MM GROUP CONSULTING ENGINEERS
FINAL SURVEY REPORT
BUILDING 61 NET ZERO FACILITY N33191-14-D-1002 T.O. 014
N33191-14-D-1002 T.O.0014
BUILDING 61 NET ZERO FACILITY
NSA SOUDA BAY, CRETE, GREECE
SECTION C – CIVIL SURVEY REPORT
C-01 Criteria
a. Scope of Work received 17th November 2014
b. Site Visit & Meeting on 22nd December 2014 at NSA Souda Bay, Crete, Greece
c. T.O.015 Awarded on 15th January 2015
d. Site survey on 16th January 2015 at NSA Souda Bay, Crete, Greece
C-02 Scope of Work
Scope of this project is the design of a photovoltaic awning in front of Building 61, which will provide additional shading for the windows and the hobby shop overhead doors that are typically open during operational hours.
The purpose of this project is to provide the writing and delivery of a Small Project Template RFP document that will include Parts 1, 2, 2 Attachment A, 3, 4, 5 and 6. The delivered document must cover the following work items:
a. Design PV system to include the PV panels, structural support system, inverters and the required electrical connections to the existing electrical distribution system, for a complete operating system.
b. Provide load analysis of the existing conditions in order to evaluate the current electrical system before the renewable energy system integration.
c. Design package will generate all technical specifications for installing the PV system at maximum operational efficiency.
d. Design basis to take into account the most updated technology for PV panel efficiency & ratings.
e. Install PV awning system according to design & manufacturer’s specifications.
f. Commission PV system and provide training to NAVFAC personnel.
g. Install net metering system and connect with AMI base infrastructure.
h. Reference as built drawings for lighting systems in order to upgrade interior fixtures to
LED technology. Follow manufacturer’s specifications for replacing fluorescent lamps with LED tubes.
i. Reference as built drawings for lighting systems in order to replace exterior fixtures with LED fixtures.
C-03 Survey Findings
The site is located in NSA Souda Bay, Crete, Greece. It contains an existing prefabricated engineered building (PEB), Building 61, which accommodates the Outdoor Adventure Center and the Auto Hobby Shop.
For this survey the existing site was examined. Building 61 is a metal building with an area of 400.03 m². At its west side and at a close distance, there is Building 64, while at north-east there is Building
9/16/2015 N33191-R-15-0403 CLIN 02 ENCL (03) Page 1 of 2
MM GROUP CONSULTING ENGINEERS
FINAL SURVEY REPORT
BUILDING 61 NET ZERO FACILITY N33191-14-D-1002 T.O. 014
32.
Existing utilities include underground water, irrigation, sewer and power lines, as well as overhead and underground electric lines. Also, several power manholes are located near to the building and at the north-east side of the project area there is a substation on a concrete pad. Moreover, at the facade of the building there are six bollards.
Building 61, is surrounded by a concrete pavement at its south and west sides, while at the east side of the project region there is a gravel area.
Finally, at the south side of the region, at a distance of 15 meters, there is a concrete wall with wire fabric fence with three strands barbed wire top (approximate height 2.5 meters).
9/16/2015 N33191-R-15-0403 CLIN 02 ENCL (03) Page 2 of 2