0956_A_TAKE CCSI OVERHAULING SEA VALVES (5YR) (2).docx

DOCX document 70 KB Posted

Attached to
USNS LEWIS & CLARK ROH
Solicitation number
N3220520R4091
Issued by

About this file

This document outlines the requirements for overhauling sea valves on the USNS LEWIS AND CLARK (T-AKE 1) Class ship during its regular overhaul period. The work includes examining, servicing, testing, and replacing various sea valves and attachments on the ship's sea chests, sea connections, and overboard discharge lines. Key requirements involve removing, disassembling, cleaning, inspecting, testing, and reinstalling or replacing up to 82 sea valves ranging in size from 1 to 30 inches. The contractor must coordinate valve repairs with ABS and USCG classification surveys, and test all new and overhauled valves in the presence of inspectors. The solicitation was issued by the Military Sealift Command for the US Department of the Navy.

View the file

Other files

File Type Posted
LNC Solicitation Amend Discussions.docx DOCX document
COPY LNC SOLICITATION FINAL.docx DOCX document
USNS LEWIS CLARK AMEND 14.docx DOCX document
0502_A_HPAC ROUTINE B MAINTENANCE.docx DOCX document
0104_A_QAWT Scuttle Repairs(1).docx DOCX document
LNC ROH-DD MARCH 2021 COVER LETTER AND INDEX (3).doc DOC document
0503_A_Cargo Pumproom Drain Piping Repairs(2).docx DOCX document
USNS LEWIS CLARK AMEND 0013.docx DOCX document
USNS LEWIS CLARK Amend 0012.docx DOCX document
USNS LEWIS CLARK AMEND 0011.docx DOCX document
Updated Work Item INDEX (2).doc DOC document
USNS LEWIS CLARK Amend 10.docx DOCX document
Clarification Question 9920.docx DOCX document
USNS LEWIS AND CLARK Amend 7.docx DOCX document
USNS LEWIS AND CLARK Amend 6.docx DOCX document
Clarification Question 9420.docx DOCX document
USNS LEWIS CLARK Amend 0009 F.docx DOCX document
Updated Work Items.zip ZIP file
Clarification files Group 6.zip ZIP file
J 3 Category B Items LNC.xls XLS spreadsheet
J2 Category A Items LNC (1).xls XLS spreadsheet
USNS LEWIS CLARK Amend 0007.docx DOCX document
Clarification Questions Group 4.docx DOCX document
Clarification Question Group 3 Amend 0005.docx DOCX document
LNC Clarification Group 2 Amend 0004.docx DOCX document
LNC LIQUIDATED DAMAGES AMEND 0003.docx DOCX document
J - 3 Category B Items LNC.xls XLS spreadsheet
Clarification Questions.docx DOCX document
0554_A_CARGO BRINE VALVES AND PIPING REPLACEMENT(1).docx DOCX document
7488761_C CMWD.pdf PDF
J - 2 Category A Items LNC (1).xls XLS spreadsheet
8499057_-.pdf PDF
0503_A_Cargo Pumproom Drain Piping Repairs(1).docx DOCX document
8194698_-.pdf PDF
8194692_-.PDF PDF
Amendment 2 Clarification Group 1.docx DOCX document
8194716_-.PDF PDF
8498620 TI-79 Gray Water Piping System Modifications.pdf PDF
USNS LEWIS CLARK AMEND 0001.docx DOCX document
LEWIS CLARK SOLICITATION ROH.pdf PDF
J-ATTACHMENTS LNC.zip ZIP file
L-4 LNC ROH21 J-A.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS LEWIS AND CLARK

(T-AKE 1)

DRYDOCKING AND UNDOCKINGSOL.NO. N32205-20-R-4091
23 March 2020
ITEM NO. 956Category “A”MSC/N756/CCSI

OVERHAULING SEA VALVES (5YR)

ABSTRACT

The work item describes the requirements to examine, service and test the ships sea chests, sea valves and their attachment to the hull during the Special Survey.

