This document outlines requirements for repairing three quick-acting watertight scuttles aboard the USNS LEWIS AND CLARK (T-AKE 1). The contractor must develop an ABS-approved drawing plan detailing the hull cut radius, scuttle insert preparation, welding procedure, and non-destructive testing required. The contractor will cut out and remove two existing scuttles in locations 07-65.5-1 and 07-66-1, prepare the corners, weld-in and inspect new replacement scuttles provided by the Navy, and conduct non-destructive testing witnessed by ABS and Navy personnel. All work must follow ABS rules for steel shipbuilding and classing. The contractor must also submit quality documentation and develop approved drawings before starting the repairs. Upon completion, the contractor will install new lagging, paint all disturbed surfaces to match surroundings, and reinstall markings.

This work is being solicited under opportunity number N3220520R4091 for repairs aboard the USNS LEWIS & CLARK, a Department of the Navy Military Sealift Command vessel.

View the file

Other files for this federal contract opportunity

Other files attached to USNS LEWIS & CLARK ROH, newest first.
File Type Posted
LNC Solicitation Amend Discussions.docx DOCX document
COPY LNC SOLICITATION FINAL.docx DOCX document
USNS LEWIS CLARK AMEND 14.docx DOCX document
LNC ROH-DD MARCH 2021 COVER LETTER AND INDEX (3).doc DOC document
0503_A_Cargo Pumproom Drain Piping Repairs(2).docx DOCX document
USNS LEWIS CLARK AMEND 0013.docx DOCX document
0502_A_HPAC ROUTINE B MAINTENANCE.docx DOCX document
USNS LEWIS CLARK Amend 0012.docx DOCX document
USNS LEWIS CLARK AMEND 0011.docx DOCX document
Updated Work Item INDEX (2).doc DOC document
USNS LEWIS CLARK Amend 10.docx DOCX document
Clarification Question 9920.docx DOCX document
USNS LEWIS AND CLARK Amend 7.docx DOCX document
USNS LEWIS AND CLARK Amend 6.docx DOCX document
Clarification Question 9420.docx DOCX document
0956_A_TAKE CCSI OVERHAULING SEA VALVES (5YR) (2).docx DOCX document
USNS LEWIS CLARK Amend 0009 F.docx DOCX document
Clarification files Group 6.zip ZIP file
J2 Category A Items LNC (1).xls XLS spreadsheet
J 3 Category B Items LNC.xls XLS spreadsheet
USNS LEWIS CLARK Amend 0007.docx DOCX document
Updated Work Items.zip ZIP file
Clarification Questions Group 4.docx DOCX document
Clarification Question Group 3 Amend 0005.docx DOCX document
LNC Clarification Group 2 Amend 0004.docx DOCX document
LNC LIQUIDATED DAMAGES AMEND 0003.docx DOCX document
J - 2 Category A Items LNC (1).xls XLS spreadsheet
0503_A_Cargo Pumproom Drain Piping Repairs(1).docx DOCX document
7488761_C CMWD.pdf PDF
0554_A_CARGO BRINE VALVES AND PIPING REPLACEMENT(1).docx DOCX document
8194692_-.PDF PDF
8194698_-.pdf PDF
J - 3 Category B Items LNC.xls XLS spreadsheet
8499057_-.pdf PDF
Clarification Questions.docx DOCX document
8194716_-.PDF PDF
Amendment 2 Clarification Group 1.docx DOCX document
8498620 TI-79 Gray Water Piping System Modifications.pdf PDF
USNS LEWIS CLARK AMEND 0001.docx DOCX document
J-ATTACHMENTS LNC.zip ZIP file
LEWIS CLARK SOLICITATION ROH.pdf PDF
L-4 LNC ROH21 J-A.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS LEWIS AND CLARK

(T-AKE 1)

HULL AND STRUCTURAL
SOL.NO: N32205-20-R-XXX
Category "A"
12/6/2019

ITEM NO. 0104

MSC/N756/LSC

QUICK ACTING WATERTIGHT SCUTTLE REPAIRS

1. ABSTRACT:

0. This item describes the requirement to repair three (3) QAWT Scuttles.

2.0 REFERENCES:

2.1 MSC Drawing Dwg. 085-7488875, Scantling Plan Deck and Profiles

2.2 NAVSEA Dwg 803-1623056, Scuttle WT, Flush Quick Acting

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity

3.1.1 Location:

a. Radio Room 07-65.5-1, 07-66-1

3.1.2 Quantity: Two (2) QAWT Scuttles

3.2 Item Description/Manufacturer’s Data:

3.2.1 QATWS, 21 inch, Flush Scuttles

4.0 GOVERNMENT-FURNISHED EQUIPMENT/MATERIAL/SERVICES:

Description
Specification
QTY
Scuttle, Flush, 21 inch
803-1623056
2 each

1. NOTES:

0. The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

0. This ship contains High Voltage (HV) electrical systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area without proper authorization.

0. THE USNS LEWIS AND CLARK ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM.

0. All Welding shall be in accordance with ABS rules for building and classing steel ships.

1. QUALITY ASSURANCE REQUIREMENTS: None Additional

1. STATEMENT OF WORK REQUIRED:

2. Develop an ABS Approved drawing plan for cut-out removal of the scuttle. Preparation procedure for new scuttle insert, weld procedure to install the new scuttle, and Non-destructive test required as specified in ABS Steel Vessel Rules. Reference 2.1 provides shell plate expansion details. The plan must detail hull cut radius required, scuttle insert preparation required, weld procedure required, and Non-destructive Testing (NDT) required. ABS is required to approve the drawing plan.

2. Cut-out and remove scuttles 07-65.5-1 & 07-66-1. Prep corners as per the ABS approved drawing plan.

2. Weld prep new scuttles as per the ABS approved drawing plan. ABS and MSCREP to inspect new scuttle insert after preparation is complete.

2. Weld-in new scuttles in accordance with ABS approved weld procedure. ABS and MSCREP to inspect root weld.

2. Perform non-destructive testing as per the ABS approved drawing plan. ABS and MSCREP to witness NDT testing.

2. Preparation of Drawings/Documents:

5. Develop an ABS approved working drawing of the proposed insert cuts and scuttle preparation including all welding. ABS is required to approve the drawing plan. Submit to MSCREP for approval prior to starting work.

5. Provide MSCREP with quality assurance documentation that includes the ABS Approved drawing plan developed, welder qualifications, and NDT test results.

2. Inspections and Testing:

6. ABS and MSCREP shall witness new scuttle Fit-up.

6. Perform a NDT test on the new scuttle in accordance with ABS instructions. MSCREP and ABS to witness testing.

2. Painting/lagging:

7. Install new lagging where lagging was removed.

7. Paint all new and disturbed surfaces to match surrounding surfaces interior and exterior. Paint will be provided by ship.

2. Markings: Reinstall markings and labels.

1. GENERAL REQUIREMENTS: None additional.

104 - 1

MSC USE ONLY: VR19-069