J-7 MSC Ship Repair Facility Survey.pdf
PDF 536 KB Posted
- Attached to
- USNS HENRY J. KAISER FY 22 ROH/DD
- Solicitation number
- N3220521R4066
About this file
This document contains a ship repair facility survey form and information on a related federal contract opportunity for ship repair services. The survey form requests technical details about a shipyard's facilities, equipment, capacity, and experience to support the Military Sealift Command's (MSC) requirement for regular overhaul and drydocking services for the USNS HENRY J. KAISER (T-AO 187). Interested shipyards must complete the survey form and submit it along with supporting documentation by the closing date of the solicitation, N3220521R4066, to be considered for the work. The contract will be awarded by the Department of the Navy's MSC and requires repair and maintenance of the vessel to be performed from FY 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| KAISER ROH N3220521R4066_AMEND 0003.docx | DOCX document | |
| KAISER ROH N3220521R4066_AMEND 0001.docx | DOCX document | |
| KAISER ROH N3220521R4066_AMEND 0002.docx | DOCX document | |
| J-2.xlsx | XLSX spreadsheet | |
| J-2.xlsx | XLSX spreadsheet | |
| Attachment J-5 Subcontracting Plan Assessment Checklist.docx | DOCX document | |
| J - 9 Disclosure of Lobbying Activities SF-LLL.doc | DOC document | |
| J - 13 PAST PERFORMANCE QUESTIONNAIRE.pdf | ||
| J-10 Interport Differential.doc | DOC document | |
| J - 14 Technical Data Non-Disclosure (NDA).pdf | ||
| KAISER J4 2021-12-02.xlsx | XLSX spreadsheet | |
| J-11 Dry Dock Evaluation Form.docx | DOCX document | |
| J-8 RFC.doc | DOC document | |
| J-3.xlsx | XLSX spreadsheet | |
| FY22 KAISER JA SIgned 25MAY2021_Redacted.pdf | ||
| N3220521R4066.docx | DOCX document | |
| J - 12 Past Performance Data.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-21-R-4066 USNS HENRY J. KAISER (T-AO 187)
ATTACHMENT J - 7 MSC Form 4330/26
SHEET 1 OF 5
MSC SHIP REPAIR FACILITY SURVEY
NOTE: If survey form has been previously submitted, then enter changes only.
DATE:
Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511
SHIPYARD AND ADDRESS SHIPYARD DATA
Telephone No:
Telex No:
Date Found:
BUILDING WAYS (M. I. W.)
NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE
OF (check one) (ton 2,240 lbs)
WAY
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.
DEPTH OF WATER
OVER
WAY END
AT DROP
OFF NO.
CRANES SERVING WAY
TYPE
LIFT CAPACITY
(std. tons)
CERTIFICATION DATE &
CERTIFIED BY WHOM
TIDAL RANGE (DIFF. OF M.L. M.H) IS FIRE PROTECTION AVAILABLE
ON BUILDING WAY?
YES NO
IS SNUBBING NECESSARY?
YES NO
MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:
BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (means high water)
NO. TYPE LENGTH
(actual & usable)
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
WATER DEPTH
(M. L. W.)
IN-
BOARD
OUT-
BOARD
HEIGHT
OF
DOCK
(M.L.W.)
USE
REPAIR/
OUTFIT-
ING
SERVICES AVAILABLE
(use abbreviation of service below)
DOCK
NO.
MATERIAL TYPE
Floating--(FD) Graving--(GD) Marine Railway (MR)
DRY DOCKS (continued)
DOCK
NO.
MAXIMUM SHIP SIZE
ACCOMMODATED
LENGTH OA-BEAM
LENGTH
at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON
(FD)
CLEAR WIDTH
at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height
DEPTH/DRAFT
OVER OVER OVER
SILL FLOOR KEEL
(GD)
BLOCKS
LIFTING CAPACITY
(ton 2,240)
DATE CERTIFIED, CERTIFIED BY WHOM, &
DATE CERTIFICATION EXPIRES
LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.
Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO
MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:
BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)
MAX REACH HEIGHT OF HOOK
NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM &
(STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES
NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)
MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES
DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT
RAILROAD CONNECTION (identify)
LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)
SHIPYARD:
MSC SHIP FACILITY SURVEY (continued)
PRINCIPAL SHOPS AND BUILDINGS
STORAGE SPACE FOR COMPONENTS AND MATERIALS
(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)
NAME OF SHOP
OR BUILDING
FABRICATING
PLATE
SHEET METAL
SUBASSEMBLY
WOOD WORKING
BOAT ASSEMBLY
OR MOLDING
BOILER
MACHINE
ELECTRICAL
ELECTRONIC
PIPE
FOUNDRY
RIGGER
DIMENSIONS OF
SHOP OR BUILDING
LARGEST EXIT
WIDTH HEIGHT
ALL OTHER SHOPS
(LIST NAMES AND DIMENSIONS)
RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________
WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________
LIST TYPES OF WORK NORMALLY SUBCONTRACTED ACREAGE LEGALLY CONTROLLED
IN USE DEVELOPED TOTAL
ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO
SHIPYARD:
MSC SHIP REPAIR FACILITY SURVEY (continued)
LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM
EMPLOYMENT
MANAGEMENT, ADMINISTRATION
PROFESSIONAL ENGINEERING
PRODUCTION SKILLED
PRODUCTION UNSKILLED
NONPRODUCTION
TOTAL:
CURRENT
CURRENT
SHIFTS POTENTIAL MAXIMUM
MAXIMUM
SHIFTS NORMAL
NORMAL
SHIFTS
REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:
1. PLOT PLAN OF YARD.
2. CERTIFIED DEPTH OF WATER PLOT
3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND
EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.
4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND
DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN
ACCOMPLISHED BY THE APPLICANT.
5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP
REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE
6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN
LIST EACH FACILITY AND ITS LOCATION.
7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM
(NAME/TITLE/PHONE NUMBER).
NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED
File details come from the government source that posted it. Updated .