J-3 Category B Items (REV A).xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- USNS KANAWHA (T-AO 196) FY 21 MTA
- Solicitation number
- N32205-20-R-4008
About this file
This document contains a spreadsheet listing category B items required for the mid-term availability of the USNS KANAWHA (T-AO 196) in fiscal year 2021. The spreadsheet includes line items for physical security, continuation of services such as management, IT, and safety support, kingpost and steel structure repairs, and miscellaneous piping replacement. Labor hours and material costs are estimated for both prime and subcontractors for each line item. The related federal contract opportunity is solicitation number N32205-20-R-4008 issued by the Department of the Navy Military Sealift Command for the mid-term availability of the USNS KANAWHA (T-AO 196) in fiscal year 2021, as described in the attachments. The document provides pricing details for the category B repair and maintenance items required by the solicitation.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| USNS KANAWHA (T-AO 196) FY21 MTA | |||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | ||||||||||||||
| 7.11 | Cost To Establish Physical Security At Private Contractor's Facility In Force Protection Condition Charlie | 1 | Day | ||||||||||||
| 7.12 | Cost To Establish Physical Security At Private Contractor's Facility In Force Protection Condition Delta | 1 | Day | ||||||||||||
| 7.11 | Cost To Maintain Physical Security At Private Contractor's Facility In Force Protection Condition Charlie | 1 | Day | ||||||||||||
| 7.12 | Cost To Maintain Physical Security At Private Contractor's Facility In Force Protection Condition Delta | 1 | Day | ||||||||||||
| WI 025 Sub-Total | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Overhaul Management Team | 15 | Day | ||||||||||||
| 7.2 | General Services For The Ship | 15 | Day | ||||||||||||
| 7.3 | Information Technology Services | 15 | Day | ||||||||||||
| 7.4 | Project Planning and Monitoring | 15 | Day | ||||||||||||
| 7.5 | Fire Protection and Ship's Safety | 15 | Day | ||||||||||||
| 7.6 | Shipboard Access and Security | 15 | Day | ||||||||||||
| 7.7 | Gas Free Certificates | 15 | Day | ||||||||||||
| WI 030 Sub-Total | |||||||||||||||
| 102 | KINGPOST REPAIR | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1.1 | FAS Station Repair | 5 | ea | ||||||||||||
| 7.1.2 | RAS Station Repair | 2 | ea | ||||||||||||
| WI 102 Sub-Total | |||||||||||||||
| 107 | STEEL REPLACEMENT | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1.1 | Steel Plate Replacement | 10,000 | lbs | ||||||||||||
| 7.1.2 | Rolled Steel Structual Shapes | 5,000 | lbs | ||||||||||||
| 7.2.1 | Fillet Welds 6" or Less | 50 | ea | ||||||||||||
| 7.2.2 | Fillet Welds 7" -12 " | 50 | ea | ||||||||||||
| 7.3.1 | Striker Plate | 20 | ea | ||||||||||||
| WI 107 Sub-Total | |||||||||||||||
| 508 | MISC PIPING REPLACE | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1.1 | Eight Inch Schdeule 80 Steel Pipe | 60 | ft | ||||||||||||
| 7.1.2 | Eight Inch Flanges four bolt 150# flat face, socket welded | 8 | ea | ||||||||||||
| 7.1.3 | Eight Inch 90 Degree Elbows | 4 | ea | ||||||||||||
| 7.1.4 | Six Inch Schedule 80 Steel Pop | 80 | ft | ||||||||||||
| 7.1.5 | Six Inch Flanges four bolt 150# flat face, socket welded | 8 | ea | ||||||||||||
| 7.1.6 | Six Inch 90 Degree Elbows | 4 | ea | ||||||||||||
| 7.1.7 | Five Inch Schedule 80 Steel Pop | 80 | ft | ||||||||||||
| 7.1.8 | Five Inch Flanges four bolt 150# flat face, socket welded | 8 | ea | ||||||||||||
| 7.1.9 | Five Inch 90 Degree Elbows | 4 | ea | ||||||||||||
| 7.1.10 | Three Inch Schedule 80 Steel Pop | 80 | ft | ||||||||||||
| 7.1.11 | Three Inch Flanges four bolt 150# flat face, socket welded | 8 | ea | ||||||||||||
| 7.1.12 | Three Inch 90 Degree Elbows | 4 | ea | ||||||||||||
| 7.1.13 | Two and a half Inch Schedule 80 Steel Pop | 80 | ft | ||||||||||||
| 7.1.14 | Two and a half Inch Flanges four bolt 150# flat face, socket welded | 8 | ea | ||||||||||||
| 7.1.15 | Two and a Half Inch 90 Degree Elbows | 4 | ea | ||||||||||||
| WI 508 Sub-Total | |||||||||||||||
| TOTAL |
&"Times New Roman,Regular"&10USNS LEROY GRUMMAN (TAO-195)
| &"Times New Roman,Bold"&14 | |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N3220519R4011 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .