This document contains clarification questions and answers regarding a solicitation for repair and overhaul services for the USNS Lewis & Clark (T-AKE 1) class ship. The solicitation requires the contractor to clean and gas free various tanks, voids, cofferdams and spaces on the ship as identified in an enclosure. The contractor must submit unit pricing to continue existing services for items such as furnishing office space, general services, information technology, project planning reports, fire protection and ship safety programs, and COVID prevention services. The Navy seeks clarification on tank details and will provide an updated enclosure with location and capacity information for each space. Pricing is to be provided for a 15 day period with the understanding that the rate will apply for the duration of any extension. The Department of the Navy Military Sealift Command issued the solicitation.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220520R4091
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
CLARIFICATION QUESTIONS GROUP3
1. SPECIFICATION ITEM NO.: 030
PARAGRAPH / SECTION NO: 7.8
TITLE: CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS, AND SPACES
QUESTION:
Paragraph 7.8 calls to submit unit pricing as per work item 040 force protection. Work item 040 has not been provided. Please clarify….
ANSWER:
Disregard step. Paragraph deleted.
1.0 ABSTRACT
1.1 This item describes the requirements for the contractor to continue delivering services described in parent work items 010, 011, 012, 013, 016, 019, 020, 040, and 090.
2.0 REFERENCES/ENCLOSURES: None
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity
3.1.1 Location: As described in parent work item
3.1.2 Quantity: As described in parent work item
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES: None
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK
7.1 Submit a unit price per day for 15 days for the continuation services described in parent work item 010 FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT). The proposed daily rate will be used for the duration of the extension.
7.2 Submit a unit price per day for 15 days for the continuation services described in parent work item 011 GENERAL SERVICES FOR THE SHIP. The proposed daily rate will be used for the duration of the extension.
7.3 Submit a unit price per day for 15 days for the continuation services described in parent work item 012 INFORMATION TECHNOLOGY SERVICES. The proposed daily rate will be used for the duration of the extension.
7.4 Submit a unit price per day for 15 days for the continuation services described in parent work item 013 PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS. The proposed daily rate will be used for the duration of the extension.
7.5 Submit a unit price per day for 15 days for the continuation services described in parent work item 016 FIRE PROTECTION AND SHIP’S SAFETY PROGRAM. The proposed daily rate will be used for the duration of the extension.
7.6 Submit a unit price per day for 15 days for the continuation services described in parent work item 019 SHIPBOARD ACCESS AND SECURITY. The proposed daily rate will be used for the duration of the extension.
7.7 Submit a unit price per day for 15 days for the continuation services described in parent work item 020 GAS FREE CERTIFICATES. The proposed daily rate will be used for the duration of the extension.
7.8 Submit a unit price per day for 15 days for the continuation services described in parent work item 090 DAILY COVID-19 PREVENTION AND CONTROL SERVICES. The proposed daily rate will be used for the duration of the extension.
8.0 GENERAL REQUIREMENTS
8.1 None additional.
2. SPECIFICATION ITEM NO.: 021
PARAGRAPH / SECTION NO: enclosure 2.2.1
TITLE: CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS, AND SPACES
QUESTION:
Enclosure 2.2.1 does not identify tank #, location, capacity, area, etc.
Please provide updated enclosure 2.2.1
ANSWER: Updated work item attached.
USNS LEWIS AND CLARK
(T-AKE 1)
| GENERAL REQUIREMENTS |
| SOL. NO. N32205-20-R-4091 |
28 August, 2020
| ITEM NO. |
| 021 |
| Category “A” |
| MSC/SWI/N75/PPE |
CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS, AND SPACES
1.0 ABSTRACT
1.1 This item describes the requirements for the contractor to open, clean, gas-free, maintain, and close miscellaneous tanks, voids, cofferdams, and spaces. Storage of re-usable fuel and lube oils is also required.
2.0 REFERENCES/ENCLOSURES
2.1 References:
2.1.1 NAVSEA Drawing 801-8388071, Capacity Plan
2.1.2 NAVSEA Drawing 801-8195239, Trim & Stability Booklet
2.2 Enclosures:
2.2.1 USNS Lewis and Clark (T-AKE 1) List of Applicable Tanks, Voids and Cofferdams
3.0 ITEM LOCATION/DESCRIPTION
1.1. Location/Quantity: See enclosure 2.2.1
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES
5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with all applicable GTR requirements.
