J-2.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- USNS HENRY J. KAISER FY 22 ROH/DD
- Solicitation number
- N3220521R4066
About this file
This document contains a price breakdown spreadsheet and solicitation for the USNS HENRY J. KAISER (T-AO 187) FY 22 Regular Overhaul/Dry-Docking (ROH/DD). The price breakdown spreadsheet lists various category A and B items required for the ROH/DD, including main propulsion, electrical, communication, habitability, and dry-docking services. Pricing is provided for prime contractor labor and material costs, subcontractor labor and material costs, and other costs such as government mandated technical representatives. The related solicitation was issued by the Military Sealift Command of the Department of the Navy to conduct the ROH/DD in accordance with attachment J-2 of solicitation number N3220521R4066. Responses are due by the date specified in the solicitation. The work will be awarded on a best value basis to the responsible offeror whose proposal follows the solicitation instructions and is determined most advantageous to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| KAISER ROH N3220521R4066_AMEND 0003.docx | DOCX document | |
| KAISER ROH N3220521R4066_AMEND 0001.docx | DOCX document | |
| KAISER ROH N3220521R4066_AMEND 0002.docx | DOCX document | |
| J-2.xlsx | XLSX spreadsheet | |
| Attachment J-5 Subcontracting Plan Assessment Checklist.docx | DOCX document | |
| J - 9 Disclosure of Lobbying Activities SF-LLL.doc | DOC document | |
| J - 13 PAST PERFORMANCE QUESTIONNAIRE.pdf | ||
| J-10 Interport Differential.doc | DOC document | |
| J - 14 Technical Data Non-Disclosure (NDA).pdf | ||
| KAISER J4 2021-12-02.xlsx | XLSX spreadsheet | |
| J-11 Dry Dock Evaluation Form.docx | DOCX document | |
| J-8 RFC.doc | DOC document | |
| J-3.xlsx | XLSX spreadsheet | |
| FY22 KAISER JA SIgned 25MAY2021_Redacted.pdf | ||
| J-7 MSC Ship Repair Facility Survey.pdf | ||
| N3220521R4066.docx | DOCX document | |
| J - 12 Past Performance Data.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-2
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Govt Mand TR/Sub Price | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL | |
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | |||||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | |||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | |||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | |||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | |||||||||||
| 006 | HEAVY WEATHER PLAN | |||||||||||
| 007 | COLD WEATHE PLAN | |||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | GENERAL SERVICES (T-AO) | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | MACH SPACE TURN-OVER, DOCK & SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |||||||||||
| 090 | Daily_COVID_19_Prevention_and_Control_Services | |||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NDT KINGPOST AREAS (ABS & USCG) | |||||||||||
| 102 | Close UP Survey (ABS) | |||||||||||
| 103 | BULWARK REPAIRS | |||||||||||
| 104 | Tank_Vent_Protective_Device_Inspection | |||||||||||
| 107 | Containment Tubs Repairs | |||||||||||
| 110 | CT Winch Foundation Repairs | |||||||||||
| 117 | Miscellaneous Steel Repairs |
| 200 | MAIN PROPULSION |
| 201 | Main Engine Fuel Pump Overhauls |
| 202 | Main Reduction Gear Inspection |
| 204 | STBD PORT ME AND PTO CLUTCH COUPLING INSPECTION |
| 205 | ME Shaft Brake Ovhl |
| 300 | ELECTRICAL |
| 301 | CIRCUIT BREAKER INSPECTION REPAIR |
| 302 | Switchboard Cleaning and Inspections |
| 303 | Motor Repairs |
| 304 | Tank Deck Cable Hangers |
| 305 | MCT_Repairs |
| 306 | PTO Groom |
| 307 | Pony Motor Overhaul |
| 308 | Annual Generator Inpection |
| 353 | THERMOGRAPHIC SURVEY |
| 400 | COMMUNIC ATION & NAV AIDS |
| 409 | DOPPLER_SPEED_LOG_PREVENTATIVE_MAINT |
| 410 | OE-82_UHF_SATCOM_ANTENNA_OVERHAUL |
| 412 | UHF_SATCOM_&_URC-200_LOS_TRANSCIEVER |
| 430 | UHF_Hand_Held_Radio_Transceiver_System_Upgrade |
| 431 | ECDIS_Radar_Replacement_Upgrade |
| 451 | Annual_Radar_Service |
| 452 | Annual_ECDIS_Service |
| 453 | Annual_GYRO_Service |
| 454 | Annual_VDR_Recertification |
| 455 | Annual_Radio_Com_Equip_Recert |
| 457 | EPIRB_Service_(5_Yr) |
| 458 | Antenna_Maintenance_Whip,_Dipole_and_NGW. |
| 459 | Annual_Service_and_Adjust_Magnetic_Compass |
| 460 | URT-23(D)_URR-2368A_HF_Set_Groom |
| 461 | Fathometer Single to Dual Upgrade |
| 500 | |
| 501 | Aux Boiler Service Coil Repl |
| 502 | Varoius Piping Repairs |
| 503 | CT WINCH OVHL |
| 504 | Relief Valve and Presure Vessel Testing |
| 505 | SSDG ENGINE SREVICE Turbo Ovhl |
| 506 | SSDG ENGINE SEVICE ALCO GOVERNOR |
| 507 | SSDG ENGINE SERVICE - ALCO (8K HRS) |
| 508 | SSDG ENGINE SERVICE - ALCO (12KHRS) |
| 509 | SSDG ENGINE SERVICE - ALCO (24K HRS) |
| 511 | THERMOMETERS GAUGE CAL |
| 512 | Main Engine Exh. Insul. |
| 513 | Condensate Drain Tank Repairs |
| 514 | PUMP OVERHAUL |
| 528 | STEERING GEAR MAINTENANCE (5 YR) |
| 530 | ENGINE ROOM OWS AND CARGO OCM |
| 535 | REFRIGERATION AND AC SYSTEM SERVICE |
| 536 | REFRIGERATED CONEX BOX PM |
| 560 | PERSONNEL ELEVATOR INSPECTION |
| 567 | FIXED FOAM SYSTEM INSPECTION |
| 569 | FIRE SMOKE DETECTION ALARM SYSTEMS |
| 570 | PORTABLE FIRE EXTING SERVICE |
| 571 | FIRE AND SMOKE DAMPER SERVICE |
| 572 | DEEP FAT FRYER GRILL AND RANGE HOOD FIRE EXTING |
| 573 | FIREHOSES |
| 574 | FIRE DOORS AND SHUTTERS |
| 600 | HABITABILITY |
| 601 | GALLEY EQUIPMENT SERVICE |
| 603 | HALON BOTTLE REBUILD |
| 605 | SCBA Equipment Annual Service |
| 606 | SCBA Compressor Annual Service |
| 608 | Falls Renewal and Recertify Lifeboat Winch |
| 651 | Annual_Lifeboat_&_Davit_Inspection |
| 653 | Annual_Rescue_Boat_&_Davit_Inspection |
| 655 | Immersion_Suit_Service |
| 656 | Annual_Liferaft_Certification |
| 657 | Accommodation_Ladder_Inspect_and_Test |
| 800 | HEATING, VENTILATION, & AIR CONDITIONING |
| 801 | Air Handler Fan and Motor Overhaul |
| 802 | Vent Duct Repairs |
| 803 | Galley Range Exhaust System Cleaning |
| 852 | Laundry_Exhaust_Cleaning |
| 900 | DRY-DOCKING AND UNDOCKING |
| 901 | Docking Undocking |
| 902 | Propeller shaft weardown |
| 903 | Rudder and Stern Examination |
| 904 | Bilge_Keel_Inspection |
| 905 | CRP Propeller Maint |
| 906 | Stern Tube Seal Maint |
| 909 | Anchor Chain LCKRS |
| 910 | Overhauling Sea Valves r |
| 911 | Cathodic Protection System |
| 916 | Spurs_Line_Cutter_Inspection |
| 960 | UNDERWATER HULL PAINTING |
| 961 | FREEBOARD PRESERVATION |
| 963 | Sea Chest Marine Growth Prevention |
| 1000 | UNREP EQUIPMENT |
| 1001 | Various 01 level Kick Pipe Replacements |
| 1002 | Winch control booth window replacement |
| 1003 | RAM FOUNDATION_REPAIRS |
| 1004 | HIGHLINE WINCH REFURBISHEMNT |
| 1005 | TOPPING LIFT WINCH OVERHAUL |
| 1006 | HAULING WINCH FOUNDATION PAD REPLACEMENT |
| 1007 | REFURBISHMENT OF FUELING AT SEA BLOCKS |
| 1051 | HP AIR RELIEF VALVE INSPECT AND TEST |
| 1052 | CARGO GEAR RENEWAL SURVEY |
| Zinc Anode Replacement |
| TOTAL CATEGORY "A" ITEMS | |
| CATEGORY "B" ITEMS | |
| 25 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY |
| 26 | VESSEL_FINAL_CLEANING |
| 30 | CONTINUATION OF SERVICES |
| 108 | Steel Replacement |
| 510 | MISCELLANEOUS_PIPING_REPALCE |
| 913 | 'Zinc Anode Replacement |
| 914 | DRYDOCKING AND UNDOCKING SHIP CONTINUATION |
| Total Category "B" Items | |
| OTHER COSTS | |
| AGR HOURS 10,000 HOURS @ $60/HR | |
| ODC | |
| 15% MARKUP ON ODC | |
| TOTAL OTHER COSTS | |
| CONTRACT TOTAL |
| USNS Kaiser (T-AO 187) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-17-R-4008 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .