RFC 4.docx

DOCX document 4 MB Posted

Attached to
USNS COMFORT (T-AH 20) MTA Federal contract opportunity
Solicitation number
N3220520R7004
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a request for specification clarification related to a mid-term availability solicitation for the USNS Comfort. The request seeks clarification on work items and references for inspecting, servicing, and testing life rafts, drainage pipes, switchgear, generators, fans, and other equipment. It requests additional information on quantities and types of fluids to drain and fill, equipment manuals, drawings of ventilation systems, and service representatives. The responses provide the requested specifications, drawings, part numbers, and alternative service contacts to help contractors fully understand the scope of work and prepare their bids.

View the file

Other files for this federal contract opportunity

Other files attached to USNS COMFORT (T-AH 20) MTA, newest first.
File Type Posted
RFC 7.docx DOCX document
Amendment 8.docx DOCX document
RFC Document 6.docx DOCX document
Amendment 7.docx DOCX document
090_A_(REV A) DAILY COVID-19 PREVENTION AND CONTROL SERVICES (002).docx DOCX document
Amendment 6.docx DOCX document
Amendment 5.docx DOCX document
RFC 5.docx DOCX document
RFC 3 WI 983 Correction.docx DOCX document
Amendment 4.docx DOCX document
Amendment 3.docx DOCX document
J-13 Past Performance Questionnaire.docx DOCX document
RFC 3.docx DOCX document
RFC 2.docx DOCX document
Amendment 2 COMFORT.docx DOCX document
J-2 Category A Item Revised.xlsx XLSX spreadsheet
Amendment 1 USNS COMFORT MTA.docx DOCX document
RFC Amendment 1.docx DOCX document
Solicitation.docx DOCX document
JA for Comfort Jan 2021 MTA Redacted.pdf PDF
J-4 GFP Report.xlsx XLSX spreadsheet
J-9 Disclosure of Lobbying Activities SF-LLL.docx DOCX document
J-8 Request for Spec Clarification.docx DOCX document
J-12 Past Performance Data.docx DOCX document
J-3 Category B Items.xlsx XLSX spreadsheet
J-15 DBIDs.pdf PDF
J-2 Category A Item.xlsx XLSX spreadsheet
J-14 Technical Data Non-Disclosure.docx DOCX document
J-6 CDRLs.zip ZIP file
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220520R7004

USNS COMFORT (T-AH 20) MTA

REQUEST FOR SPECIFICATION CLARIFICATION

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO: 656

PARAGRAPH / SECTION NO: 3.2, 3.3, 4.1, 4.2

TITLE: This work item describes the requirements to inspect, service and test the ships Inflatable Liferafts.

QUESTION:

3.2 Quantity: 76 liferafts to be serviced in 3 batches of 20 rafts/batch and one batch of 16 rafts. I was told there is currently 76 onboard the ship right now is that correct? Also the extra batch is at vane brothers (15 to 16 Estimate)?

3.3 Period of Perform. 1 December 2019 through 30 January 2020. That date is incorrect. POP 1/11/2021 through 03/31/2021 spec needs to be revised.

4.1 The Government will deliver the first batch of the 20 rotable pool rafts to the Contractor’s facility at the start of the period of performance. Is the other 56 liferafts we removing?

4.2 The Government will pick up the last batch of rafts from the Contractor’s facility at the end of the Period of Performance and will store same at the Government’s warehouse. Please confirm.

ANSWER:

3.2 Contractor to service 76 life rafts, 4 groups. Comfort no longer has 20 serviceable spare rafts. Raft serial number inventory to be provided.

3.3 Correct period of performance is 11 Jan – March 31, 2021.

4.1 Comfort does not have the available manpower to rig, deliver, re-deliver and re-rig any life rafts for Jan 2021 MTA. Contractor to bid on all rigging, delivery, re-delivery and proper stowage. Contractor to bid on crane service for all offloading and reloading of rafts, at Pier One (1) NOB.

4.2 The Government at this time, does not expect to have ANY usable rafts to send to storage.

NAME OF CONTRACTOR: _______________________________________________

SPECIFICATION ITEM NO.: ______0187_______________

PARAGRAPH / SECTION NO:_______7.1.2.1_____________

TITLE: ___Multicable Transit Refurbishment___

Is the request for quote to issue unit price to refurbish one each standard S8X2 frame?

Or is it stating to issue a unit price to refurbish 10 each standard S8X2 frames?

ANSWER:

Provide quote for each unit to refurbish one each standard S8X2 frame and provide overall quote for ten (10) standard S8X2.

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: __0791

PARAGRAPH / SECTION NO:

TITLE:

Item 0791 calls out a specific subcontractor to perform work. However, we have been told by this individual that they are not able to work right now due to health issues. Can MSC provide an alternative?

Please provide reference 2.1.2 under Item 0791.

The known source listed in the work item was the field service representative who has extensive experience working on the systems onboard the vessel. Submit a field service rep for review who has experience servicing hydraulic systems, electro mechanical and rigging equipment and who can perform the work to the specification.

Attached is reference 2.1.2

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: ______0801_______________

PARAGRAPH / SECTION NO:

TITLE:

Please provide reference 2.1.1 under Item 0801.

Please see associated Reference 2.1.1.

SPECIFICATION ITEM NO: 511

PARAGRAPH / SECTION NO: 3.2.1

TITLE: AFT 05 LEVEL DRAIN PIPE REPAIR STBD

QUESTION: Work Item 511 – “AFT 05 LEVEL DRAIN PIPE REPAIR STBD” – Paragraph 3.2.1 (6 EA.) 2” ASTM-1-105 3000# SW Steel 45 Deg Elbow

3.2.1 – Please advise if the 2” fittings listed in paragraph 3.2.1 should read 1-1/2” in lieu of 2” since all other pipe and fittings are listed as 1-1/2”.

Correct, fittings listed should read 1-1/2” in lieu of 2”.

SPECIFICATION ITEM NO: 591

PARAGRAPH / SECTION NO: 7.2.1.7.2, 7.2.3.2

TITLE: TAH CSI EMERGENCY DIESEL ENGINE

QUESTION: Work Item 591 – “TAH CSI EMERGENCY DIESEL ENGINE” – Paragraphs 7.2.1.7.2, 7.2.3.2

7.2.1.7.2 – “Drain the engine of all fluids and all disposed of in accordance with legal requirements.” Please provide quantity and type of all fluids required to be drained.

7.2.3.2 – “Ship’s Force together with the contractor shall fill and prime all liquids system to make the engines ready for starting and testing.” Please provide quantity and type of all fluids required to be filled.

7.2.1.7.2- Disposing of hazardous waste is covered under work item 0023_Hazardous Waste Disposal.

Approximately:

Lube Oil- 100 Gallons to be drain and disposed.

Glycol mixture- 10 gallons to be disposed Diesel fuel residual- 1 gallon to be disposed

7.2.3.2- All fluids will be provided by ship’s force Lube Oil- 100 Gallons Glycol- 10 Gallons

SPECIFICATION ITEM NO: 593

PARAGRAPH / SECTION NO: 7.3.5, 7.7.2

TITLE: TAH CSI SHIP’S SERVICE GENERATOR DIESEL ENGINE SERVICING

QUESTION: Work Item 593 – “TAH CSI SHIP’S SERVICE GENERATOR DIESEL ENGINE SERVICING” - Paragraphs 7.3.5, 7.7.2

7.3.5 – ““Contractor to perform a “compression test” of all cylinders to determine the condition of liner wear and ring seating, prior to opening engine. As soon as the engine is open, contractor to measure cylinder liners for ovality and inspect wear patterns.”

Caterpillar does not provide any specifications for compression test or liner ovality on D3500 engines. Please advise.

7.7.2 – “Carry out operational test of engine before performance of overhaul. Contractor to provide technical representative to ride vessel from home port to repair facility to test under load the SSDG and take all required pre-overhaul measurements. Testing may not be completed during maneuvering details and must be completed at sea. This is to include crankweb deflections (hot and cold), bearing clearances, firing pressures, pressures and temperatures, etc. “

Caterpillar does not provide any specifications or ability to check firing pressures or bearing clearances on D3500 engines. Please advise.

7.3.5 – Port Engineer acknowledge that OEM does not provide specifications for compression test or measuring each liner ovality. OEM is to provide a condition report for consideration of including liner removal and lower end overhauls.

7.7.2- Port Engineer acknowledge the receipt regarding paragraph 7.7.2. OEM is to carry out operational test of the engine before performance of overhaul. Provide recommended service report to determine baseline of the engine prior to overhaul.

SPECIFICATION ITEM NO: 802

PARAGRAPH / SECTION NO: 2/REFERENCES/ENCLOSURES

TITLE: ENGINE ROOM SUPPLY FAN OVERHAUL (VR 19-093) & (VR20-0014)

QUESTION: Work Item 802 – “ENGINE ROOM SUPPLY FAN OVERHAUL” – Paragraph 2.0

2.0 – Please provide vent duct arrangement for fans being replaced along with fan list reference.

2.1.2 – “NAVSEA Technical Manual T6230-AT-MMC-010, Technical Manual, Description, Operation and maintenance for Ventilation Fans” Reference 2.1.2 does not have any information on HOWDEN BUFFALO INC. Fan, Van Axial, SZ 400AF-D1810, 40,000 CFM Serial: BF-2503 & BF-2504 Model: 500892-303 FF-13893. Technical Manual only covers fans manufactured by Hartzell Fan Inc.

Please provide tech manual for the Buffalo Howden Fan.

2.0- Reference in 2.1.1. DWG 8387516 (plan view 44-A) shows the vent duct arrangement. Attached drawing (390-501-013_D) is the original arrangement, sheet 5 illustrates. Attached drawing (390-112-013_E) illustrates the fan foundation, and per the drawing each fan assembly with motor weight 1,318 lbs.

2.1.2- Attached is the fan characteristic with the following information. Contractor is to perform motor and fan repair per reference 2.1.3 (MSFC Standard Item 19 Motor and Ventilation Fan Repair). Local shop at Norfolk had previously accomplished similar work with no issues.

NSN: 01-302-2638 Volt: 440 AC Frequency: 60 HZ Phase: 3 Length: 45” Housing Diameter: 48”

SPECIFICATION ITEM NO: 803

PARAGRAPH / SECTION NO: 2.0/REFERENCES/ENCLOSURES

TITLE: STARBOARD STACK VENT FAN REPAIRS (VR 19-040)

QUESTION: Work Item 803 – “STARBOARD STACK VENT FAN REPAIRS” – Paragraph 2.0

2.0 – Please provide vent duct arrangement for Starboard Stack Vent Fan (01-94-1)

2.0 Attached is drawing 5980969_C illustrates vent duct arrangement, FAN #24. Fan assembly is shown in the provided tech-manual (T6230-AT-MMC-010) shown as ITEM #24.

SPECIFICATION ITEM NO: 353

PARAGRAPH / SECTION NO: 2.2.1 List of Panels and Switchboards for inspection.

TITLE: Thermographic Survey of the ship’s Main, Auxiliary, Emergency Switchboards, 24 VDC Switchboards, Motor Control Centers & UPS systems

Please provide List of Panels and Switchboards for inspection.

The list of panels is inserted as an enclosure to the base work item.

Starting on page 353-5, titled “Equipment List” through 353-21 With Enclosure 2.2.1 at the end of the list.

Then followed by enclosure 2.2.2 on page 353-22 And then enclosure 2.2.3 on page 353-23

SPECIFICATION ITEM NO: 782

PARAGRAPH / SECTION NO: 7.4.2, 7.4.2.1/INGERSOLL RAND

TITLE: TAH CSI O2N2 LPAC INSPECTION

QUESTION: Work Item 782 – “TAH CSI O2N2 LPAC INSPECTION” – Paragraphs 7.4.2, 7.4.2.1

7.4.2 – OEM Field Service Representative

7.4.2.1 – For the Low Pressure Air Compressors: Ingersoll Rand, 7950 Dagget St., San Diego, CA 92111, (858) 877-6444

Please provide another OEM Field Service Representative to service this equipment since Ingersoll Rand does not support Model J83246C as an OEM Field Service Representative.

7.4.2 Gas Equipment Engineering no longer exists. The compressor “OEM” rights now belong to Ingersol Rand Inc. Most technical information must come from the Ingersol Rand Factory out of Buffalo N.Y.

However, the Factory has a desire for their “distributers” to make initial repairs and adjustments first. If major parts require work, the parts are then shipped to the Factory for reconditioning.

7.4.2.1 The authorized rep for the WEST COAST is and has been in the past listed as Ingersol Rand of San Diego.

7.4.2.2 The authorized rep for the EAST COAST is:

Cumming-Wagner 10086 Lead Better Place Ashland VA 23005 POC: Butch Adams

(804) 550-3311

SPECIFICATION ITEM NO: 201

PARAGRAPH / SECTION NO: 2/REFERENCES/ENCLOSURES

TITLE: FORCE DRAFT BLOWER REPAIRS (VRs 19-032 & 033) Rev1

QUESTION: What is grease needed for this motor and fan? The Technical Manual mentions a Shell Alvaniqa Number 2. Is this the grease needed or is a Polyrex EM grease?

It is the intention of MSC to provide the grease as GFM, after our new FY grease contract is in place and identified.