REFERENCES/ENCLOSURES

References MSC Drawing 801-8388177, Docking Plan MSC Drawing No. 163-8193708, List of Closeable Exterior Shell Penetrations MSC Drawing No. 256-8194714, Central Seawater Cooling System Diagram ABS Rules for Survey After Construction, Part 7, Chapter 4, Section 1, Drydock Surveys (Commercially Available) Enclosure Sea Valve List

ITEM LOCATION/DESCRIPTION

Location/Quantity Locations: See Enclosure 2.2.1 Quantity 42 valves below scantling draft (9.75M) 40 valves above scantling draft (9.75M)

1.1 Item Description/Manufacturer’s Data: See Enclosure 2.2.1 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: Valves to be replaced.

Description
Brand
Specification
Quantity/Valve ID
One (1) inch Globe Stop Check Valve
Ladish
Fig 7275 Stainless Steel Valves
Four (4)

SC-V-101

SC-V-110

SC-V-150

SC-V-151

One and half (1.5) inch Globe Stop Check Valve
Ladish
Fig 7275 Stainless Steel Valves
Two (2)

OW-V-128

OW-V-040

Two (2) inch Globe Stop Check Valve
Ladish
Fig 7275 Stainless Steel Valves
Two (2)

MD-V-37

MD-V-86

Two (2) inch Gate Valve
Ladish
Fig 8275 Stainless Steel Valves
Seven (7)

SC-V-100

SC-V-111

SC-V-152

TV-V-37

TV-V-39

TV-V-41

TV-V-43

Two (2) inch Butterfly Valve
Crane (Centerline)
02BG07731X Ductile Iron, Rubber Lined
One (1)

SW-V-211

Two (2) inch Swing Check Valve w/ Closing Device
PIMA
Model 1626
Six (6)

WD-V-122

WD-V-123

WD-V-124

WD-V-131

WD-V-132

DD-V-011

Three (3) inch Swing Check Valve w/ Closing Device
PIMA
Model 1626
One (1)

CH-V-52

Twenty-Four (24) inch Butterfly Valve
Crane (Centerline)
24BG67731X Ductile Iron, Rubber Lined
Three (3)

FM 5-65-3

FM 5-65-18

SW-V-041

Thirty (30) inch Butterfly Valve
Crane (Centerline)
30BG67731X Ductile Iron, Rubber Lined
Three (3)

SW-V-1

SW-V-04

SW-V-33

Sixteen (16) inch Butterfly Valve
Crane (Centerline)
16BG66431X Ductile Iron, Rubber Lined
One (1)

MD-V-024

Twelve (12) inch Butterfly Valve
Crane (Centerline)
12BG06431X Ductile Iron, Rubber Lined
One (1)

BW-V-07

Eight (8) inch Butterfly Valve
Crane (Centerline)
08BG07731X Ductile Iron, Rubber Lined
Two (2)

FM COV 4-75-2

FM COV 5-36-2

Six (6) inch Butterfly Valve
Crane (Centerline)
06BG07731X Ductile Iron, Rubber Lined
One (1)

DB-V-002

Four (4) inch Butterfly Valve
Crane (Centerline)
04KG57731X Ductile Iron, Rubber Lined
Two (2)

FM COV-5-61-4

SW-V-241

Four (4) inch Swing Check Valve
PIMA
Fig B1620A Bronze
One (1)
Three (3) inch Swing Check w/ Closing Device Valve
MILWAUKEE
Model 5071
One (1)

CH-V-52

Six (6) inch Swing Check w/ Closing Device Valve
MILWAUKEE
Model 5071
One (1)

WD-V-120

NOTES

The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.

The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, including but not limited to Work Items 023, 901, 913 and 915, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLATGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

QUALITY ASSURANCE REQUIREMENTS: None additional.

2.0 STATEMENT OF WORK REQIRED

With ship’s force assistance, tag out required equipment and systems.

Examine, service and test the vessels sea chests, sea connections, sea suction and overboard valves and their attachments to the sea chest or hull using ABS, USCG, IMO and manufacturer requirements using References 2.1.1 through 2.1.4 and Enclosure 2.2.1 for guidance.

