0503_A_Cargo Pumproom Drain Piping Repairs(1).docx

DOCX document 3 MB Posted

Attached to
USNS LEWIS & CLARK ROH Federal contract opportunity
Solicitation number
N3220520R4091
Issued by
Department of the Navy Military Sealift Command

About this file

This document outlines specifications for replacing drain piping sections in the cargo pump room of the USNS LEWIS AND CLARK (T-AKE 1) Class ship. The contractor will remove approximately 160 linear feet of existing carbon steel piping and replace it with 90/10 copper nickel piping, including fittings such as tees, elbows, and flanges. The contractor must provide certification for all welders and ensure work areas are cleaned and gas free. Testing of the new piping system includes functional, operational, and hydrostatic tests at 25 psi pressure. The contractor is responsible for painting, insulation, and cleaning of all affected areas once the work is complete.

The related federal contract opportunity is solicitation number N3220520R4091 for repairs to the USNS LEWIS & CLARK issued by the Department of the Navy's Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to USNS LEWIS & CLARK ROH, newest first.
File Type Posted
LNC Solicitation Amend Discussions.docx DOCX document
COPY LNC SOLICITATION FINAL.docx DOCX document
USNS LEWIS CLARK AMEND 14.docx DOCX document
0503_A_Cargo Pumproom Drain Piping Repairs(2).docx DOCX document
USNS LEWIS CLARK AMEND 0013.docx DOCX document
0104_A_QAWT Scuttle Repairs(1).docx DOCX document
0502_A_HPAC ROUTINE B MAINTENANCE.docx DOCX document
LNC ROH-DD MARCH 2021 COVER LETTER AND INDEX (3).doc DOC document
USNS LEWIS CLARK Amend 0012.docx DOCX document
USNS LEWIS CLARK AMEND 0011.docx DOCX document
Updated Work Item INDEX (2).doc DOC document
USNS LEWIS CLARK Amend 10.docx DOCX document
USNS LEWIS AND CLARK Amend 6.docx DOCX document
Clarification Question 9920.docx DOCX document
USNS LEWIS AND CLARK Amend 7.docx DOCX document
USNS LEWIS CLARK Amend 0009 F.docx DOCX document
Clarification Question 9420.docx DOCX document
0956_A_TAKE CCSI OVERHAULING SEA VALVES (5YR) (2).docx DOCX document
J2 Category A Items LNC (1).xls XLS spreadsheet
J 3 Category B Items LNC.xls XLS spreadsheet
USNS LEWIS CLARK Amend 0007.docx DOCX document
Updated Work Items.zip ZIP file
Clarification files Group 6.zip ZIP file
Clarification Questions Group 4.docx DOCX document
Clarification Question Group 3 Amend 0005.docx DOCX document
LNC Clarification Group 2 Amend 0004.docx DOCX document
LNC LIQUIDATED DAMAGES AMEND 0003.docx DOCX document
8194716_-.PDF PDF
Amendment 2 Clarification Group 1.docx DOCX document
8498620 TI-79 Gray Water Piping System Modifications.pdf PDF
7488761_C CMWD.pdf PDF
8194692_-.PDF PDF
0554_A_CARGO BRINE VALVES AND PIPING REPLACEMENT(1).docx DOCX document
8194698_-.pdf PDF
J - 3 Category B Items LNC.xls XLS spreadsheet
8499057_-.pdf PDF
Clarification Questions.docx DOCX document
J - 2 Category A Items LNC (1).xls XLS spreadsheet
USNS LEWIS CLARK AMEND 0001.docx DOCX document
LEWIS CLARK SOLICITATION ROH.pdf PDF
L-4 LNC ROH21 J-A.pdf PDF
J-ATTACHMENTS LNC.zip ZIP file
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS LEWIS AND CLARK

(T-AKE 1)

MACHINERY, AUXILIARY SYSTEMS SOL.NO: N32205-20-F-XXXX

1/15/2020 ITEM NO. 503 Category “A” MSC/N756/LSC

ENCLOSURE 1 CARGO PUMP ROOM PHOTOS AND SKETCH

1.0 ABSTRACT

This item describes replacing drain piping sections from carbon steel piping with 90/10 copper nickel piping on the bilges in Cargo Aux Pump Room.

2.0 REFERENCES/ENCLOSURES

2.1 DWG No. 529-8194698, Cargo Hold and Misc Bilge Oily Waste and Transfer System

2.2 Enclosure1 Cargo Pump Room Drain Photos and Sketch

3.0 ITEM LOCATION/DESCRIPTION

3.1 Location: Cargo & Aux Pump Room (5-34-0)

3.2 Bill of Material (Contractor Furnished):

3.2.1 The contractor shall provide the exact quantities and (reasonable) additional material such as fittings, welding material, hangers, sealant, fasteners, etc., in order to install a fully functional system that meets the requirements of this specification.

Contractor Furnished Materials

1" 90/10 Copper Nickel Pipe
160 LF
1” 90/10 tee fitting
14 Each
1” 90/10 90 degree elbow fitting
24 EACH
1” 90/10 Cuni Flanges
6 EACH

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES

5.1 The Contractor and all Subcontractors, regardless of tier, must consult Military Sealift Command’s General Technical Requirements (GTRs) to determine applicability to this work item. The Contractor and all Subcontractors, regardless of tier, must comply with all applicable GTR requirements.

5.2 The Contractor and all Subcontractors shall review other work items under this contract to determine their effect on the work required by this item. Based on this review the Contractor shall plan and schedule work to minimize conflicts between work items.

5.3 THE USNS LEWIS AND CLARK ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM.

5.4 The Contractor shall perform a ship check to retrieve accurate measurements and information before conducting work. Shipyard shall not assume valve numbers are correct as it can vary from ship to ship.

6.0 QUALITY ASSURANCE REQUIREMENTS

6.1 All welding requirements shall be accomplished by certified welders. All welders shall be certified to perform the type of welding required and documentation of such shall be current.

6.2 Clean and Gas Free affected enclosed space per local procedures as approved by the ship and/or MSCREP.

7.0 STATEMENT OF WORK REQUIRED

7.1 Contractor shall provide services of a licensed marine chemist to certify and maintain all areas of this work item requiring hot work. Contractor shall provide fire watch during all portions requiring hot work. Fire watch will have a means of extinguishing fire independent of ships portable or fixed system.

7.2 Contractor shall accomplish ship check with C/E, PPE & Cargo Engineer prior to starting any work. SF will tag out system.

7.3 Contractor shall drain and dispose fluids from affected system IAW local regulations.

Note: DO NOT DRAIN FLUIDS INTO BILGES.

7.4 COLD cut existing piping section identified by MSC Rep and Ships force.

7.5 Assume 160 linear feet of piping will be replaced. Use removed piping as a template to replace removed carbon steel piping and fittings with contractor provided material in section 3.2.1.

7.6 Piping system shall be supported with pipe hangers/supports as existing. New gaskets shall be provided with all new joint make-ups.

7.7 Provide new fasteners and gaskets for new flanges. Anti-seize compound shall be applied to prevent future seizure of nuts/bolts.

7.7.1 Welding and brazing of the joints for piping systems shall conform to ASTM F722, ABS Rules 4-6-2, 2-4-4/5.7, and USCG 46 CFR Part 56.

7.8 Testing/Inspection

7.8.1 Contractor shall perform functional, operational, and hydrostatic tightness tests with MSC Rep. Hydrostatic test shall be conducted at 25 psi. Contractor shall correct any leak or discrepancy found during testing

7.9 Painting/Insulation

7.9.1 Clean, prepare and prime all new and disturbed piping sections with contractor provided paint. Apply a primer and two topcoats to all areas to match the surrounding areas.

7.9.2 Renew all removed and disturbed insulation.

7.10 Clean all affected areas by the performance of this work item. Submit completion report to the MSC Rep and Chief Engr.

8.0 GENERAL REQUIREMENTS: None Additional

USNS LEWIS AND CLARK

(T-AKE 1)

MACHINERY, AUXILIARY SYSTEMS SOL.NO: N32205-20-F-XXXX

1/15/2020 ITEM NO. 503 Category “A” MSC/N756/LSC

CARGO PUMP ROOM DRAIN PIPING REPAIRS

503-1

MSC USE ONLY: VR19-0059

image1.png image2.png image3.png image4.png image5.png image6.png

File details come from the government source that posted it. Updated .