J-2.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- USNS HENRY J. KAISER FY 22 ROH/DD
- Solicitation number
- N3220521R4066
About this file
This file contains a price breakdown spreadsheet and statement of work for the USNS HENRY J. KAISER (T-AO 187) FY 22 Regular Overhaul/Dry-Docking (ROH/DD) opportunity. The Military Sealift Command requires regular overhaul and dry-docking services for the vessel, including repairs and maintenance to hull structures, main propulsion systems, electrical systems, communications and navigation aids, auxiliary equipment, habitability spaces, heating/ventilation/air conditioning, and dry-docking services. Pricing is provided for labor hours and materials for Category A and B work items. Other costs include agreed labor hours, other direct costs with a 15% markup, and a total contract price. The solicitation number is N3220521R4066 and responses are due based on the standard solicitation timeline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| KAISER ROH N3220521R4066_AMEND 0003.docx | DOCX document | |
| KAISER ROH N3220521R4066_AMEND 0001.docx | DOCX document | |
| KAISER ROH N3220521R4066_AMEND 0002.docx | DOCX document | |
| J-2.xlsx | XLSX spreadsheet | |
| Attachment J-5 Subcontracting Plan Assessment Checklist.docx | DOCX document | |
| J - 9 Disclosure of Lobbying Activities SF-LLL.doc | DOC document | |
| J - 13 PAST PERFORMANCE QUESTIONNAIRE.pdf | ||
| J-10 Interport Differential.doc | DOC document | |
| J - 14 Technical Data Non-Disclosure (NDA).pdf | ||
| KAISER J4 2021-12-02.xlsx | XLSX spreadsheet | |
| J-11 Dry Dock Evaluation Form.docx | DOCX document | |
| J-8 RFC.doc | DOC document | |
| J-3.xlsx | XLSX spreadsheet | |
| FY22 KAISER JA SIgned 25MAY2021_Redacted.pdf | ||
| J-7 MSC Ship Repair Facility Survey.pdf | ||
| N3220521R4066.docx | DOCX document | |
| J - 12 Past Performance Data.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-2
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Govt Mand TR/Sub Price | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL | |
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | |||||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | |||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | |||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | |||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | |||||||||||
| 006 | HEAVY WEATHER PLAN | |||||||||||
| 007 | COLD WEATHER PLAN | |||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | GENERAL SERVICES (T-AO) | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | MACH SPACE TURN-OVER, DOCK & SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |||||||||||
| 090 | Daily_COVID_19_Prevention_and_Control_Services | |||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NDT KINGPOST AREAS (ABS & USCG) | |||||||||||
| 102 | Close UP Survey (ABS) | |||||||||||
| 103 | BULWARK REPAIRS | |||||||||||
| 104 | Tank_Vent_Protective_Device_Inspection | |||||||||||
| 107 | Containment Tubs Repairs | |||||||||||
| 110 | CT Winch Foundation Repairs | |||||||||||
| 117 | Miscellaneous Steel Repairs | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | Main Engine Fuel Pump Overhauls | |||||||||||
| 202 | Main Reduction Gear Inspection | |||||||||||
| 204 | STBD PORT ME AND PTO CLUTCH COUPLING INSPECTION | |||||||||||
| 205 | ME Shaft Brake Ovhl | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | CIRCUIT BREAKER INSPECTION REPAIR | |||||||||||
| 302 | Switchboard Cleaning and Inspections | |||||||||||
| 303 | Motor Repairs | |||||||||||
| 304 | Tank Deck Cable Hangers | |||||||||||
| 305 | MCT_Repairs | |||||||||||
| 306 | PTO Groom | |||||||||||
| 307 | Pony Motor Overhaul | |||||||||||
| 308 | Annual Generator Inpection | |||||||||||
| 353 | THERMOGRAPHIC SURVEY | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 409 | DOPPLER_SPEED_LOG_PREVENTATIVE_MAINT | |||||||||||
| 410 | OE-82_UHF_SATCOM_ANTENNA_OVERHAUL | |||||||||||
| 412 | UHF_SATCOM_&_URC-200_LOS_TRANSCIEVER | |||||||||||
| 430 | UHF_Hand_Held_Radio_Transceiver_System_Upgrade | |||||||||||
| 431 | ECDIS_Radar_Replacement_Upgrade | |||||||||||
| 451 | Annual_Radar_Service | |||||||||||
| 452 | Annual_ECDIS_Service | |||||||||||
| 453 | Annual_GYRO_Service | |||||||||||
| 454 | Annual_VDR_Recertification | |||||||||||
| 455 | Annual_Radio_Com_Equip_Recert | |||||||||||
| 457 | EPIRB_Service_(5_Yr) | |||||||||||
| 458 | Antenna_Maintenance_Whip,_Dipole_and_NGW. | |||||||||||
| 459 | Annual_Service_and_Adjust_Magnetic_Compass | |||||||||||
| 460 | URT-23(D)_URR-2368A_HF_Set_Groom | |||||||||||
| 461 | Fathometer Single to Dual Upgrade | |||||||||||
| 500 | ||||||||||||
| 501 | Aux Boiler Service Coil Repl | |||||||||||
| 502 | Various Piping Repairs | |||||||||||
| 503 | CT WINCH OVHL | |||||||||||
| 504 | Relief Valve and Pressure Vessel Testing | |||||||||||
| 505 | SSDG ENGINE SERVICE Turbo Ovhl | |||||||||||
| 506 | SSDG ENGINE SERVICE ALCO GOVERNOR | |||||||||||
| 507 | SSDG ENGINE SERVICE - ALCO (8K HRS) | |||||||||||
| 508 | SSDG ENGINE SERVICE - ALCO (12KHRS) | |||||||||||
| 509 | SSDG ENGINE SERVICE - ALCO (24K HRS) | |||||||||||
| 511 | THERMOMETERS GAUGE CAL | |||||||||||
| 512 | Main Engine Exh. Insul. | |||||||||||
| 513 | Condensate Drain Tank Repairs | |||||||||||
| 514 | PUMP OVERHAUL | |||||||||||
| 528 | STEERING GEAR MAINTENANCE (5 YR) | |||||||||||
| 530 | ENGINE ROOM OWS AND CARGO OCM | |||||||||||
| 535 | REFRIGERATION AND AC SYSTEM SERVICE | |||||||||||
| 536 | REFRIGERATED CONEX BOX PM | |||||||||||
| 560 | PERSONNEL ELEVATOR INSPECTION | |||||||||||
| 562 | SCBA ANNUAL INSPECTION | |||||||||||
| 563 | SCBA COMPRESSOR AND FILL STATION | |||||||||||
| 565 | FIXED GAS FIREFIGHTING SYSTEM - INSPECTION AND TEST | |||||||||||
| 567 | FIXED FOAM SYSTEM INSPECTION | |||||||||||
| 569 | FIRE SMOKE DETECTION ALARM SYSTEMS | |||||||||||
| 570 | PORTABLE FIRE EXTING SERVICE | |||||||||||
| 571 | FIRE AND SMOKE DAMPER SERVICE | |||||||||||
| 572 | DEEP FAT FRYER GRILL AND RANGE HOOD FIRE EXTING | |||||||||||
| 573 | FIREHOSES | |||||||||||
| 574 | FIRE DOORS AND SHUTTERS | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | GALLEY EQUIPMENT SERVICE | |||||||||||
| 603 | HALON BOTTLE REBUILD | |||||||||||
| 608 | Falls Renewal and Recertify Lifeboat Winch | |||||||||||
| 651 | Annual_Lifeboat_&_Davit_Inspection | |||||||||||
| 653 | Annual_Rescue_Boat_&_Davit_Inspection | |||||||||||
| 655 | Immersion_Suit_Service | |||||||||||
| 656 | Annual_Liferaft_Certification | |||||||||||
| 657 | Accommodation_Ladder_Inspect_and_Test | |||||||||||
| 800 | HEATING, VENTILATION, & AIR CONDITIONING | |||||||||||
| 801 | Air Handler Fan and Motor Overhaul | |||||||||||
| 802 | Vent Duct Repairs | |||||||||||
| 803 | Galley Range Exhaust System Cleaning | |||||||||||
| 852 | Laundry_Exhaust_Cleaning | |||||||||||
| 900 | DRY-DOCKING AND UNDOCKING | |||||||||||
| 901 | Docking Undocking | |||||||||||
| 902 | Propeller shaft weardown | |||||||||||
| 903 | Rudder and Stern Examination | |||||||||||
| 904 | Bilge_Keel_Inspection | |||||||||||
| 905 | CRP Propeller Maint | |||||||||||
| 906 | Stern Tube Seal Maint | |||||||||||
| 909 | Anchor Chain LCKRS | |||||||||||
| 910 | Overhauling Sea Valves | |||||||||||
| 911 | Cathodic Protection System | |||||||||||
| 916 | Spurs_Line_Cutter_Inspection | |||||||||||
| 960 | UNDERWATER HULL PAINTING | |||||||||||
| 961 | FREEBOARD PRESERVATION | |||||||||||
| 963 | Sea Chest Marine Growth Prevention | |||||||||||
| 966 | Shaft Alignment and Bearing Reaction Checks | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | Various 01 level Kick Pipe Replacements | |||||||||||
| 1002 | Winch control booth window replacement | |||||||||||
| 1003 | RAM FOUNDATION_REPAIRS | |||||||||||
| 1004 | HIGHLINE WINCH REFURBISHEMNT | |||||||||||
| 1005 | TOPPING LIFT WINCH OVERHAUL | |||||||||||
| 1006 | HAULING WINCH FOUNDATION PAD REPLACEMENT | |||||||||||
| 1007 | REFURBISHMENT OF FUELING AT SEA BLOCKS | |||||||||||
| 1051 | HP AIR RELIEF VALVE INSPECT AND TEST | |||||||||||
| 1052 | CARGO GEAR RENEWAL SURVEY | |||||||||||
| TOTAL CATEGORY "A" ITEMS | ||||||||||||
| CATEGORY "B" ITEMS | ||||||||||||
| 25 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |||||||||||
| 26 | VESSEL_FINAL_CLEANING | |||||||||||
| 30 | CONTINUATION OF SERVICES | |||||||||||
| 108 | Steel Replacement | |||||||||||
| 510 | MISCELLANEOUS_PIPING_REPALCE | |||||||||||
| 913 | 'Zinc Anode Replacement | |||||||||||
| 914 | DRYDOCKING AND UNDOCKING SHIP CONTINUATION | |||||||||||
| Total Category "B" Items | ||||||||||||
| OTHER COSTS | ||||||||||||
| AGR HOURS 10,000 HOURS @ $60/HR | ||||||||||||
| ODC | ||||||||||||
| 15% MARKUP ON ODC | ||||||||||||
| TOTAL OTHER COSTS | ||||||||||||
| CONTRACT TOTAL |
| USNS Kaiser (T-AO 187) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-17-R-4008 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .