J-2 Category A Items (REV 1).xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- USNS KANAWHA (T-AO 196) FY 21 MTA
- Solicitation number
- N32205-20-R-4008
About this file
This document contains a contractor price breakdown for category "A" items for the mid-term availability of the USNS KANAWHA (T-AO 196) for fiscal year 2021, as solicited by the Department of the Navy's Military Sealift Command. Key details include over 100 line items for general requirements, hull and structural work, electrical systems, auxiliary machinery, habitability, and unrep replenishment equipment. Labor hours and material costs are broken down by prime contractor and subcontractor. The total price to fulfill all category "A" items is requested. Solicitation N32205-20-R-4008 provides additional context for the mid-term ship maintenance availability.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| USNS KANAWHA (T-AO 196) FY21 MTA | ||||||||||||
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | SCOPE GENERAL REQUIREMENTS AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURERS REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH BERTH AND MOORING REQUIREMENTS REV 12Feb20 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) REV 11May20 | |||||||||||
| 011 | GENERAL SERVICES FOR THE SHIP T-AO REV 02May20 | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES REV 1 | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 25Feb20 | |||||||||||
| 014 | WEIGHT AND MOMENT REPORT REV 13Feb20 | |||||||||||
| 015 | ILS GFM | |||||||||||
| 016 | FIRE PROTECTION AND SHIPS SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIPS STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL REV 13Feb20 | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS REV 13Feb20 | |||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 28Nov18 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 026 | VESSEL FINAL CLEANING REV A REV 11May20 | |||||||||||
| 090 | DAILY COVID-19 PREVENTION AND CONTROL SERVICES REV J Rev14May20 | |||||||||||
| 100 | HULL AND STRUCTURAL ITEMS | |||||||||||
| 101 | NDT KINGPOSTS | |||||||||||
| 103 | REPAIR 01 DECK BRACING REV 1 | |||||||||||
| 104 | TANK DECK OVERHEAD PRESERVATION | |||||||||||
| 106 | SPOT REPAIR TANK DECK AND 01 LEVEL NONSKID | |||||||||||
| 108 | UNREP STRUCTURAL STEEL REPLACEMENT | |||||||||||
| 109 | WEATHER DECK WATERTIGHT DOORS | |||||||||||
| 110 | PUMP ROOM BILGE POWER TOOL CLEAN AND RECOAT | |||||||||||
| 111 | SECURITY LIGHT BRACKETS OVERHAUL AND REPLACEMENT | |||||||||||
| 112 | MAIN AND FWD MAST PRESERVATION | |||||||||||
| 113 | GARBAGE CHUTE REMOVAL | |||||||||||
| 114 | BALLAST TANK 4P PRESERVATION | |||||||||||
| 115 | AFT BALLAST TANK PRESERVATION | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | PORT AND STARBOARD MN ENG TECH ASSIST | |||||||||||
| 202 | MAIN ENGINE TURBOCHARGER OVERHAUL | |||||||||||
| 203 | MAIN ENGINE INTERCOOLERS REPLACE | |||||||||||
| 252 | MAIN REDUCTION GEAR INSPECTION (5YR) | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | MOTOR REPAIRS | |||||||||||
| 302 | UPGRADE CT WINCH CONTROLLERS | |||||||||||
| 303 | PTO GROOM | |||||||||||
| 304 | INSULATE GENERATOR CABLES | |||||||||||
| 305 | ANNUAL CARGO CONSOLE GROOM | |||||||||||
| 351 | SWITCHBOARD CLEANING | |||||||||||
