Attach (06) - Basic Pricing Data (A0001).xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- Time Charter of Passenger Transfer Vessel
- Solicitation number
- N3220526R6057
About this file
This is a Basic Pricing Data template file for the Time Charter of Passenger Transfer Vessel solicitation N3220526R6057. The file serves as a pricing template for vendors submitting offers to charter a Jones Act qualified, U.S.-flag passenger transfer vessel to support the Commander, Submarine Force, U.S. Pacific Fleet, near Pearl Harbor, Hawaii. The anticipated charter period (lay days) runs from October 24, 2026, through February 15, 2027. Vendors are required to complete this pricing template as part of their proposal submission to establish the time charter rates and associated costs for vessel services during the specified operational period.
This attachment is part of the broader RFP N3220526R6057 issued by the Department of the Navy Military Sealift Command and was subject to Amendment 0001 effective July 21, 2026, which included revisions to the pricing attachment. Vendors should reference the completed pricing data template along with all other required RFP documentation and attachments when submitting their formal offer, ensuring alignment with the amended requirements and specifications outlined in the solicitation materials.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period
| Attachment (06) | Vessel: | ||
| Basic Pricing Data | RFP: N3220526R6057 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Base Period | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 1
| Attachment (06) | Vessel: | ||
| Basic Pricing Data | RFP: N3220526R6057 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 366-day year | |||
| Option Period One | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 366 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 2
| Attachment (06) | Vessel: | ||
| Basic Pricing Data | RFP: N3220526R6057 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Option Period Two | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 3
| Attachment (06) | Vessel: | ||
| Basic Pricing Data | RFP: N3220526R6057 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Option Period Three | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 4
| Attachment (06) | Vessel: | ||
| Basic Pricing Data | RFP: N3220526R6057 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 335-day year | |||
| Option Period Four | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 335 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Fuel Consumption Data
| Attachment (06) | Vessel: |
| Fuel Consumption Data | RFP: N3220526R6057 |
| Offeror Instructions: Fill in the "barrels/day" used by the vessel proposed, as applicable. Offerors are required to select a fuel type from the below DLA-E fuel table below. Consumption in barrels shall match the Boxes 68-71 of the SPECIALTIME and be reflective of 60 Degrees Farenheit. |
| SPECIALTIME Box # | SPECIALTIME Box Description | Consumption of Barrels/Day | Fuel Type | # Days of Performance |
| 68 | Fuel Underway (laden) | 608 | ||
| 69 | Fuel Underway (ballast) | 0 | ||
| 70 | Auxiliaries underway | 0 | ||
| 71 | Idle Fuel Period | 1370 |
| Notes: | |
| The total number of days include the base period and all options to include the FAR 52.217-8 Option to Extend Services. | |
| The number of days in the box above are considered estimates and shall not form the basis of a future claim. | |
| The Government's fuel consumption calculations will be made using metric tons as the unit of measure. The below table will be used to convert barrels to metric tons. | |
| Conversion Factors for Barrels to Metric Tons | |
| MGO/MDO: | 7.507 barrels per metric ton |
| IFO-180: | 6.526 barrels per metric ton |
| IFO-380: | 6.468 barrels per metric ton |
| The price per metric ton will be based on the following Defense Logisitics Agency - Energy (DLA-E) Standard Prices as indicated in the below table. | ||
| DLA Std Price - 1 July 2026 | ||
| Defense Logistics Agency - Energy (DLA-E) Standard Prices | ||
| MGO/MDO: | per metric ton | $1,188.66 |
| IFO-180: | per metric ton | $759.23 |
| IFO-380: | per metric ton | $752.49 |