06 TECH OFFICE 134.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY ONE/R
11 AS OF DATE
12 DATE 1ST SUBM 30 DAYS AFTER DATE OF CONTRACT
13 DATE SUB SUBM
14 DISTRIBUTION 410 1/
15 TOTAL 1
16 REMARKS
SEQ. NO. C003
File details come from the government source that posted it. Updated .