USNS HENRY J. KAISER FY 22 ROH/DD
Solicitation number
N3220521R4066
Issued by

About this file

This document contains a solicitation for the USNS HENRY J. KAISER FY 22 Regular Overhaul/Dry-Docking. The Military Sealift Command requires products and services for the overhaul and dry-docking of the USNS HENRY J. KAISER, including approximately 20,000 pounds of structural steel plate, 7,000 pounds of rolled structural shapes, various piping repairs totaling 800 linear feet of pipe ranging from 2 to 8 inches in diameter, and replacement of up to 160 zinc anodes of various types. Offerors are to provide unit pricing for labor hours and materials, with a maximum of 15 days for continued services if directed. The response due date and award date are not provided.

View the file

Other files

File Type Posted
KAISER ROH N3220521R4066_AMEND 0003.docx DOCX document
KAISER ROH N3220521R4066_AMEND 0001.docx DOCX document
KAISER ROH N3220521R4066_AMEND 0002.docx DOCX document
J-2.xlsx XLSX spreadsheet
J-2.xlsx XLSX spreadsheet
Attachment J-5 Subcontracting Plan Assessment Checklist.docx DOCX document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 13 PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
J-10 Interport Differential.doc DOC document
J - 14 Technical Data Non-Disclosure (NDA).pdf PDF
KAISER J4 2021-12-02.xlsx XLSX spreadsheet
J-11 Dry Dock Evaluation Form.docx DOCX document
J-8 RFC.doc DOC document
FY22 KAISER JA SIgned 25MAY2021_Redacted.pdf PDF
J-7 MSC Ship Repair Facility Survey.pdf PDF
N3220521R4066.docx DOCX document
J - 12 Past Performance Data.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-3

USNS HENRY J. KAISER (T-AO 187) FY 22 ROH
GENERAL REQUIREMENTQTYUIUnit PriceTotalPRIME ContractorSUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
CATEGORY "B"
025PHYSICAL SECURITY AT CONTRACTOR'S FACILITY
7.1'Establish Condition Charlie1DAY$0
7.2'Maintain Condition Charlie1DAY$0
7.1'Establish Condition Delta1DAY$0
7.2'Maintain Condition Delta1DAY$0
WI 025 Sub-Total$0
026VESSEL FINAL CLEANING
7.1Arrangement / Outfitting$0
WI 026 Sub Total$0
030CONTINUATION OF SERVICESQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Parent work item 010 “Overhaul Management Team Services”.15DAYS$0
7.2Parent work item 011” General Services for the Ship”15DAYS$0
7.3Parent work item 012 “Telephone Services15DAYS$0
7.4Parent work item 013 “Project Planning and Monitoring”15DAYS$0
7.5Parent work item 016 “Fire Protection and Ship’s Safety”15DAYS$0
7.6Parent work item 019 "Shipboard Access and Security"15DAYS$0
7.7Parent work item 020 “Gas Free Certificates”15DAYS$0
WI 030 Sub-Total$0
108STEEL REPLACEMENTQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
3.3.1Approx 20,000 lbs of structural steel plate20,000lbs$0
3.3.2Approx 7,000 lbs of rolled structural shapes7,000lbs$0
3.3.3Approx fifty (50) 6" long or less cracked fillet welds50ft$0
3.3.4Approx fifty (50) 7"-12" long cracked fillet welds50ft$0
3.3.5Approx twenty (20) sounding tube striker plates20ea$0
3.3.6Approx twenty (20) pits clad welded20ea$0
WI 108 Sub-Total$0
510MISCL PIPING REPAIRQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
3.1.2.1Fifty (50) linear feet of 8" Schedule 80 carbon steel pipe50ft$0
3.1.2.2One hundred (100) linear feet of 8" Schedule 40 carbon steel pipe100ft$0
3.1.2.3One hundred (100) linear feet of 6" Schedule 40 carbon steel pipe100ft$0
3.1.2.4One hundred (100) linear feet of 5" Schedule 40 carbon steel pipe100ft$0
3.1.2.5One hundred (100) linear feet of 4" Schedule 40 carbon steel pipe100ft$0
3.1.2.6One hundred (100) linear feet of 3" Schedule 40 carbon steel pipe100ft$0
3.1.2.7One hundred (100) linear feet of 2-1/2" Schedule 40 carbon steel pipe100ft$0
3.1.2.8One hundred (100) linear feet of 2" Schedule 40 carbon steel pipe100ft$0
3.1.2.9Twenty (20) 8" flanges 150# flat face, socket welded20ea$0
3.1.2.10Twenty (20) 6" flanges 150# flat face, socket welded20ea$0
3.1.2.11Twenty (20) 5" flanges 150# flat face, socket welded20ea$0
3.1.2.12Twenty (20) 4" flanges 150# flat face, socket welded20ea$0
3.1.2.13Twenty (20) 3" flanges 150# flat face, socket welded20ea$0
3.1.2.14Twenty (20) 2-1/2" flanges 150# flat face, socket welded20ea$0
3.1.2.15Twenty (20) 2" flanges 150# flat face, socket welded20ea$0
WI 510 Sub-Total$0
913Zinc Anode ReplacementQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.2.aType ZSS-12; up to a maximum of twenty (40) anodes40EA$0
7.2.bType ZHC-23; up to a maximum of twenty (40) anodes40EA$0
7.2.cType ZHC-47; up to a maximum of twenty (40) anodes40EA$0
7.2.dType ZEP Style B; up to a maximum of twenty (40) anodes40EA$0
Sub-Total$0
914DRYDOCKING AND UNDOCKING SHIP CONTINUATIONQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Submit unit price per day up to a maximum of 15 days to continue all services in accordance with parent item if directed15DAYS$0
Sub-Total$0
TOTAL$0