2.1.2 Temporarily open the sea chest suction grates and provide staging for inspection. Temporarily remove deck plating in way of sea valves and hull attachments to facilitate their inspection. Temporarily rope off the areas to prevent accidental injury. Restore upon completion of all repairs.

2.1.3 In the presence of ABS and/or USCG, externally examine all sea chests, sea valves and their attachment to sea chests, including expansion pieces in sea water cooling and circulating systems. Internally exam all sea chests, sea connections and spool pieces.

Shell fastenings securing the various valves, and associated parts such as pads, nipples, spuds, spool pieces, studs and flanges are to be hammer tested and examined in the presence of ABS and/or USCG.

Temporarily open the main sea water strainers and remove their strainer baskets/plates. Thoroughly clean and inspect the strainers and their components.

Inspect all associated valve actuators and reach rods. Exercise them, both locally and remotely. Grease all joints and gear boxes. Replace all missing or deteriorated pins. For bidding purposes assume 10 pins will require renewal.

Accomplish the following maintenance to the ship’s sea suction and overboard valves shown in References 2.1.1 through 2.1.3 and Enclosure 2.2.1 for guidance using ABS, IMO and manufacturer requirements as guidance:

2.1.4 Temporarily remove valves from the vessel to the shop for repair, inspection and testing. Tag and match mark each sea valve to its original location.

2.1.5 Where sea valves have been removed, temporarily install bolted hard blanks on all openings through the sea chests and any open piping systems. Contractor is responsible for any flooding or contamination of interior areas or systems resulting from contractor failure to install blanks. Any/all damages resulting shall be addressed, repaired, and/or corrected, at contractor’s expense.

2.1.6 Replace the valves listed in paragraph 4.2.1 with new valves, utilizing Reference 2.1 as guidance.

2.1.7 Clean the removed 24-inch and 30-inch valves and perform a Seat Leak test in the presence of the MSCREP and ABS. Valves that pass the inspection shall be properly protected, crated, and returned to ship for spare.

2.1.8 Temporarily remove motor operators and actuators from the valves. Protect and secure them in an out of the way location. Do not electrically disconnect the motor operators and actuators. Do not allow the motor operators and actuators to hang from their electrical cables and ensure they are protected from damage.

2.1.9 In lieu of overhaul, replace all 2-½ inch or smaller valves (except GFM provided) with new equivalent valves, new gaskets and stainless steel fasteners.

Disassemble the valves, bonnet, packing gland, and internals. Matchmark and clean all parts. Layout all parts and components for inspection by the MSCREP and ABS Surveyor.

Retain hardware and fasteners for re-use. Damaged or missing hardware or fasteners shall be renewed. For bidding purposes assume that 10% of flange fasteners will require replacement.

Chase and tap all threaded areas. Dress and true gasket mating surfaces. Clean and prepare the valve body interior for painting.

Straighten valve stems to within 0.002 inch total indicator run-out. Polish stems to a 32 finish (RMS). Remove any raised edges and foreign matter.

Machine, grind and lap valve seats and discs. Spot in the gate or disc to its seat obtaining a 360 degree contact. Verify contact using the bluing method in the presence of the MSCREP and the ABS Surveyor and USCG inspector.

For gate valves, the transfer line shall be of uniform width within the center of disc seating surface;

For globe valves, transfer line shall be of uniform width covering one third of the seating surface within the center fifty percent of disc seating surface and at the bottom edge of the conical seat;

For plug and ball valves, vertical misalignment of parts with the plug or ball fully seated is not to not exceed 1/16 inch;

For butterfly valves, provide and renew bushings, O-rings, valve boot (butyl seat), washers, pins, fasteners, packing and seals.

2.1.10 For valves with steel bodies, coat valve body interiors with two (2) coats of Apexior No. 3.

2.1.11 Replace all bonnet gaskets, flange gaskets and valve stem packing with new material.

2.1.12 All fasteners shall be coated with "Anti-Seize" compound prior to installation.

2.1.13 Upon satisfactory inspection of all valve components and seat contact checks by the MSCREP and ABS Surveyor reassemble the valves leaving them in a ready for service condition.

