J-7 MSC Ship Repair Facility Survey.pdf

PDF 536 KB Posted

Attached to
USNS HENRY J. KAISER FY 22 ROH/DD
Solicitation number
N3220521R4066
Issued by

About this file

This document contains a ship repair facility survey form and information on a related federal contract opportunity for ship repair services. The survey form requests technical details about a shipyard's facilities, equipment, capacity, and experience to support the Military Sealift Command's (MSC) requirement for regular overhaul and drydocking services for the USNS HENRY J. KAISER (T-AO 187). Interested shipyards must complete the survey form and submit it along with supporting documentation by the closing date of the solicitation, N3220521R4066, to be considered for the work. The contract will be awarded by the Department of the Navy's MSC and requires repair and maintenance of the vessel to be performed from FY 2022.

View the file

Other files

File Type Posted
KAISER ROH N3220521R4066_AMEND 0003.docx DOCX document
KAISER ROH N3220521R4066_AMEND 0001.docx DOCX document
KAISER ROH N3220521R4066_AMEND 0002.docx DOCX document
J-2.xlsx XLSX spreadsheet
J-2.xlsx XLSX spreadsheet
Attachment J-5 Subcontracting Plan Assessment Checklist.docx DOCX document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 13 PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
J-10 Interport Differential.doc DOC document
J - 14 Technical Data Non-Disclosure (NDA).pdf PDF
KAISER J4 2021-12-02.xlsx XLSX spreadsheet
J-11 Dry Dock Evaluation Form.docx DOCX document
J-8 RFC.doc DOC document
J-3.xlsx XLSX spreadsheet
FY22 KAISER JA SIgned 25MAY2021_Redacted.pdf PDF
N3220521R4066.docx DOCX document
J - 12 Past Performance Data.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-21-R-4066 USNS HENRY J. KAISER (T-AO 187)

ATTACHMENT J - 7 MSC Form 4330/26

SHEET 1 OF 5

MSC SHIP REPAIR FACILITY SURVEY

NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511

SHIPYARD AND ADDRESS SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

BUILDING WAYS (M. I. W.)

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

DEPTH OF WATER

OVER

WAY END

AT DROP

OFF NO.

CRANES SERVING WAY

TYPE

LIFT CAPACITY

(std. tons)

CERTIFICATION DATE &

CERTIFIED BY WHOM

TIDAL RANGE (DIFF. OF M.L. M.H) IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

IS SNUBBING NECESSARY?

YES NO

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (means high water)

NO. TYPE LENGTH

(actual & usable)

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

WATER DEPTH

(M. L. W.)

IN-

BOARD

OUT-

BOARD

HEIGHT

OF

DOCK

(M.L.W.)

USE

REPAIR/

OUTFIT-

ING

SERVICES AVAILABLE

(use abbreviation of service below)

DOCK

NO.

MATERIAL TYPE

Floating--(FD) Graving--(GD) Marine Railway (MR)

DRY DOCKS (continued)

DOCK

NO.

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH

at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON

(FD)

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD)

BLOCKS

LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM &

(STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT

RAILROAD CONNECTION (identify)

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)

SHIPYARD:

MSC SHIP FACILITY SURVEY (continued)

PRINCIPAL SHOPS AND BUILDINGS

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

DIMENSIONS OF

SHOP OR BUILDING

LARGEST EXIT

WIDTH HEIGHT

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

LIST TYPES OF WORK NORMALLY SUBCONTRACTED ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO

SHIPYARD:

MSC SHIP REPAIR FACILITY SURVEY (continued)

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

CURRENT

CURRENT

SHIFTS POTENTIAL MAXIMUM

MAXIMUM

SHIFTS NORMAL

NORMAL

SHIFTS

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

File details come from the government source that posted it. Updated .