J-2 Category A Items.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- USNS GUADALUPE FY20 ROH Federal contract opportunity
- Solicitation number
- N3220520R4005
About this file
This document contains a price breakdown template for Category A overhaul items for the USNS GUADALUPE FY20 ROH solicitation. The template includes line items for general requirements, hull and structural work, main propulsion, electrical systems, communications and navigation aids, auxiliary machinery, habitability, heating ventilation and air conditioning, drydocking and other services. It requests pricing for labor hours and materials for prime contractors, subcontractors, and other costs such as technical representatives. The related solicitation is for the USNS GUADALUPE FY20 restricted overhaul and seeks offers for the overhaul and repair of the vessel. The solicitation was issued by the Department of the Navy Military Sealift Command.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| USNS GUADALUPE (T-AO 200) FY20 ROH/DD | ||||||||||||
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHER PLAN REV AUG 16 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 100 | HULL AND STRUCTURAL ITEMS | |||||||||||
| 101 | NDT KINGPOSTS | |||||||||||
| 102 | INTERMEDIATE SURVEY | |||||||||||
| 103 | DECK PRESERVATION | |||||||||||
| 104 | 05 AND 06 LEVEL BULKHEADS REPAIR | |||||||||||
| 105 | TANK DECK PIPING RENEWAL | |||||||||||
| 106 | DECK PENETRATIONS THROUGH PUMP ROOM REPAIR | |||||||||||
| 107 | FR. 50-60 TANK DECK OVERHEAD PRESERVATION | |||||||||||
| 108 | LADDER PRESERVATION TANK DECK | |||||||||||
| 109 | AFT BALLAST TANK PRESERVATION | |||||||||||
| 110 | CARGO TANK PRESERVATION | |||||||||||
| 111 | TANK VENT PROTECTIVE DEVICE | |||||||||||
| 114 | STABILITY TEST | |||||||||||
| 115 | FLIGHT DECK PRESERVATION | |||||||||||
| 116 | CONTAMINATED FUEL OIL DRAIN TANK SOUNDING TUBE REPAIR | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | MAIN EXHAUST RESILIENT MOUNTS REPLACEMENT | |||||||||||
| 202 | STARBOARD MDE PTO CLUTCH COUPLING INSPECTION | |||||||||||
| 203 | MAIN ENGINE PARTS OVERHAUL | |||||||||||
| 204 | MAIN REDUCTION GEAR INSPECTION | |||||||||||
| 205 | MAIN ENGINE FUEL INJECTORS(23) OVERHAUL | |||||||||||
| 206 | OVERHAUL MAIN ENGINE TURBOCHARGERS | |||||||||||
| 207 | PORT AND STBD MAIN ENGINE CLUTCH & COUPLING | |||||||||||
| 208 | PROPULSION SHAFT BRAKE OVERHAUL | |||||||||||
| 210 | ME INTERCOOLER CLEANING | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | ANNUAL SWITCHBOARD CLEANING | |||||||||||
| 302 | ANNUAL GENERATOR INSPECTION | |||||||||||
| 303 | GROUP CONTROL CENTER & MOTOR CONTROLLERS | |||||||||||
| 304 | VARIOUS MOTORS OVER HAUL | |||||||||||
| 305 | ANNUAL PTO CONTROLS GROOM | |||||||||||
| 306 | CARGO CONSOLE REPAIR & GROOM | |||||||||||
| 307 | CIRCUIT BREAKERS SERVICING AND REPAIRS | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 410 | ANNUAL RADIO COMMUNCATION EQUIPMENT RECERTIFICATION | |||||||||||
| 451 | ANNUAL RADAR SERVICE | |||||||||||
| 452 | ANNUAL ECDIS SERVICE | |||||||||||
| 453 | ANNUAL GYRO SERVICE | |||||||||||
| 454 | ANNUAL VDR RECERTIFICATION | |||||||||||
| 457 | EPIRB SERVICE (5 Yr) | |||||||||||
| 458 | WHIP ANTENNA MAINTENANCE | |||||||||||
| 459 | ECHO SOUNDER SERVICE | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 502 | CT WINCH FAIRLEAD OVERHAUL | |||||||||||
| 504 | CLEAN AND PAINT MSD TANKS | |||||||||||
