This document contains a contractor's price breakdown for category B items for work on the USNS Medgar Evers (T-AKE 13). The price breakdown lists various category B items needed for the ship including physical security, vessel cleaning, continuation of services, and repairs and refurbishment of exterior ladders, sewage systems, rudders, drydocking, unrep control booths, and unrep blocks. For each item, the breakdown specifies labor hours and materials required from both the prime contractor and any subcontractors, as well as total labor costs, material costs, and overall item prices. The total proposed price for all category B items is blank, awaiting specification of costs for individual items. This price breakdown is attached to solicitation number N3220520R4091 for repair, overhaul, and maintenance work on the USNS Lewis & Clark (T-AKE 1) being conducted by the Department of the Navy's Military Sealift Command.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||||||
| CATEGORY "B" | ||||||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA | |||||||||||||||
| 7.1 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE or DELTA | 1 | DAY | |||||||||||||
| 7.2 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | |||||||||||||
| WI 025 SUBTOTAL | $0.00 | $0 | ||||||||||||||
| 026 | VESSEL FINAL CLEANING REV A | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | |||||||||||||||
| 7.1 | Overhaul Management Team | 15 | Days | $0.00 | - 0 | $0.00 | $0.00 | |||||||||
| 7.2 | General Services For The Ship | 15 | Days | $0.00 | - 0 | $0.00 | $0.00 | |||||||||
| 7.3 | Telephone Services | 15 | Days | $0.00 | - 0 | $0.00 | $0.00 | |||||||||
| 7.4 | Project Planning and Monitoring | 15 | Days | $0.00 | - 0 | $0.00 | $0.00 | |||||||||
| 7.5 | Fire Protection and Ship's Safety | 15 | Days | $0.00 | - 0 | $0.00 | $0.00 | |||||||||
| 7.6 | Delivery, Care and Redelivery of the Vessel | 15 | Days | $0.00 | - 0 | $0.00 | $0.00 | |||||||||
| 7.7 | Shipboard Access and Security | 15 | Days | $0.00 | - 0 | $0.00 | $0.00 | |||||||||
| 7.8 | Gas Free Certificates | 15 | Days | $0.00 | - 0 | $0.00 | $0.00 | |||||||||
| 118 | 01 LEVEL, 02 LEVEL FORWARD DECK HOUSES AND BREAK-WATER PRESERVATION | |||||||||||||||
| 120 | EXTERIOR LADDERS AND HANDRAILS REPAIRS | |||||||||||||||
| 516 | SEWAGE SYSTEM PIPING REPLACEMENT | |||||||||||||||
| 902 | DRYDOCKING AND UNDOCKING VESSEL | |||||||||||||||
| 921 | REPLACE RUDDER STOCK AND RUDDER STOCK BEARING | |||||||||||||||
| 951 | DRYDOCKING AND UNDOCKING VESSEL | |||||||||||||||
| 965 | STEEL RENEWAL | |||||||||||||||
| 1004 | UNREP CONTROL BOOTH PRESERVATION | |||||||||||||||
| 1007 | REFURBISHMENT AND PRESERVATION OF UNREP BLOCKS | |||||||||||||||
| 1008 | GYPSY WINCH PEDESTAL REPAIR AND PRESERVATION | |||||||||||||||
| Total CATEGORY "B" ITEMS | $0.00 |
&L&14USNS MEDGAR EVERS (T-AKE 13)&C&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS&R&14N32205-19-R-6010
&CATTACHMENT J-3
File details come from the government source that posted it. Updated .