5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item.
5.3 The definitions of many terms used in this work item are found in Work Item 001.
5.4 In the event that any tank contents are deemed to be hazardous wastes in accordance with federal, state and local (CONUS) or international (OCONUS) standards, the costs for handling and disposal of those wastes shall be covered under Work Item 023 of this work package.
6.0 QUALITY ASSURANCE REQUIREMENTS
6.1 Tank coating system conditions shall be identified and documented by the contractor during tank surveys. ABS surveyor shall receive a copy of contractor’s reports.
7.0 STATEMENT OF WORK
7.1 It is the contractor’s responsibility to analyze and properly plan tank unloading procedures to ensure that no undue stresses are imposed on the vessel structure. Ship’s force and MSCREP will assist contractor with ship loading documents and software. The contractor shall utilize the services of a naval architect or structural engineer to support this planning. The contractor shall provide their tank unloading plan to the MSCREP at least two business days prior to starting this work to permit review and approval by MSC naval architect.
7.2 Contractor and ship’s force shall take, record, and verify soundings of all tanks listed in enclosure 2.2.1, on arrival at the contractor’s facility. The Chief Engineer shall review and endorse all soundings taken/recorded. Submit copy of endorsed record to the MSCREP.
7.3 Provide a clean storage facility with a capacity of approximately 10,000 gallons of fuel oil, 5,000 gallons of JP-5 and 10,000 gallons of lube oil. Contractor designated storage facility shall be inspected by the MSCREP for cleanliness and acceptability prior to any transferring of fuel oil and lube oil. Prior to off-loading liquids, samples shall be taken by the contractor of each of the tanks to be moved to temporary storage. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately. Upon completion of transferring of liquids, the contractor, in conjunction with ship's force, shall validate quantities at the storage facility.
7.3.1 In the event that contamination is suspected, a change order will be issued to the contractor to have a laboratory analysis conducted on the sample.
7.4 Removals: The ship will pump down tanks to low suction, either to other tanks onboard or to shore storage facilities. In the event that the tank contents are being moved off the ship, the contractor shall provide support to the vessel, including all hoses and manpower on the shore side to accomplish this removal. Contractor shall be responsible to provide all pumps, hoses, fittings and personnel to safely remove all remaining tank contents as identified in enclosure 2.2.1. Applicable federal, state, local or international procedures for transferring fuel and lube oils over water shall be followed by the contractor. Contents to be temporarily stored are indicated in the enclosure. All other liquids shall be disposed of in accordance with local, state, federal and/or international regulations. In some states, the presence of oil in the wash water may deem the mixture to be hazardous waste. When pricing this item, the contractor shall assume that oil is present in the tank wash water. The cost for disposal of the mixture shall be included in the price quote regardless of whether or not, due to the presence of oil, the wash water is deemed hazardous waste or non-hazardous waste. If the mixture is determined to be hazardous waste due to some contaminant other than oil, the procedures outlined in Work Item 023 shall be used for the identification, handling and disposal. The costs for removal are still part of this work item (021). All other costs for offload and disposal shall be captured in this work item.
7.5 When directed by the MSCREP, return all fuel oil and lube oil to the vessel. Prior to returning of liquids, the contractor, together with ship's force, shall take samples of all stored liquids. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with temporary storage tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately.
7.6 Accomplish the following for each tank/space listed in enclosure 2.2.1:
7.6.1 Open manholes and erect/maintain safety guards over openings.
7.6.2 Temporarily provide blowers and ventilate tanks and spaces, inclusive of confined areas around manhole covers.
7.6.2.1 Ventilation of the tanks shall be accomplished so as to prevent tank fumes from exhausting in the interior compartments of the ship.
7.6.3 Temporarily provide and maintain, as required, tank lamping/lighting. Lighting shall be explosion proof, safety type lights.
7.7 Clean and Gas Free tanks and spaces listed in enclosure 2.2.1. Cleaning shall completely remove all traces of dirt, sludge, debris and liquids. All tanks and spaces shall be presented in a clean and dry condition and shall be ready to be certified and maintained safe for men/safe for hot work. The provision of gas free certificates is covered under Work Item 020 of this work package.
7.7.1 Where a battery of tanks is designated for cleaning and gas freeing, all interior spaces in way of same, such as cofferdams, voids, bilges, bilge wells and other spaces, even if not specifically mentioned, shall be considered as being included as spaces to be cleaned and gas freed.
7.7.2 For all tanks and spaces indicated in enclosure 2.2.1, air vents, sounding tubes, filling and suction lines and other appurtances shall be included for cleaning and gas freeing. Secondary manhole covers for each tank shall also be opened.
7.7.3 Post original gas free certification at each tank/space location. Certificate shall be mounted directly at the tank/space manhole entrance.
7.7.4 Post copy of gas free certificates at the designated gangway access to the vessel. Certifications posted at gangway shall be in a protective weather/water proof enclosure that is accessible and visible.
7.8 Surveys and testing requirements for these tanks shall be addressed in other work items in this work package.
7.9 At the conclusion of all required work, conduct a final closeout inspection for each tank/space listed in enclosure 2.2.1 with the MSCREP. No tank shall be closed until a final inspection is accomplished with the MSCREP in attendance.
7.9.1 Contractor is responsible for repairing all tank coating damage caused by work in this solicitation work package. During close out inspection, if coatings are found damaged by contractor’s work, contractor shall repair damaged areas prior to final close out of tank/space, at contractor’s expense. Damaged coatings shall be repaired in accordance with MSC paint system and the paint representative’s recommendations.
7.9.2 Ensure all blowers, lighting, staging, tools, and miscellaneous equipment are removed prior to the final inspection. Any staging necessary for MSCREP close out inspection shall be removed just prior to final acceptance close out of tank/space.
7.9.3 Present tank in final clean condition. No dirt, dust, debris or liquids shall be allowed. Any tank or space failing the close out inspection, shall be re-cleaned until passing MSCREP inspection (repeated cleanings and inspections will be at contractor expense, and may become subject to issuance of a QDR).
7.10 Upon acceptance of final closeout inspection and by direction of the MSCREP, reinstall manhole covers using new gaskets, grommets, and wicking. Submit a condition found report for any missing or damaged fasteners or hardware.
7.11 The following tanks and spaces, included in enclosure2.2.1, shall be opened, cleaned and prepared for gas free certification within 7 days of the shipyard availability start:
· Engine Room Bilges
· AMR Bilges
· Pump Room Bilges
· Shaft Alley Bilges
· Motor Room bilges
· FO Storage Tk 6-62-4
· FO Storage Tk 6-66-2
· VCHT Tank 3-75-6
· Forepeak Tank (6-M-0)
· SW Ballast Tank ((6-24-1)
· SW Ballast Tank ((6-24-2)
· All Potable Water Tanks (Cargo and Ships)
7.12 Required deliverable report: Contractor shall create, maintain, update, and submit weekly during the progress meeting, a tank/space work matrix. This matrix shall contain the following information:
7.12.1 Tank/Space Name
7.12.2 Tank/Space Location Designation
7.12.3 Date Tank/Space Opened
7.12.4 Date Gas Free Cleaning Started
7.12.5 Date Gas Free Cleaning Completed
7.12.6 Date Gas Free Cert. Received
7.12.7 Date ABS Initial Structural Survey Complete
7.12.8 Date Air Test/Hydro Test Completed
7.12.9 Date Final Tank/Space Cleaning Started
7.12.10 Date Final Tank/Space Cleaning Completed
7.12.11 Date Tank/Space Final Close
7.12.12 Tank/Space Related Repair Status: List major job sequence within a tank/space followed by date start & date completed (such as below):
7.12.12.1 Access Cuts -> date removed/date installed
7.12.12.2 Blasting -> date start/date complete
7.12.12.3 Painting -> date start/date complete
7.12.12.4 Related work items internal repairs (pipe, valve, structure, etc.)
7.12.12.5 Related work items external repairs (welding, UT’s, zincs, other structural related; etc.)
7.12.12.6 Fluids added/removed from tank/space (pot water chlorination; Undocking stability; fuels/oils; etc.)
7.12.13 Other
7.13 Paint all disturbed surfaces to match surroundings.
8.0 GENERAL REQUIREMENTS: None additional.
ENCLOSURE 2.2.1
USNS Lewis and Clark (T-AKE 1)
TANKS, VOIDS, AND COFFERDAMS
NOTE: Tank Arrival Conditions are estimates only.
| Tank/Space |
| Product |
| Location |
| 100% Bbls |
| 100% Gals |
| Clean and Gas Free |
| Cargo Fuel 1C |
| JP5 |
| 4-24-0 |
| 7,196 |
| 302,223 |
| X |
| Cargo Fuel 2C |
| JP5 |
| 4-30-0 |
| 8,026 |
| 337,105 |
| X |
| Cargo Fuel 3S |
| JP-5 |
| 4-34-1 |
| 4,409 |
| 185,198 |
| X |
| Cargo Fuel 3C |
| JP5 |
| 4-34-0 |
| 2,233 |
| 93,771 |
| X |
| Cargo Fuel 3P |
| JP5 |
| 4-34-2 |
| 4,409 |
| 185,198 |
| X |
| Cargo Fuel Slop Tank |
| Oily Water |
| 4-38.5-0 |
| 893 |
| 37,491 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-34-1 |
| 1,453 |
| 61,011 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-34-2 |
| 1,427 |
| 59,949 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-40-1 |
| 2,201 |
| 92,444 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-40-2 |
| 2,201 |
| 92,444 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-49-1 |
| 2,277 |
| 95,627 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-49-01 |
| 1,655 |
| 69,499 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-49-2 |
| 2,277 |
| 95,627 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-58-1 |
| 1,579 |
| 66,316 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-58-0 |
| 1,321 |
| 55,484 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-58-2 |
| 1,573 |
| 66,051 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-62-1 |
| 1,761 |
| 73,964 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-62-01 |
| 1,258 |
| 52,832 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-62-4 |
| 1,761 |
| 73,964 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-66-1 |
| 1,025 |
| 43,061 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-66-2 |
| 949 |
| 39,878 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 6-72-0 |
| 835 |
| 35,059 |
| X |
| Fuel Oil Service Tank |
| DFM |
| 3-75-3 |
| 1,887 |
| 79,269 |
| X |
| Ship's Fuel Oil Tank |
| DFM |
| 3-79-3 |
| 1,172 |
| 49,206 |
| X |
| Fuel Oil Settling Tank |
| DFM |
| 4-79-6 |
| 1,408 |
| 59,154 |
| Fuel Oil Service Tank |
| DFM |
| 3-81.5-2 |
| 1,761 |
| 73,964 |
| Fuel Oil Overflow Tank |
| DFM |
| 3-82-1 |
| 1,541 |
| 64,724 |
| Lube Oil Storage Tank |
| Lube Oil |
| 3-82.5-1 |
| 795 |
| 33,379 |
| X |
| Lube Oil Storage Tank |
| Lube Oil |
| 3-82.5-3 |
| 795 |
| 33,379 |
| X |
| Lube Oil Settling Tank |
| Lube Oil |
| 3-73.5-2 |
| 165 |
| 6,941 |
| Lube Oil Sump No. 1 |
| Lube Oil |
| 6-68-3 |
| 151 |
| 6,322 |
| Lube Oil Sump No. 2 |
| Lube Oil |
| 6-68-1 |
| 157 |
| 6,587 |
| Lube Oil Sump No. 3 |
| Lube Oil |
| 6-68-2 |
| 157 |
| 6,587 |
| Lube Oil Sump No. 4 |
| Lube Oil |
| 6-68-4 |
| 151 |
| 6,322 |
| Lube Oil Drain Tank |
| Lube Oil |
| 4-79-1 |
| 774 |
| 32,495 |
| X |
| Machinery Oily Waste Tank |
| Waste Oil |
| 5-71-1A |
| 139 |
| 5,840 |
| X |
| Cargo Hold Oily Waste Tank |
| Waste Oil |
| 6-62-2A |
| 33 |
| 1,391 |
| X |
| Waste Oil Tank |
| Waste Oil |
| 6-69-0 |
| 93 |
| 3,893 |
| X |
| Machinery Oily Water Tank |
| Oily Water |
| 5-71-1B |
| 93 |
| 3,893 |
| X |
| Cargo Hold Oily Water Tank |
| Oily Water |
| 6-62-2B |
| 33 |
| 1,391 |
| X |
| Fresh Water Drain Tank |
| Fresh Water |
| 6-70-0 |
| N/A |
| 10,304 |
| X |
| Fuel Leakage Tank |
| DFM |
| 6-68.5-0 |
| N/A |
| 1,112 |
| X |
| Aviation Fuel Storage Tank |
| JP-5 |
| 3-82.5-2 |
| 814 |
| 34,207 |
| X |
| JP-5 Service Tank |
| JP-5 |
| 3-84-2 |
| 139 |
| 5,840 |
| Aviation Overflow Tank |
| JP-5 |
| 4-79-2 |
| 1139 |
| 47,834 |
| Cargo Pump Room |
| Oily Water |
| 5-34-0 |
| N/A |
| N/A |
| X |
| Main Machinery Space Bilges |
| Oily Water |
| 5-66-0 |
| N/A |
| N/A |
| X |
| Aux Machinery Space Bilges |
| Oily Water |
| 5-58-0 |
| N/A |
| N/A |
| X |
| Motor room |
| Oily water |
| 5-75-0 |
| N/A |
| N/A |
| X |
| Shaft Alley |
| Oily Bilges |
| 5-79-0 |
| N/A |
| N/A |
| X |
| JP-5 Pump Room Bilges |
| Oily Water |
| 3-82.5-4 |
| N/A |
| N/A |
| X |
| Cargo Potable Water |
| Fresh Water |
| 3-79-2 |
| N/A |
| 26,552 |
| X |
| Cargo Potable Water |
| Fresh Water |
| 3-80.5-2 |
| N/A |
| 26,552 |
| X |
| Ship's Potable Water |
| Fresh Water |
| 3-79-1 |
| N/A |
| 26,552 |
| X |
| Ship's Potable Water |
| Fresh Water |
| 3-80.5-1 |
| N/A |
| 26,552 |
| X |
| Distilled Water Tank |
| Fresh Water |
| 3-79-0 |
| N/A |
| 31,440 |
| X |
| Fore Peak Tank - Salt Water Ballast |
| Salt Water |
| 6-M-0 |
| N/A |
| 176,750 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-24-1 |
| N/A |
| 201,585 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-24-2 |
| N/A |
| 201,585 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-30-1 |
| N/A |
| 159,577 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-30-2 |
| N/A |
| 159,577 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 4-34-3 |
| N/A |
| 89,564 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 4-35-2 |
| N/A |
| 76,618 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-45-1 |
| N/A |
| 53,897 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-45-2 |
| N/A |
| 53,897 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-54-1 |
| N/A |
| 127,344 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-54-01 |
| N/A |
| 54,161 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 6-54-2 |
| N/A |
| 127,344 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 4-83-1 |
| N/A |
| 46,499 |
| X |
| Salt Water Ballast Tank |
| Salt Water |
| 4-83-2 |
| N/A |
| 46,499 |
| X |
| EDG Fuel Service Tank |
| DFM |
| 03-73-1 |
| N/A |
| 3,059 |
| Food Waste Tank |
| Fresh Water |
| 3-77-2 |
| N/A |
| 2,114 |
| X |
| Gray Water Collection Tank |
| Fresh Water |
| 3-77-4 |
| N/A |
| 25,627 |
| X |
| MDG Cleaning Tank |
| Fresh Water |
| 6-68-0 |
| N/A |
| 528 |
| VCHT Sludge Tank |
| Fresh Water |
| 3-75-6 |
| N/A |
| 1,321 |
| X |
| Cofferdam |
| Empty |
| 6-45-01 |
| N/A |
| 77,411 |
| X |
| Cofferdam |
| Empty |
| 6-67.5-0 |
| N/A |
| 95,376 |
| X |
| Void |
| Empty |
| 6-13-0 |
| N/A |
| 12,682 |
| X |
| Void |
| Empty |
| 6-75-0 |
| N/A |
| 26,156 |
| X |
| Void |
| Empty |
| 6-79-0 |
| N/A |
| 22,985 |
| X |
| Void |
| Empty |
| 6-83-0 |
| N/A |
| 11,625 |
| X |
| Void |
| Empty |
| 4-79-3 |
| N/A |
| 109,907 |
| X |
| Void |
| Empty |
| 4-79-4 |
| N/A |
| 70,541 |
| X |
| Void |
| Empty |
| 4-85-0 |
| N/A |
| 125,231 |
| X |
| Void |
| Empty |
| 5-83-0 |
| N/A |
| 6,869 |
| X |
| Chain Locker |
| Empty |
| 2-8-2 |
| N/A |
| N/A |
| X |
(End of Summary of Changes) image1.wmf