2.2 Coordinate and conduct tests of the sea chests, sea connections, sea suction and overboard valves and their attachments listed in Enclosure 2.2.1 in the presence of the MSCREP and ABS Surveyor:

2.2.1 For valves new and repaired in the shop, conduct;

a. Liquid penetrant inspections of the seats, disc, and body inlay areas for cracks.

b. Hydrostatic tests on each valve to 5 bar (5.1 kgf/cm2, 72.5 psi. Test shall be applied to each side of valve seat and disc. Demonstrate that the valves are leak free in the presence of the MSCREP and ABS Surveyor and USCG inspector. Hydrostatic pressure test shall be performed and demonstrated in direction from sea.

c. After successful testing, convey valves back to ship and install using new gaskets and monel hardware.

2.2.2 With ship’s force assistance, remove tags and operationally test all motor operated valves (MOV) and reach rod operated valves to ensure they are installed and function correctly.

2.2.3 Visually examine the sea chests, sea connections and sea valves during undocking of ship. No leakage is allowed at valve stems or disturbed joints.

2.2.4 Operationally test all the sea chests, sea connections and sea valves during undocking of ship to the satisfaction of MSCREP and Chief Engineer. Verify they operate correctly and are leak free.

2.3 Reports

2.3.1 When examination, servicing and testing reveal any deficiency a condition report is to be submitted to the MSCREP with recommended repair and parts required. Submit three (3) typewritten copies and one (1) electronic copy in Portable Document Format (PDF).

2.3.2 Sea Valves Status Spreadsheet:

7.5.2.1 Provide Sea Valve Status Spreadsheet and updated status with weekly progress report. Sea Valve Status Spreadsheet shall include but not be limited to the following information:

a. Valve designation/type/size/location

b. Removed

c. Hydrostatic Pressure Test (initial)

d. Pass/Fail

e. Disassembled/Cleaned

f. Overhauled

g. Hydrostatic Pressure Test (Final)

h. Pass/Fail

i. Painted

j. Installed / Not installed

2.3.3 Submit three (3) typewritten copies of the sea valve hydrostatic test results and one (1) electronic copy in Portable Document Format (PDF) to the MSCREP and one (1) electronic copy in Portable Document Format (PDF) to the ABS Surveyor.

2.4 Painting/Lagging

2.4.1 Prepare, prime, paint and restore all new, soiled, and disturbed surfaces to match surrounding surfaces.

2.4.2 Restore all disturbed lagging.

2.5 Manufacturer’s Representative: None additional.

2.6 Preparation of Drawings: None

3.0 GENERAL REQUIREMENTS: None additional.

USS MOUNT WHITNEY

(LCC 20)

DRYDOCKING and UNDOCKINGRFP. NO. N32205-XX-R-XXXX
10 April 2019
ITEM NO. 956Category “A”MSC/N754/CSI

OVERHAULING SEA VALVES (5YR)

USNS LEWIS AND CLARK

(T-AKE 1)

DRYDOCKING AND UNDOCKINGSOL.NO. N32205-20-R-4091
23 March 2020
ITEM NO. 956Category “A”MSC/N756/CCSI

OVERHAULING SEA VALVES (5YR)

956-6

Enclosure 2.2.1 SEA VALVE LIST –

Valve Designator
Space Number
FR
Side
Deck
Space Name
Pipe Size (mm)
Valve Height Above Deck (mm)
Penetration Height ABL (mm)
Above Scantling Draft? 9.75M
System
Penetration Type
Service
Pipe Material
Valve Model
Valve Mfr
Valve Material
BW-V-07
5-34-0
35
P
TT
Fwd Pump Room
350
966
2,966
No
Ballast Water
Inlet
Ballast Pump Suct
Carbon Steel
Butterfly
Crane
12BG06431X
CH-V-52
5-75-0
75.5
P
4th
Propulsion Motor Room (PMR)
80
3,108
9,283
No
Black Water
Discharge
Sewage Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071 (3INCH)
CH-V-072
3-75-6
76
P
3rd
Sewage Treatment Room
100
737
11,087
Yes
Waste Drain
Discharge
MSD & VCHT Emerg'y Ovbd
Carbon Steel
Swing Check w Closing Device
Milwaukee
5071
CO-V-053
5-39.5-2
39
S
3rd
Pump Room Access
50
955
11,305
Yes
Cargo Oil
Discharge
Cargo Oil Monitor Ovbd
Stainless Steel
Gate
Bonney Forge
L1-11-RF
DB-V-002
5-66-0
66.5
P
4th
Main Machy Room (MMR)
150
668
6,843
No
Distiller Brine
Discharge
Distiller Brine Ovbd
Carbon Steel
Butterfly
Crane
06BG07731X
DD-V-001
1-28-2
29
P
Main
UNREP Gear Locker & Rope Stow
50
3,662
22,212
Yes
Deck Drain
Scupper
Fo'c'sle
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-002
1-24-0
28
S
Main
MHE space
50
2,671
21,221
Yes
Deck Drain
Scupper
Fo'c'sle
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-003
2-34-0
38
P
2nd
COSAL Stores
50
2,121
16,571
Yes
Deck Drain
Scupper
Main Deck
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-004
2-34-0
35
S
2nd
COSAL Stores
50
2,426
16,876
Yes
Deck Drain
Scupper
Main Deck
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-005
5-33-2
49
P
2nd
Distr Syst Compt 2A (P)
50
1,287
15,737
Yes
Deck Drain
Scupper
Main Deck
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-006
5-53-1
49
S
2nd
Distr Syst Compt 2A (S)
50
1,287
15,737
Yes
Deck Drain
Scupper
Main Deck
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-007
4-58-2
61
P
2nd
Distr Syst Compt 3A (P)
50
1,226
15,676
Yes
Deck Drain
Scupper
Main Deck
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-008
4-58-1
61
S
2nd
Distr Syst Compt 3A (S)
50
1,224
15,674
Yes
Deck Drain
Scupper
Main Deck
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-009
2-66-01
71
P
2nd
Cargo Hold No. 4
50
2,903
17,353
Yes
Deck Drain
Scupper
Main Deck
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-010
2-66-01
71
S
2nd
Cargo Hold No. 4
50
2,883
17,333
Yes
Deck Drain
Scupper
Main Deck
Stainless Steel
Swing Check
PIMA
B1620A
DD-V-011
4-69-1
71.5
S
4th
Engr's Workshop
100
3,543
9,718
No
Deck Drain
Scupper
Decon Station
Carbon Steel
Swing Check
PIMA
B1620A
DD-V-012
5-53-1
53
S
2nd
Distr Syst Compt 2A (S)
100
416
14,866
Yes
Deck Drain
Scupper
Decon Station
Carbon Steel
Swing Check
Milwaukee
5071
FM COV 4-75-2
4-75-2
76
P
TT
Emerg'y Fire Pump Room No. 2
200
3,952
5,952
No
Firemain
Inlet
Seachest Suction
Carbon Steel
Butterfly, Motor Operated
Crane
08BG07731X
FM COV 5-36-2
5-34-0
36
P
TT
Fwd Pump Room
200
1,262
3,262
No
Firemain
Inlet
Emerg Fire Pump No. 1 Suct
Carbon Steel
Butterfly
Crane
08BG07731X
FM COV 5-36-2
5-34-0
36
P
TT
Fwd Pump Room
200
1,262
3,262
No
Firemain
Inlet
Emerg Fire Pump No. 1 Suct
Carbon Steel
Butterfly
Crane
08BG07731X
FM COV 5-61-4
5-58-01
61.5
P
TT
Aux Machy Room (AMR)
100
924
2,924
No
Firemain
Discharge
Firemain Ovbd
Carbon Steel
Butterfly, Motor Operated
Crane
04KG57731X
FM COV 5-65-18
5-58-01
65
P
TT
Aux Machy Room (AMR)
600
1,187
3,187
No
Firemain
Inlet
Fire Pump Suct
Carbon Steel
Butterfly, Motor Operated
Crane
24BG67731X
FM COV 5-65-3
5-58-01
65
S
TT
Aux Machy Room (AMR)
600
1,132
3,132
No
Firemain
Inlet
Fire Pump Suct
Carbon Steel
Butterfly, Motor Operated
Crane
24BG67731X
FM-V-5-36-4
5-34-0
35
P
TT
Fwd Pump Room
40
821
2,821
No
Sea Connection
Inlet
Seachest Chloropac Suct
Stainless Steel
Ball - 2way, Pneumatic Operated
Kace
U2R150-88RG
FM-V-5-75-12
4-75-2
76
P
TT
Emerg'y Fire Pump Room No. 2
40
4,595
6,595
No
Sea Connection
Inlet
Seachest Chloropac Suct
Stainless Steel
Ball - 2way, Pneumatic Operated
Kace
U2R150-88RG
MD-V-024
4-70-2
71.5
P
4th
Purifier Room
400
3,535
9,710
No
Main Drain
Discharge
Dewatering Ovbd
Carbon Steel
Butterfly, Motor Operated
Crane
16BG66431X
MD-V-037
3-85-0
101
S
3rd
Steering Gear
50
3,749
14,099
Yes
Main Drain
Discharge
Void 4-85-0 Eductor Ovbd
Stainless Steel
Globe Stop Check
Ladish
7275
MD-V-060
5-39.5-2
39
S
3rd
Pump Room Access
300
1,637
11,987
Yes
Main Drain
Discharge
Dewatering Ovbd
Carbon Steel
Butterfly
Crane
12BG06431X OVHL
MD-V-074
6-M-0
13
P
3rd
Fore Peak
50
313
10,663
Yes
Main Drain
Discharge
Chain Locker Ovbd
Stainless Steel
Globe Stop Check
Ladish
7275
MD-V-080
5-53-1
49
S
2nd
Distr Syst Compt 2A (S)
250
1,545
15,995
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-081
2-54-1
57
S
2nd
Distr Syst Compt 2B (S)
250
1,509
15,959
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-085
4-58-1
61
S
2nd
Distr Syst Compt 3A (S)
250
1,583
16,033
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-086
4-69-1
72
S
4th
Engr's Workshop
50
3,584
9,759
Yes
Main Drain
Scupper
Condensate Ovbd
Stainless Steel
Globe Stop Check
Ladish
7275
MD-V-088
2-66-01
71
S
2nd
Cargo Hold No. 4
250
3,303
17,753
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-090
2-75-0
78
S
2nd
Cargo Hold No. 5
250
1,598
16,048
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-094
2-66-01
71
P
2nd
Cargo Hold No. 4
250
3,320
17,770
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-095
4-58-2
61
P
2nd
Distr Syst Compt 3A (P)
250
1,571
16,021
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-096
2-54-2
57
P
2nd
Distr Syst Compt 2B (P)
250
1,509
15,959
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-097
5-33-2
49
P
2nd
Distr Syst Compt 2A (P)
250
1,640
16,090
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-098
2-45-2
48
P
2nd
Distr Syst Compt 1B (P)
100
1,292
15,742
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-100
5-44-2
42
P
2nd
Distr Syst Compt 1A (P)
250
1,287
15,737
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-102
2-34-0
37
P
2nd
COSAL Stores
250
2,273
16,723
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-103
2-34-0
35
S
2nd
COSAL Stores
250
2,648
17,098
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-105
5-44-1
42
S
2nd
Distr Syst Compt 1A (S)
250
1,369
15,819
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
MD-V-107
2-45-1
48
S
2nd
Distr Syst Compt 1B (S)
100
1,320
15,770
Yes
Main Drain
Scupper
Transfer Deck Drain
Carbon Steel
Swing Check
PIMA
B1620A
OW-V-040
4-69-1
72
S
4th
Engr's Workshop
40
3,578
9,753
Yes
Oily Water
Discharge
Machy OWS Ovbd
Stainless Steel
Globe Stop Check
Ladish
7275
OW-V-128
4-70-2
72
P
4th
Purifier Room
40
3,545
9,720
No
Oily Water
Discharge
Cargo OWS Ovbd
Stainless Steel
Globe Stop Check
Ladish
7275
SC-V-100
5-34-0
35
P
TT
Fwd Pump Room
50
763
2,763
No
Sea Chest
Inlet
Seachest Vent
Stainless Steel
Gate
Ladish
8275
SC-V-101
5-34-0
35
P
TT
Fwd Pump Room
25
608
2,608
No
Sea Chest
Inlet
Seachest Blowdown
Stainless Steel
Globe Stop Check
Ladish
7275
SC-V-110
4-75-2
76
P
4th
Emerg'y Fire Pump Room No. 2
25
237
6,412
No
Sea Connection
Inlet
Seachest Blowdown
Stainless Steel
Globe Stop Check
Ladish
7275
SC-V-111
4-75-2
76
P
4th
Emerg'y Fire Pump Room No. 2
50
395
6,570
No
Sea Connection
Inlet
Seachest Vent
Stainless Steel
Gate
Ladish
8275
SC-V-150
5-66-0
67
P
TT
Main Machy Room (MMR)
25
2,004
4,004
No
Sea Connection
Inlet
Seachest (High) Blowout
Stainless Steel
Globe Stop Check
Ladish
7275
SC-V-151
5-66-0
67
S
TT
Main Machy Room (MMR)
25
2,315
4,315
No
Sea Connection
Inlet
Seachest (Low) Blowout
Stainless Steel
Globe Stop Check
Ladish
7275
SC-V-152
5-66-0
67
S
TT
Main Machy Room (MMR)
50
2,540
4,540
No
Sea Connection
Inlet
Seachest (Low) Vent
Stainless Steel
Gate
Ladish
8265
SW-V-001
5-66-0
67
P
TT
Main Machy Room (MMR)
750
1,170
3,170
No
Sea Water
Inlet
Seachest (High) Suct
Carbon Steel
Butterfly, Motor Operated
Crane
30BG67731X
SW-V-004
5-66-0
67
S
TT
Main Machy Room (MMR)
750
1,047
3,047
No
Sea Water
Inlet
Seachest (Low) Suct
Carbon Steel
Butterfly, Motor Operated
Crane
30BG67731X
SW-V-033
5-66-0
70
P
4th
Main Machy Room (MMR)
750
585
6,760
No
Sea Water
Discharge
Central Sea Water - Ovbd
Carbon Steel
Butterfly, Motor Operated
Crane
30BG67731X
SW-V-041
5-66-0
67
S
TT
Main Machy Room (MMR)
600
2,931
4,931
No
Sea Water
Inlet
Seachest (Low) De-Icing
Carbon Steel
Butterfly, Motor Operated
Crane
24BG67731X
SW-V-241
4-69-1
71.5
S
4th
Engr's Workshop
100
933
7,108
No
Sea Water
Discharge
Solid Waste Ovbd
Carbon Steel
Butterfly
Crane
04KG57731X
SW-V-211
5-13-0
21
p
4th
Bow Thruster Rm
50
6728
No
Sea Water
Discharge
Ovbd Discharge
Carbon Steel
Butterfly
Crane
02BG07731X
SW-V-248
5-75-0
78
P
5th
Propulsion Motor Room (PMR)
65
585
2,585
No
Sea Water
Discharge
Stern Tube Cooling Water
Carbon Steel
Butterfly, Motor Operated
Crane
SW-V-53
5-66-0
67
P
TT
Main Machy Room (MMR)
50
2,266
4,266
No
Sea Connection
Discharge
S/C (Low) Chloropac Disch
Stainless Steel
Ball - 2way, Pneumatic Operated
Kace
U2R150-88RG
SW-V-55
5-66-0
67
P
TT
Main Machy Room (MMR)
50
2,571
4,571
No
Sea Connection
Discharge
S/C (High) Chloropac Disch
Stainless Steel
Ball - 2way, Pneumatic Operated
Kace
U2R150-88RG
SW-V-57
4-75-2
76
P
TT
Emerg'y Fire Pump Room No. 2
50
4,486
6,486
No
Sea Connection
Discharge
Seachest Chloropac Disch
Stainless Steel
Ball - 2way, Pneumatic Operated
Kace
U2R150-88RG
SW-V-59
5-34-0
35
P
TT
Fwd Pump Room
50
717
2,717
No
Sea Connection
Discharge
Seachest Chloropac Disch
Stainless Steel
Ball - 2way, Pneumatic Operated
Kace
U2R150-88RG
SW-V-59
5-34-0
35
P
TT
Fwd Pump Room
50
717
2,717
No
Sea Connection
Discharge
Seachest Chloropac Disch
Stainless Steel
Ball - 2way, Pneumatic Operated
Kace
U2R150-88RG
TV-V-037
5-79-0
79.5
P
TT
Shaft Alley
50
585
2,585
No
Tank Vent
Inlet
Draft Gauge - Aft
Stainless Steel
Gate
Ladish
8275
TV-V-039
5-33-2
53.5
P
TT
Distr Syst Compt 2A (P)
50
1,301
3,301
No
Tank Vent
Inlet
Draft Gauge - Midship (P)
Stainless Steel
Gate
Ladish
8275
TV-V-41
5-53-1
53.5
S
TT
Distr Syst Compt 2A (S)
50
1,301
3,301
No
Tank Vent
Inlet
Draft Gauge - Midship (S)
Stainless Steel
Gate
Ladish
8275
TV-V-43
6-13-0
15
S
IB
Void
50
1,272
1,272
No
Tank Vent
Inlet
Draft Gauge - Fwd
Stainless Steel
Gate
Ladish
8275
WD-V-120
5-75-0
76
P
4th
Propulsion Motor Room (PMR)
150
3,212
9,387
No
Waste Drain
Discharge
Gray Water Ovbd
Carbon Steel
Swing Check w Closing Device
Milwaukee
5071 (6INCH)
WD-V-121
3-70-1
71.5
S
3rd
Engr's Storeroom
65
461
10,811
Yes
Waste Drain
Scupper
Condensate Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-122
5-53-1
53.5
S
3rd
Distr Syst Compt 2A (S)
50
3,484
13,834
Yes
Waste Drain
Scupper
Condensate Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-123
5-33-2
53.5
P
4th
Distr Syst Compt 2A (P)
50
3,470
9,644
No
Waste Drain
Scupper
Condensate Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-124
5-13-01
23.5
S
4th
Bow Thruster Room
50
3,125
9,300
No
Waste Drain
Scupper
Condensate Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-131
5-44-1
44.5
S
4th
Distr Syst Compt 1A (S)
50
3,490
9,665
No
Waste Drain
Scupper
Condensate Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-132
5-44-2
44.5
P
4th
Distr Syst Compt 1A (P)
50
3,489
9,664
No
Waste Drain
Scupper
Condensate Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-137
4-85-2
101
P
4th
Void
50
406
6,581
No
Waste Drain
Scupper
Nixie Room Drain Ovbd
Stainless Steel
Swing Check
PIMA
B1620A
WD-V-138
4-58-2
61
P
3rd
Distr Syst Compt 3B (P)
50
1,845
12,195
Yes
Waste Drain
Scupper
Dehyd Cooling Coil Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-139
4-58-1
61
S
3rd
Distr Syst Compt 3B (S)
50
1,829
12,179
Yes
Waste Drain
Scupper
Dehyd Cooling Coil Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-140
4-65-2
65
P
3rd
Distr Syst Compt 3B (P)
50
3,465
13,815
Yes
Waste Drain
Scupper
Dehyd Clg Coil Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WD-V-141
4-65-2
65
S
3rd
Distr Syst Compt 3B (P)
50
3,515
13,865
Yes
Waste Drain
Scupper
Dehyd Clg Coil Ovbd
Stainless Steel
Swing Check w Closing Device
Milwaukee
5071
WF-V-022
2-45-1
48
S
2nd
Distr Syst Compt 1B (S)
50
1,265
15,715
Yes
Washdown
Discharge
CMWD Zone 2 drain
Stainless Steel
Swing Check
PIMA
B1620A

956-9