| 352 | MOTOR CONTROL CENTER CLEANING | |||||||||||
| 353 | THERMOGRAPHIC SURVEY (1YR) - 18DEC19 | |||||||||||
| 400 | COMMUNICATION & NAV AIDS | |||||||||||
| 401 | REFURBISH MK III BINOCULARS | |||||||||||
| 402 | 5 YEAR NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE | |||||||||||
| 451 | ANNUAL RADAR SERVICE | |||||||||||
| 452 | ANNUAL ECDIS SERVICE | |||||||||||
| 453 | ANNUAL GYRO SERVICE | |||||||||||
| 454 | ANNUAL VDR RECERTIFICATION | |||||||||||
| 455 | ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | |||||||||||
| 456 | MAGNETIC COMPASS SERVICE (2 YEAR) | |||||||||||
| 458 | WHIP ANTENNA MAINTENANCE | |||||||||||
| 459 | ECHO SOUNDER SERVICE | |||||||||||
| 460 | ANNUAL INSPECTION OF ALARMS | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | PUMP OVERHAUL REV 1 | |||||||||||
| 502 | CLAYTON E-204 BOILER MAINTENANCE | |||||||||||
| 503 | INCINERATOR MAINTENANCE AND REPAIR | |||||||||||
| 504 | INSTALL ELEC BOOSTER HOT WATER FOR GAYLORD GR | |||||||||||
| 505 | START AIR COMPRESSOR REPLACEMENT AND GROOM | |||||||||||
| 506 | LESLIE JACKET WATER COOLING VALVES OVERHAUL | |||||||||||
| 507 | ANNUAL OCM SERVICE CALIBRATION | |||||||||||
| 554 | INSPECT, TEST & CERTIFY MACHINERY SPACE CRANES & HOISTS (1 YR) | |||||||||||
| 558 | PERSONNEL ELEVATOR ANNUAL INSPECTION | |||||||||||
| 565 | FIXED GAS FIREFIGHTING SYSTEM INSPECTION & TEST (1 YR) | |||||||||||
| 567 | FIXED FOAM FIREFIGHTING SYSTEM INSPECTION & TEST | |||||||||||
| 569 | FIRE & SMOKE DETECTION & ALARM SYSTEM | |||||||||||
| 570 | PORTABLE FIRE EXTINGUISHER SERVICE | |||||||||||
| 571 | FIRE & SMOKE DAMPER SERVICE | |||||||||||
| 572 | DEEP FAT FRYER, GRILL & RANGE HOOD FIRE EXTINGUISHING SYSTEM | |||||||||||
| 573 | FIRE HOSES | |||||||||||
| 574 | FIRE DOORS AND SHUTTERS | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 602 | STBD RESCUE BOAT WINCH DAVIT INSPECT | |||||||||||
| 603 | PORT RESCUE BOAT SINGLE POINT DAVIT ANNUAL | |||||||||||
| 604 | SCBA COMPRESSOR SERVICE | |||||||||||
| 605 | SCBA EQUIPMENT ANNUAL SERVICING | |||||||||||
| 606 | RESCUE BOAT RECERTIFY | |||||||||||
| 651 | ANNUAL LIFEBOAT AND DAVIT INSPECTION | |||||||||||
| 656 | ANNUAL LIFERAFT CERTIFICATION (ABS) | |||||||||||
| 660 | DECK TILE REPLACEMENT | |||||||||||
| 661 | CARPET REPLACEMENT | |||||||||||
| 662 | DEEP FAT FRYER INSPECTION | |||||||||||
| 666 | ACCOMMODATION LADDER INSPECTION (1YR) | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 851 | ANNUAL GALLEY VENTILATION & GAYLORD HOOD CLEANING | |||||||||||
| 852 | ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | KANAWHA HYDRAULIC TRANSMISSION HEAT EXCHANGER FRAMES | |||||||||||
| 1002 | KANAWHA REPLEN PUMP MOTOR BEARING REPLACEMENT | |||||||||||
| 1003 | KANAWHA SADDLE WINCH FOUNDATION NON FITTED BOLTS REPLACEMENT | |||||||||||
| 1004 | KANAWHA RAM TENSIONER UPPER ARC MOUNTING BRACKET ASSEMBLIES | |||||||||||
| 1005 | KANAWHA LEAD ANGLE COMPENSATOR FOUNDATION BOLTS | |||||||||||
| 1007 | KANAWHA ASD FRAME AND FOUNDATION REFURBISHMENT | |||||||||||
| 1008 | KANAWHA SADDLE WINCH MOTOR REPAIRS | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS LEROY GRUMMAN (T-AO 195) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220519R4011 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .