0554_A_CARGO BRINE VALVES AND PIPING REPLACEMENT(1).docx

DOCX document 2 MB Posted

Attached to
USNS LEWIS & CLARK ROH Federal contract opportunity
Solicitation number
N3220520R4091
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a work item description for replacement of cargo refrigeration and brine system valves and piping aboard the USNS LEWIS AND CLARK (T-AKE 1) ship. The contractor will be responsible for tagging out and draining required systems, removing and replacing identified valves, overhauling valves, replacing piping, testing the system, and painting and insulating surfaces. The contractor must furnish materials including forged steel flanges, carbon steel piping, ball valves, control tubing and fittings. The government will furnish additional valves and kits. The work will be coordinated with an accompanying brine system flush work item. Upon completion, the contractor must demonstrate the system is leak free.

The related solicitation is for repairs and overhauls to the USNS LEWIS AND CLARK ship, issued by the Department of the Navy's Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to USNS LEWIS & CLARK ROH, newest first.
File Type Posted
LNC Solicitation Amend Discussions.docx DOCX document
COPY LNC SOLICITATION FINAL.docx DOCX document
USNS LEWIS CLARK AMEND 14.docx DOCX document
LNC ROH-DD MARCH 2021 COVER LETTER AND INDEX (3).doc DOC document
0503_A_Cargo Pumproom Drain Piping Repairs(2).docx DOCX document
USNS LEWIS CLARK AMEND 0013.docx DOCX document
0104_A_QAWT Scuttle Repairs(1).docx DOCX document
0502_A_HPAC ROUTINE B MAINTENANCE.docx DOCX document
USNS LEWIS CLARK Amend 0012.docx DOCX document
USNS LEWIS CLARK AMEND 0011.docx DOCX document
Updated Work Item INDEX (2).doc DOC document
USNS LEWIS CLARK Amend 10.docx DOCX document
Clarification Question 9920.docx DOCX document
USNS LEWIS AND CLARK Amend 6.docx DOCX document
USNS LEWIS AND CLARK Amend 7.docx DOCX document
Clarification Question 9420.docx DOCX document
USNS LEWIS CLARK Amend 0009 F.docx DOCX document
0956_A_TAKE CCSI OVERHAULING SEA VALVES (5YR) (2).docx DOCX document
Clarification files Group 6.zip ZIP file
J2 Category A Items LNC (1).xls XLS spreadsheet
J 3 Category B Items LNC.xls XLS spreadsheet
USNS LEWIS CLARK Amend 0007.docx DOCX document
Updated Work Items.zip ZIP file
Clarification Questions Group 4.docx DOCX document
Clarification Question Group 3 Amend 0005.docx DOCX document
LNC Clarification Group 2 Amend 0004.docx DOCX document
LNC LIQUIDATED DAMAGES AMEND 0003.docx DOCX document
J - 2 Category A Items LNC (1).xls XLS spreadsheet
0503_A_Cargo Pumproom Drain Piping Repairs(1).docx DOCX document
7488761_C CMWD.pdf PDF
8194716_-.PDF PDF
Amendment 2 Clarification Group 1.docx DOCX document
8498620 TI-79 Gray Water Piping System Modifications.pdf PDF
8194692_-.PDF PDF
8194698_-.pdf PDF
J - 3 Category B Items LNC.xls XLS spreadsheet
8499057_-.pdf PDF
Clarification Questions.docx DOCX document
USNS LEWIS CLARK AMEND 0001.docx DOCX document
J-ATTACHMENTS LNC.zip ZIP file
LEWIS CLARK SOLICITATION ROH.pdf PDF
L-4 LNC ROH21 J-A.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS LEWIS AND CLARK

(T-AKE 1)

AUXILIARY SYSTEMS
SOL.NO. N32205-20-R-4091

5/11/20

ITEM NO. 556 Category ‘A’ MSC/N756/LSC

ENCLOSURE 2: PHOTOS FOR GUIDANCE

1.0 ABSTRACT:

1.1 This work item describes the requirements for the replacement of Cargo Refrigeration and Brine system valves and piping.

2.0 REFERENCES/ENCLOSURE:

2.1 Referencse:

2.1.1 NAVSEA DWG 516-8194692, Cargo Refrigeration Secondary Coolant Circulation System Diagram.

2.1.2 NAVSEA DWG 516-7488756

2.2 Enclosure 1: Valve location, Description and Valve ID.

Enclosure 2: Photos for Guidance

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Locations: See enclosures below

3.2 Item Description/Manufacturer’s Data.

3.2.1 Bill of Materials: (Contractor Furnished):

Description
QTY
Flange Socket Weld (1 ½”) Forged Steel/ASTM A-350 GR LF1 AND LF2
15 Each
1 ½” Pipe/Carbon Steel/ASTM A333 GR1 AND 6/SCHEDULE 40
10 FT
Flange Socket Weld (2 inch) Forged Steel/ASTM A-350 GR LF1 AND LF2
36 Each
2” Pipe/Carbon Steel/ASTM A333 GR1 AND 6/SCHEDULE 40
20 FT
Flange Socket Weld (1 inch)/Forged Steel/ASTM A-350 GR LF1 AND LF2
48 Each
Ball Valve (1 inch) Female Thread
24 Each
1” Pipe/Carbon Steel/ASTM A333 GR1 AND 6/SHEDULE 40
60 FT
Control Air Tubing and fittings Copper, .40” OD
60 FT
ASTM F593 (Stainless Steel Stud) 6” X 5/8”
152 Each
ASTM F594 (Stainless Steel Nut) 5/8”
500 Each
ASTM F593 (Stainless Steel Bolt) 5” X 5/8”
100 Each
ASTM F593 (Stainless Steel Bolt) 4 ½” X 5/8”
100 Each
ASTM F593 (Stainless Steel Bolt) 2 ¼” X ½”
192 Each
ASTM F594 (Stainless Steel Nut) ½”
192 Each
Gaskets - GARLOCK 3000 or specified in Ref 2.1.
As Required
Insulation/Lagging Paste
As Required

3.2.2 Quantities are considered estimates. The Contractor shall provide the exact quantities and additional material such as miscellaneous fittings, cable hangers, cable tags, etc, which are not included in the List of Materials, in order to install a fully functional system that meets the requirements of this specification.

4.0 GOVERNMENT-FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government Furnished Material (GFM):

Description
Part Number
QUANTITY
ACRIS VALVE DN100 4”
ACRIS IW-31KF/S9
20 Each
ACRIS VALVE DN65 2 ½”
ACRIS IW-31KF/S9
24 Each
ACRIS VALVE DN50 2”
ACRIS IL-31KF/S9
12 Each
ACRIS VALVE DN50 2”
ACRIS IW-31KF/S9
25 Each
ACRIS VALVE DN40 1 ½”
ACRIS IW-31KF/S9
9 Each
3-Way Valve, Flange DIN2633/DN40
81430018-74 York Refrigeration
2 Each
3-Way Valve, Flange DIN2633/DN50
81430018-73 York Refrigeration
2 Each
3-Way Mixing Valve Overhaul Kit
040R401001
15 Each
Fail Open/Close Mounting Kit for 4” ACRIS VALVE
1CA-SR105
4 Each
Fail Open/Close Mounting Kit for 2.5” ACRIS VALVE
CA-SR83
4 Each

5.0 NOTES:

5.1 The Contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this Work Item. In performance of this Work Item, the Contractor and all subcontractors regardless of tier shall comply with the requirements of all applicable GTR’s.

5.2 The Contractor and all subcontractors, regardless of tier, are advised to review other Work Items under this contract, to determine their effect on the work required under this work item.

5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. TASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECRTICAL CABLES TO ENSURE THEY ARE DE-ENGERIZED PRIOR TO WORKING ON THE ITEM.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Tag-Out all required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state, and local regulations.

7.2 This work will be coordinated in conjunction with the Brine System Flush.

7.3 After Brine system flush per WI 0552, Contractor shall start removing valves from each location listed in 3.1 and as marked by the Ships Force (see enclosure 1)

7.4 Prior to installing any valve, hydrostatically test to recommended pressure identified in reference 2.1.

7.5 Prior to removal, mark all valve operators with identification, position, and flow direction to ensure proper alignment upon reinstallation.

7.5.1 Remove pneumatic operators by first disconnecting air lines. Do not bend/stress air lines any more than needed to remove operator. Secure operators away from the valve location.

7.5.2 Remove electrical motor operators from the existing valves and secure in an out of the way location. Do not electrically disconnect the motor operators. Do not allow the motor operators to hang from their electrical cables. Protect motor operators from damage.

7.6 Replace valves identified in enclosure 1.

7.7 Overhaul valves identified in enclosure 1.

7.8 Replace piping as shown in enclosure 2.

7.9 Reinstall valve operators using marks made in paragraph 7.5 to ensure proper positioning/alignment.

7.10 Inspection/Testing:

7.10.1 After valve and piping replacement, perform an operational test of pneumatic/MOV valves in the brine system to ensure the operator is installed properly and the valve seats correctly.

7.10.2 Demonstrate that the valves are leak free in the presence of the MSCREP and ABS Surveyor.

7.10.3 Upon completion of successful leak test, contractor shall lag all effected piping and valves.

7.10.4 Stencil and or Mark all piping as found identifying the valves and their flow directions.

7.10.5 New Placards shall be provided if any lost through removal and installation of new valves.

7.11 Painting, Insulation:

7.11.1 Painting: Paint all new and disturbed surfaces to match surrounding surfaces.

7.11.2 Insulation: All Lagging shall be cut in such a way that installation of new lagging is matched and seamless. Replace or renew any disturbed insulation to like new condition.

8.0 GENERAL REQUIREMENTS: None Additional.

USNS LEWIS AND CLARK

(T-AKE 1)

AUXILIARY SYSTEMS
SOL.NO. N32205-20-R-4091

5/11/20

ITEM NO. 556 Category ‘A’ MSC/N756/LSC

CARGO BRINE VALVE AND PIPING REPLACEMENT

556 - 1

MSC USE ONLY: VR20-036

Size
Location
Description
Valve ID
1.5” IPS DN40
4-58-01
AC 4-62-01 Vestibule 3-way pneumatic (Overhaul)
RA-V-074
2” IPS DN50
4-58-01
AC 4-65-1 3-way pneumatic (Overhaul)
RA-V-081
2” IPS DN50
4-58-01
AC 4-65-3 3-way pneumatic (Overhaul)
RA-V-082
2” IPS DN50
4-58-01
AC 4-65-2 3-way pneumatic (Overhaul
RA-V-090
2” IPS DN50
4-58-01
AC 4-65-4 3-way pneumatic (Overhaul)
RA-V-091
1.5” IPS DN40
3-58-01
AC 3-62-01 Vestibule 3-way pneumatic (Overhaul)
RA-V-103
2” IPS DN50
3-58-01
AC 3-65-1 3-way pneumatic (Overhaul)
RA-V-110
2” IPS DN50
3-58-01
AC 3-65-3 3-way pneumatic (Overhaul)
RA-V-113
2” IPS DN50
3-58-01
AC 3-65-2 3-way pneumatic (Overhaul)
RA-V-119
2” IPS DN50
3-58-01
AC 3-65-4 3-way pneumatic (Overhaul)
RA-V-122
1.5” IPS DN40
2-58-01
AC 2-62-01 Vestibule 3-way pneumatic (Overhaul)
RA-V-134
2” IPS DN50
2-58-01
AC 2-65-1 3-way pneumatic (Overhaul)
RA-V-140
2” IPS DN50
2-58-01
AC 2-65-3 3-way pneumatic (Overhaul)
RA-V-143
2” IPS DN50
2-58-01
AC 2-65-2 3-way pneumatic (Overhaul)
RA-V-149
2” IPS DN50
2-58-01
AC 2-65-4 3-way pneumatic (Overhaul)
RA-V-152
1” IPS DN25
4-58-01
Defrost supply to drip pan, AC 4-65-2
RA-V-097
1” IPS DN25
4-58-01
Defrost supply to drip pan, AC 4-65-4
RA-V-098
1” IPS DN25
4-58-01
Defrost supply to drip pan, AC 4-65-1
RA-V-099
1” IPS DN25
4-58-01
Defrost supply to drip pan, AC 4-65-3
RA-V-100
1” IPS DN25
3-58-01
Defrost supply to drip pan, AC 3-65-2
RA-V-127
1” IPS DN25
3-58-01
Defrost supply to drip pan, AC 3-65-4
RA-V-128
1” IPS DN25
3-58-01
Defrost supply to drip pan, AC 3-65-1
RA-V-129
1” IPS DN25
3-58-01
Defrost supply to drip pan, AC 3-65-3
RA-V-130
1” IPS DN25
2-58-01
Defrost supply to drip pan, AC 2-65-2
RA-V-157
1” IPS DN25
2-58-01
Defrost supply to drip pan, AC 2-65-4
RA-V-158
1” IPS DN25
2-58-01
Defrost supply to drip pan, AC 2-65-1
RA-V-159
1” IPS DN25
2-58-01
Defrost supply to drip pan, AC 2-65-3
RA-V-160
4” IPS DN100
2-58-01
Chill Main-Constant Pressure Overflow
RA-V-210
4” IPS DN100
2-58-01
Freeze Main-Constant Pressure Overflow
RA-V-211
1.5" (DN 40)W
2-58-01
AC 2-62-01 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-132
1.5" (DN 40)W
2-58-01
AC 2-62-01 CARGO HLD AIR COOLER RETURN VALVE
RA-V-133
2.5" (DN 65)
2-58-01
BRINE CHILL SUPPLY VLV AC 2-62-01 VEST (FO)
RA-V-135
2.5" (DN 65)
2-58-01
BRINE DEFROST SUPPLY VLV AC 2-62-01 VEST (FC)
RA-V-136
2.5" (DN 65)
2-58-01
BRINE CHILL RETURN VLV AC 2-62-01 VEST (FO)
RA-V-137
2.5" (DN 65)
2-58-01
BRINE DEFROST RETURN VLV AC 2-62-01 VEST (FC)
RA-V-138
2" (DN 50)L
2-58-02
AC 2-65-1 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-139
2" (DN 50)L
2-58-02
AC 2-65-1 CARGO HLD AIR COOLER RETURN VALVE
RA-V-141
2" (DN 50)W
2-58-02
AC 2-65-3 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-142
2" (DN 50)W
2-58-02
AC 2-65-3 CARGO HLD AIR COOLER RETURN VALVE
RA-V-144
2" (DN 50)W
2-58-02
AC 2-65-2 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-148
2" (DN 50)W
2-58-02
AC 2-65-2 CARGO HLD AIR COOLER RETURN VALVE
RA-V-150
2" (DN 50)L
2-58-02
AC 2-65-4 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-151/112
2" (DN 50)L
2-58-02
AC 2-65-4 CARGO HLD AIR COOLER RETURN
RA-V-153
4" (DN 100)
2-58-02
BRINE FREEZE RETURN VLV 2ND DK STBD (FO)
RA-V-145
4" (DN 100)W
2-58-02
BRINE CHILL RETURN VLV 2ND DK STBD (FC)
RA-V-146
4" (DN 100)
2-58-02
BRINE DEFROST RETURN VLV 2ND DK STBD (FC)
RA-V-147
4" (DN 100)
2-58-02
BRINE FREEZE SUPPLY VLV 2ND DK PORT (FO)
RA-V-154
4" (DN 100)W
2-58-02
BRINE CHILL SUPPLY VLV 2ND DK PORT (FC)
RA-V-155
4" (DN 100)
2-58-02
BRINE DEFROST SUPPLY VLV 2ND DK PORT (FC)
RA-V-156
1.5" (DN 40)W
3-58-01
AC 3-62-01 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-102
1.5" (DN 40)W
3-58-01
AC 3-62-01 CARGO HLD AIR COOLER RETURN VALVE
RA-V-104
2.5" (DN 65)
3-58-01
BRINE DEFROST RETURN VLV AC 3-62-01 VEST (FC)
RA-V-105
2.5" (DN 65)
3-58-01
BRINE CHILL RETURN VLV AC 3-62-01 VEST (FO)
RA-V-106
2.5" (DN 65)
3-58-01
BRINE DEFROST SUPPLY VLV AC 3-62-01 VEST (FC)
RA-V-107
2.5" (DN 65)
3-58-01
BRINE CHILL SUPPLY VLV AC 3-62-01 VEST (FO)
RA-V-108
2" (DN 50)L
3-58-02
AC 3-65-1 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-109
2" (DN 50)L
3-58-02
AC 3-65-1 CARGO HLD AIR COOLER RETURN VALVE
RA-V-111
2" (DN 50)W
3-58-02
AC 3-65-3 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-112
2" (DN 50)W
3-58-02
AC 3-65-3 CARGO HLD AIR COOLER RETURN VALVE
RA-V-114
2" (DN 50)W
3-58-02
AC 3-65-2 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-118
2" (DN 50)W
3-58-02
AC 3-65-2 CARGO HLD AIR COOLER RETURN VALVE
RA-V-120
2" (DN 50)L
3-58-02
AC 3-65-4 CARGO HLD AIR COOLER 3SUPPLY VALVE
RA-V-121
2" (DN 50)L
3-58-02
AC 3-65-4 CARGO HLD AIR COOLER RETURN VALVE
RA-V-123
4" (DN 100)
3-58-02
BRINE FREEZE RETURN VLV 3RD DK STBD (FO)
RA-V-115
4" (DN 100)
3-58-02
BRINE CHILL RETURN VLV 3RD DK STBD (FC)
RA-V-116
4" (DN 100)
3-58-02
BRINE DEFROST RETURN VLV 3RD DK STBD (FC)
RA-V-117
4" (DN 100)
3-58-02
BRINE FREEZE SUPPLY VLV 3RD DK PORT (FO)
RA-V-124
4" (DN 100)
3-58-02
BRINE CHILL SUPPLY VLV 3RD DK PORT (FC)
RA-V-125
4" (DN 100)
3-58-02
BRINE DEFROST SUPPLY VLV 3RD DK PORT (FC)
RA-V-126
1.5" (DN 40)W
4-58-01
AC 4-62-01 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-072
1.5" (DN 40)W
4-58-01
AC 4-62-01 CARGO HLD AIR COOLER RETURN VALVE
RA-V-073
2.5" (DN 65)
4-58-01
BRINE CHILL SUPPLY VLV AC 4-62-01 VEST (FO)
RA-V-075
2.5" (DN 65)
4-58-01
BRINE DEFROST SUPPLY VLV AC 4-62-01 VEST (FC)
RA-V-076
2.5" (DN 65)
4-58-01
BRINE DEFROST RETURN VLV AC 4-62-01 VEST (FC)
RA-V-077
2.5" (DN 65)
4-58-01
BRINE CHILL RETURN VLV AC 4-62-01 VEST (FO)
RA-V-078
2" (DN 50)L
4-58-02
AC 4-65-1 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-079
2" (DN 50)L
4-58-02
AC 4-65-1 CARGO HLD AIR COOLER RETURN VALVE
RA-V-080
2" (DN 50)W
4-58-02
AC 4-65-3 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-083
2" (DN 50)W
4-58-02
AC 4-65-3 CARGO HLD AIR COOLER RETURN VALVE
RA-V-084
2" (DN 50)W
4-58-02
AC 4-65-2 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-088
2" (DN 50)W
4-58-02
AC 4-65-2 CARGO HLD AIR COOLER RETURN VALVE
RA-V-089
2" (DN 50)L
4-58-02
AC 4-65-4 CARGO HLD AIR COOLER SUPPLY VALVE
RA-V-092
2" (DN 50)L
4-58-02
AC 4-65-4 CARGO HLD AIR COOLER RETURN VALVE
RA-V-093
4" (DN 100)
4-58-02
BRINE FREEZE RETURN VLV 4TH DK STBD (FO)
RA-V-085
4" (DN 100)
4-58-02
BRINE CHILL RETURN VLV 4TH DK STBD (FC)
RA-V-086
4" (DN 100)
4-58-02
BRINE DEFROST RETURN VLV 4TH DK STBD (FC)
RA-V-087
4" (DN 100)
4-58-02
BRINE FREEZE SUPPLY VLV 4TH DK PORT (FO)
RA-V-094
4" (DN 100)
4-58-02
BRINE CHILL SUPPLY VLV 4TH DK PORT (FC)
RA-V-095
4" (DN 100)
4-58-02
BRINE DEFROST SUPPLY VLV 4TH DK PORT (FC)
RA-V-096
2" (DN 50)
4-58-1
BRINE FREEZE RETURN VLV PRE-STAGE 4 (FO)
RA-V-169
2" (DN 50)
4-58-1
BRINE CHILL RETURN VLV PRE-STAGE 4 (FC)
RA-V-170
2" (DN 50)W
4-58-1
BRINE DEFROST RETURN VLV PRE-STAGE 4 (FC)
RA-V-171
2" (DN 50)
4-58-1
BRINE FREEZE RETURN VLV PRE-STAGE 3 (FO)
RA-V-179
2" (DN 50)
4-58-1
BRINE CHILL RETURN VLV PRE-STAGE 3 (FC)
RA-V-180
2" (DN 50)
4-58-1
BRINE DEFROST RETURN VLV PRE-STAGE 3 (FC)
RA-V-181
2" (DN 50)
4-58-1
BRINE CHILL RETURN VLV CAT 8 STOREROOM (FO)
RA-V-207
2" (DN 50)
4-58-1
BRINE DEFROST RETURN VLV CAT 8 STOREROOM (FC)
RA-V-208
2.5" (DN 65)
4-58-1
BRINE FREEZE RETURN VLV PRE-STAGE 2 (FO)
RA-V-189
2.5" (DN 65)
4-58-1
BRINE CHILL RETURN VLV PRE-STAGE 2 (FC)
RA-V-190
2.5" (DN 65)
4-58-1
BRINE DEFROST RETURN VLV PRE-STAGE 2 (FC)
RA-V-191
2.5" (DN 65)
4-58-1
BRINE FREEZE RETURN VLV PRE-STAGE 1 (FO)
RA-V-199
2.5" (DN 65)
4-58-1
BRINE CHILL RETURN VLV PRE-STAGE 1 (FC)
RA-V-200
2.5" (DN 65)
4-58-1
BRINE DEFROST RETURN VLV PRE-STAGE 1 (FC)
RA-V-201
2" (DN 50)W
4-58-2
BRINE FREEZE SUPPLY VLV PRE-STAGE 4 (FO)
RA-V-162
2" (DN 50)
4-58-2
BRINE CHILL SUPPLY VLV PRE-STAGE 4 (FC)
RA-V-163
2" (DN 50)
4-58-2
BRINE DEFROST SUPPLY VLV PRE-STAGE 4 (FC)
RA-V-164
2" (DN 50)
4-58-2
BRINE FREEZE SUPPLY VLV PRE-STAGE 3 (FO)
RA-V-172
2" (DN 50)
4-58-2
BRINE CHILL SUPPLY VLV PRE-STAGE 3 (FC)
RA-V-173
2" (DN 50)
4-58-2
BRINE DEFROST SUPPLY VLV PRE-STAGE 3 (FC)
RA-V-174
2" (DN 50)
4-58-2
BRINE CHILL SUPPLY VLV CAT 8 STOREROOM (FO)
RA-V-202
2" (DN 50)
4-58-2
BRINE DEFROST SUPPLY VLV CAT 8 STOREROOM (FC)
RA-V-203
2.5" (DN 65)
4-58-2
BRINE FREEZE SUPPLY VLV PRE-STAGE 2 (FO)
RA-V-182
2.5" (DN 65)
4-58-2
BRINE CHILL SUPPLY VLV PRE-STAGE 2 (FC)
RA-V-183
2.5" (DN 65)
4-58-2
BRINE DEFROST SUPPLY VLV PRE-STAGE 2 (FC)
RA-V-184
2.5" (DN 65)
4-58-2
BRINE FREEZE SUPPLY VLV PRE-STAGE 1 (FO)
RA-V-192
2.5" (DN 65)
4-58-2
BRINE CHILL SUPPLY VLV PRE-STAGE 1 (FC)
RA-V-193
2.5" (DN 65)
4-58-2
BRINE DEFROST SUPPLY VLV PRE-STAGE 1 (FC)
RA-V-194

USNS LEWIS AND CLARK

(T-AKE 1)

AUXILIARY SYSTEMS
SOL.NO. N32205-20-R-4091

5/11/20

ITEM NO. 556 Category ‘A’ MSC/N756/LSC

ENCLOSURE VALVE LOCATION, DESCRIPTION AND VALVE ID

556 - 11

MSC USE ONLY: VR20-036

image1.png image2.png image3.png

File details come from the government source that posted it. Updated .