If however, the existing required grease is removed from our list of products supplied, then a CCO will be issued to have the contractor procure the correct grease.

SPECIFICATION ITEM NO: 657

PARAGRAPH / SECTION NO: 7.3 through 7.4

TITLE: Inspect, service and test the ships accommodation ladders and gangways

In accordance with Paragraphs 7.3 through 7.4 can you provide a drawing that has the testing requirements for the accommodations ladder?

ANSWER:

7.3 The key to this section is “Examination”.

The listed sections a, through f, are all intended as visual inspection with a condition report to follow.

If structural, fitting, hardware, electrical issues are documented, then a change order will be issued to address the repairs required.

7.4 The intent of this inspection is listed as Annual, with mostly visual and / or cosmetic repairs only.

If major repairs, (such as structural), are required, then an actual 5 year weight test is required. The weight test, (usually 300 pounds every other ladder tread), is subject to yearly changes as deemed by current USCG and ABS regulations. The weight test procedure, if required would have to approved by both USCG and ABS, prior to conducting and demonstrating.

NAME OF CONTRACTOR: ______________________________

SPECIFICATION ITEM NO.: _________0782_________

PARAGRAPH / SECTION NO:____3.2.1 & 7.4.2.1_______

TITLE: TAH_CSI_O2N2 LPAC INSPECTION

7.4.2.1 – After contacting the specified OEM services Rep “Ingersol Rand 7950 Dagget St San Diego, CA 92111 (858) 877-6444”, have stated that they are not capable of servicing this unit and are not the OEM of this unit. Is there another MSC OEM rep approved to service this equipment we can contact?

3.2.1 – The Manufacturer seems to no longer be in business for consulting.

7.4.2 Gas Equipment Engineering no longer exists. The compressor “OEM” rights now belong to Ingersol Rand Inc. Most technical information must come from the Ingersol Rand Factory out of Buffalo N.Y. However, the Factory has a desire for their “distributers” to make initial repairs and adjustments first. If major parts require work, the parts are then shipped to the Factory for reconditioning.

7.4.2.1 The authorized rep for the WEST COAST is and has been in the past listed as Ingersol Rand of San Diego.

7.4.2.2 The authorized rep for the EAST COAST is:

Cumming-Wagner 10086 Lead Better Place Ashland VA 23005 POC: Butch Adams

(804) 550-3311

SPECIFICATION ITEM NO: 552

PARAGRAPH / SECTION NO: 2.2.1/T-AH ENGINE HOSE REPLACEMENT LISTING

TITLE: TAH CCSI HOSE REPLACEMENT (1 x 5 YEARS)

QUESTION: Work Item 552 – “T-AH CCSI HOSE REPLACEMENT” – 2.2.1 (T-AH ENGINE HOSE REPLACEMENT LISTING”

References provided do not give enough information to price hose assemblies listed in enclosure 2.2.1. Please provide hose assembly reference which shows information on hose material requirements, pressure ratings, flange/connector type, hose sizes and associated lengths.

Please provide T-AH hose report from the last 5 year replacement on these hose assemblies since the MAN Diesel tech manual provided only reflects hoses for engine to engine connections and doesn’t show engine to fuel and lube oil connections to ship systems.

It should also be noted that there is no information which labels hose locations since the tech manual only reflects assembly numbers and does not provide locations of hoses. The Caterpillar tech manual does not provide any information at all concerning hose assemblies.

ANSWER:

As stated in the question, exact hose sizes and lengths are not readily available without a ship check. Due to COVID-19, the Port Engineer is also restricted from conducting a ship check to take measurements. Most hose assemblies are designed to re-use the hose coupling. The hose material and pressure is defined under the USCG and ABS rules for fuel and oil systems.

Suggest contractor submit a price quote per listed hose, (such as $500.00 each), with the Bid exception listed as such, along with the expectation of providing a condition report of “final cost of each hose”, to where MSC can provide a change order to make up any discrepancy in cost.

The 5 year requirement was not executed properly in the past and thus this work item is being executed as written for the first time. No “last 5 year report exists”.

The hose tag information will have be taken directly off of the existing hoses.

It is expected that Enclosure 2.2.2 will be filled out entirely by the contractor, so that after this MTA, MSC will have all required information for the next 5 year cycle.

SPECIFICATION ITEM NO: 201

PARAGRAPH / SECTION NO: 7.3.1, 7.3.3

TITLE: FORCE DRAFT BLOWER REPAIRS (VRs 19-032 & 033) Rev1

QUESTION: Will all the Fans be shipped with the pedestals for the overhauls? Please confirm.

As written, it is assumed that the portion referred to as the “Pedestal” is welded to the Base and thus not easily removed.

If the pedestal actually is removable and “capable of being rigged” from the space, then yes the contractor would be allowed to remove the pedestal for better ship assembly.

SPECIFICATION ITEM NO: SOLICITATION

PARAGRAPH / SECTION NO: Section L, Paragraph 5.a

TITLE: INSTRUCTIONS TO OFFERORS

Section L, paragraph 5.a states, “PLEASE NOTE: THERE IS A MANDATORY 14-DAY RESTRICTION OF MOVEMENT(ROM) REQUIRED TO ACCESS ALL MILITARY SEALIFT COMMAND VESSELS”. There is no General Item 0028_A_REDUCTION OF MOVEMENT (ROM) REQUIREMENTS invoked in this solicitation. This requirement will affect the pricing of subcontractors, Original Equipment Manufacturers, and Technical Representatives but is not referenced in the solicitation in any place other than the Inspection of Vessel / Pre-Proposal Conference paragraph. Will this be a requirement during the period of performance of the Mid Term Availability or was it only a requirement for the inspection and conference?

The newest COVID 19 RESPONSE PLAN states that ROMs are not required for MTAs. However, the Contractor still needs to do the COVID Questionnaire and if any answers require a “YES”, the contractor may be required to ROM if the MASTER, who will use a Risk tool, determines there is a high risk to spread.

ATTACHMENT J - 8

image1.emf

390-112-013_E image2.emf

390-501-013_D

390-501-001A.pdf

390-501-001B.pdf

390-501-001C.pdf

390-501-001D.pdf

390-501-001E.pdf

390-501-001F.pdf

390-501-001G.pdf

390-501-001H.pdf

390-501-001I.pdf

390-501-001J.pdf image3.emf

Fan Characteristic

7/1/2020 Print FLIS: Characteristics - Available Information for NIIN=013022638 Tab www.logiquest.com/s2w/024/frm_print_display.html 1/1

NIIN:

01-302-2638 Item Name:

FAN,VANEAXIAL

FSC:

Characteristics 1 of 23

MRC | Requirement Statement | Reply Statement |

>ABBB | SPEED ADJUSTMENTS | TWO SPEED |

ABRY | LENGTH | 45.000 INCHES NOMINAL |

ADNK | FLOW DIRECTION | INWARD |

AEHY | AMBIENT TEMP AT FULL RATED POWER | 50.0 DEG CELSIUS |

AEQC | OPERATING SPEED AT RATED CAPACITY IN RPM | 600.0 AND 1200.0 |

AGBD | ELECTRICAL CONNECTION TYPE | TERMINAL BOX |

AJLY | STATIC PRESSURE AT SPECIFIED AIR FLOW RATE | 0.0 INCHES OF WATER |

AKCV | DRIVE TYPE | DIRECT |

AKDJ | PRIME MOVER TYPE | ELECTRIC MOTOR |

AKNA | INCLOSURE TYPE | FULLY INCLOSED |

AXHR | MOUNTING FACILITY TYPE AND QUANTITY | 2 FLANGE |

AYSY | ROTATION DIRECTION FOR WHICH DESIGNED | COUNTERCLOCKWISE |

CQKX | AIR FLOW RATE | 5100.0 CUBIC FEET PER MINUTE NOMINAL |

CSBH | VOLTAGE IN VOLTS AND CURRENT TYPE | 440.0 AC |

CSYL | PRIME MOVER POWER RATING | 2.500 HORSEPOWER |

CWLX | HOUSING INSIDE DIAMETER | 48.040 INCHES MINIMUM AND 48.050 INCHES MAXIMUM |

CWLY | PRIME MOVER DRIVE SHAFT BEARING TYPE | BALL |

FAAZ | PHASE | THREE |

FREQ | FREQUENCY IN HERTZ | 60.0 |

MATT | MATERIAL | ALUMINUM ALLOY BLADE |

MATT | MATERIAL | STEEL HOUSING |

SFTT | SURFACE TREATMENT | CHROMATE ZINC OVERALL AND ENAMEL SEMIGLOSS |

STYL | STYLE DESIGNATOR | 31 FIXED |

No Records ENAC | Crnt/Hist | Requirement Definition

THE DIFFERENT SPEEDS AT WHICH THE ITEM MAY BE OPERATED.

Reply Statement

TWO SPEED

image4.emf

5980969_C

5980969_C