| 505 | SEACHEST VENT PIPE | |||||||||||
| 508 | FRESH WATER AND CONTAMINATED DRAIN TANK REPAIRS | |||||||||||
| 509 | PRESSURE VESSELS AND RELIEF VALVE TESTING | |||||||||||
| 510 | AUX BOILER MAINTENANCE AND INSPECTION - VAPOR | |||||||||||
| 512 | VACUUM SEWAGE SYSTEM CLEANING AND REPAIR | |||||||||||
| 513 | CONEX BOX SERVICE AND PRESERVATION | |||||||||||
| 514 | PUMP OVERHAULS | |||||||||||
| 515 | REEFER AC UNITS REPAIR GROOM CSI | |||||||||||
| 517 | ANNUAL INCINERATOR SERVICE | |||||||||||
| 521 | PURIFIER MAINTENANCE- WESTFALIA | |||||||||||
| 523 | FUEL OIL AND LUBE OIL FILTER OVERHAUL | |||||||||||
| 524 | ER OWS AND CARGO OCM CERTIFICATION | |||||||||||
| 525 | SHIPS SERVICE AIR COMPRESSOR GROOM | |||||||||||
| 526 | START AIR COMPRESSOR | |||||||||||
| 527 | HP AIR COMPRESSOR OVERHAUL | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | DECK COVERING REPLACEMENT | |||||||||||
| 602 | NEW LIFEBOAT INSTALLATION | |||||||||||
| 603 | SCBA EQUIPMENT ANNUAL SERVICING | |||||||||||
| 604 | SCBA COMPRESSOR ANNUAL SERVICE | |||||||||||
| 605 | PORT RESCUE BOAT DAVIT ANNUAL SERVICE | |||||||||||
| 606 | STBD RESCUE BOAT DAVIT ANNUAL SERVICE | |||||||||||
| 608 | FIRE FIGHTING EQUIPMENT ANNUAL INSPECTION | |||||||||||
| 609 | RESCUE BOATS ANNUAL SERVICE | |||||||||||
| 610 | ANNUAL PERSONAL ELEVATOR RECERTIFICATION | |||||||||||
| 611 | REINSTALL, WEIGHT TEST PORT AND STBD ACCOMODATION LADDERS | |||||||||||
| 613 | IMMERSION SUITS ANNUAL SERVICE | |||||||||||
| 614 | DAVIT ARMS REMOVAL, FALLS RENEWAL, AND WINCH INSPECTIONS | |||||||||||
| 615 | LIFE RAFT ANNUAL SERVICING | |||||||||||
| 616 | HALON BOTTLE REBUILD | |||||||||||
| 619 | FIRE AFFF ANNUAL INSPECTION | |||||||||||
| 620 | ANNUAL FIRE AND SMOKE DAMPER INSPECTION | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | CLEANING GALLERY AND SCULLERY VENTILATION SYSTEMS | |||||||||||
| 802 | CLEANING VENTILATION SYSTEMS | |||||||||||
| 803 | FOCSLE SUPPLY PLENUM STEEL RENEWAL | |||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 902 | PROPELLOR SYSTEM MAINTENANCE AND OD BOX GROOM | |||||||||||
| 903 | PROPELLOR SHAFT WEARDOWN | |||||||||||
| 904 | STERN TUBE SEAL MAINTENANCE | |||||||||||
| 905 | SPUR AND LINE CUTTERS REPLACEMENT | |||||||||||
| 906 | ZINC ANODES REPLACEMENT | |||||||||||
| 907 | HULL FREEBOARD CLEANING AND PAINTING | |||||||||||
| 908 | ANCHOR CHAIN LOCKERS | |||||||||||
| 909 | OVERHAULING SEA VALVES | |||||||||||
| 910 | CATHODIC PROTECTION SYSTEM | |||||||||||
| 911 | MARINE GROWTH INHIBITOR ANODES REPLACEMENT | |||||||||||
| 912 | RUDDER AND STERN EXAMINATION | |||||||||||
| 913 | BILGE KEEL INSPECTION | |||||||||||
| 960 | UNDERWATER HULL CLEANING PAINTING SPOT BLAST | |||||||||||
| 966 | SHAFT ALIGNMENT AND BEARING REACTION CHECKS | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | RAM TENSIONER SHEAVE BLOCK REPAIR | |||||||||||
| 1002 | DOUBLE PROBE RECEIVER BACK PLATE ASSEMBLY REPAIR | |||||||||||
| 1003 | HAULING WINCH CONTROL CABLE BRACKET | |||||||||||
| 1004 | HEAVY SPANWIRE WINCHES AND MOTORS REFURBISHMENT | |||||||||||
| 1005 | UNREP STATIONS 4 STEEL REPAIRS | |||||||||||
| 1006 | UNREP STATIONS 8 STEEL REPAIRS | |||||||||||
| 1007 | CARGO BOOM QUADRENNIAL | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS LEROY GRUMMAN (T-AO 195) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220519R4011 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .