Attachment J-7 MSC Ship Repair Facility Survey.pdf

PDF 61 KB Posted

Attached to
USNS KANAWHA (T-AO 196) FY 21 MTA
Solicitation number
N32205-20-R-4008
Issued by

About this file

This document contains a ship repair facility survey submitted in response to a solicitation for a mid-term availability for the USNS KANAWHA (T-AO 196) in fiscal year 2021. The survey provides details on the shipyard's facilities and capabilities, including six building ways ranging up to 875 feet in length, three drydocks up to 950 feet in length accommodating vessels drawing up to 36 feet, and cranes with capacities up to 50 tons. The shipyard also has various shops for fabrication, machine work, electrical work, and other repair activities, and storage areas for materials, welding, and assembly. Employment data shows management and production staffing of over 500. The solicitation seeks repair services for the specified vessel during the indicated fiscal year through a competitive bidding process.

View the file

Other files

File Type Posted
N32205 -20-R-4008-0004.pdf PDF
J-3 Category B Items (REV A).xlsx XLSX spreadsheet
N32205-20-R-4008-0003.pdf PDF
USNS KANAWHA (T-AO 196) FY21 MTA Work Item Index (REV 3).docx DOCX document
J-2 Category A Items (REV 3).xlsx XLSX spreadsheet
N32205-20-R-4008-0002.pdf PDF
J-2 Category A Items (REV 2).xlsx XLSX spreadsheet
USNS KANAWHA (T-AO 196) FY21 MTA Work Item Index (REV 2).docx DOCX document
J-2 Category A Items (REV 1).xlsx XLSX spreadsheet
N3220520R4008-0001.pdf PDF
USNS KANAWHA (T-AO 196) FY21 MTA Work Item Index (REV 1).docx DOCX document
JA KANAWHA ROH 20R4008 (REDACTED).pdf PDF
USNS KANAWHA (T-AO 196) FY21 MTA Work Item Index.docx DOCX document
J-3 Category B Items.xlsx XLSX spreadsheet
Attachment J-9 Disclosure Lobbying Activities (SF-LLL).pdf PDF
Attachment J-10 Interport Differential.doc DOC document
J-2 Category A Items.xlsx XLSX spreadsheet
Attachment J-13 Past Performance Questionnaire.pdf PDF
Attachment J-12 Past Performance Data.pdf PDF
Attachment J-8 Request for Clarification.pdf PDF
Attachment J-14 Technical Non-Disclosure Agreement (NDA).pdf PDF
Attachment J-4 GFP List.xlsx XLSX spreadsheet
N32205-20-R-4008.pdf PDF
Exhibit A Contract Data Requirements List (CDRL).zip ZIP file
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-20-R-4008 USNS KANAWHA (T-AO 196)

ATTACHMENT J - 7 MSC Form 4330/26

SHEET 1 OF 5

MSC SHIP REPAIR FACILITY SURVEY

NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

Commander (Code M-4E3)

Military Sealift Command

Norfolk, VA 23511

SHIPYARD AND ADDRESS SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

BUILDING WAYS (M. I. W.)

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP

SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

DEPTH OF WATER

OVER

WAY END

AT DROP

OFF

NO.

CRANES SERVING WAY

TYPE

LIFT CAPACITY

(std. tons)

CERTIFICATION DATE &

CERTIFIED BY WHOM

TIDAL RANGE (DIFF. OF M.L. M.H) IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

IS SNUBBING NECESSARY?

YES NO

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD: MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (means high water)

TYPE

LENGTH

(actual & usable)

ACT:

USE:

WATER DEPTH

(M. L. W.)

IN-

BOARD

OUT-

BOARD

HEIGHT

OF

DOCK

(M.L.W.)

USE

REPAIR/

OUTFIT-

ING

SERVICES AVAILABLE

(use abbreviation of service below)

DOCK

MATERIAL TYPE

Floating--(FD)

Graving--(GD) Marine Railway (MR)

DRY DOCKS (continued)

DOCK

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH

at coping (GD), at keel blocks

OVERALL on cradle (MR), on PONTOON

(FD)

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD)

BLOCKS

LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

LEGEND (abbreviation of services)

Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM &

(STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT

RAILROAD CONNECTION (identify)

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)

SHIPYARD:

MSC SHIP FACILITY SURVEY (continued)

PRINCIPAL SHOPS AND BUILDINGS

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

DIMENSIONS OF

SHOP OR BUILDING

LARGEST EXIT

WIDTH HEIGHT

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

LIST TYPES OF WORK NORMALLY SUBCONTRACTED

ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO

SHIPYARD:

MSC SHIP REPAIR FACILITY SURVEY (continued)

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

CURRENT

CURRENT

SHIFTS

POTENTIAL MAXIMUM

MAXIMUM

NORMAL

NORMAL

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE

LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

File details come from the government source that posted it. Updated .