J-2 Category A Items.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
USNS GUADALUPE FY20 ROH Federal contract opportunity
Solicitation number
N3220520R4005
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a price breakdown template for Category A overhaul items for the USNS GUADALUPE FY20 ROH solicitation. The template includes line items for general requirements, hull and structural work, main propulsion, electrical systems, communications and navigation aids, auxiliary machinery, habitability, heating ventilation and air conditioning, drydocking and other services. It requests pricing for labor hours and materials for prime contractors, subcontractors, and other costs such as technical representatives. The related solicitation is for the USNS GUADALUPE FY20 restricted overhaul and seeks offers for the overhaul and repair of the vessel. The solicitation was issued by the Department of the Navy Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to USNS GUADALUPE FY20 ROH, newest first.
File Type Posted
Amendment N3220520R4005-0002.docx DOCX document
J-2 Category A Items (REV A).xlsx XLSX spreadsheet
J-3 Category B Items (REV B).xlsx XLSX spreadsheet
Work Item Index (2.23.20).docx DOCX document
J&A Redacted - RFP N3220520R4005.pdf PDF
J-3 Category B Items REV-A.xlsx XLSX spreadsheet
J-10 Interport Differential REV-A.doc DOC document
Amendment N3220520R4005-00001.docx DOCX document
CDRL, WI-0021.pdf PDF
CDRL, WI-0019.pdf PDF
J-14 Technical Non-Disclosure Agreement (NDA).pdf PDF
CDRL, WI-0015.pdf PDF
CDRL, WI-0001.pdf PDF
CDRL, WI-0022.pdf PDF
N3220520R4005.docx DOCX document
CDRL, WI-0024.pdf PDF
J-8 Request For Clarification.pdf PDF
CDRL, WI-0007.pdf PDF
CDRL, WI-0017.pdf PDF
J-9 Disclsr Lobbying Activities SF-LLL.pdf PDF
J-7 MSC Ship Repair Facility Survey.doc DOC document
J-3 Category B Items.xlsx XLSX spreadsheet
CDRL, WI-0023.pdf PDF
CDRL, WI-0010.pdf PDF
CDRL, WI-0020.pdf PDF
J-5 SUB-CONTRACTING PLAN ASSESSMENT CHECKLIST.docx DOCX document
CDRL, WI-0016.pdf PDF
CDRL, WI-0013.pdf PDF
CDRL, WI-0011.pdf PDF
J-10 Interport Differential.doc DOC document
CDRL, WI-0018.pdf PDF
CDRL, WI-0014.pdf PDF
CDRL, WI-0003.pdf PDF
CDRL, WI-0004.pdf PDF
J-11 Dry Dock Eval Form.docx DOCX document
USNS GUADALUPE (T-AO) FY20 ROH-DD GFP List.xlsx XLSX spreadsheet
CDRL, WI-0012.pdf PDF
CDRL, WI-0006.pdf PDF
CDRL, WI-0002.pdf PDF
CDRL, WI-0005.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat A Items

USNS GUADALUPE (T-AO 200) FY20 ROH/DD
CATEGORY “A” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorGovt Mandated Tech Rep/SubOTHER COSTSTOTAL PRICE
ITEM NO.TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICEPRICETOTAL LABOR HOURSTOTAL MATERIAL
CATEGORY "A"
000GENERAL REQUIREMENTS
001INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONSNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
002TECHNICAL AND MANUFACTURER’S REPRESENTATIVESNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
003APPROACH, BERTH, AND MOORING REQUIREMENTSNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
004TESTING AND QUALITY ASSURANCENSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
005ELECTRICAL SAFETY PROCEDURES REQUIREMENTSNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
006HEAVY WEATHER PLANNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
007COLD WEATHER PLAN REV AUG 16NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
011FURNISH GENERAL SERVICES (T-AO)
012INFORMATION TECHNOLOGY SERVICES
013PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT
014PREPARATION OF WEIGHT AND MOMENT REPORT
015INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS
016FIRE PROTECTION AND SHIP'S SAFETY PROGRAM
017HANDLING SHIP'S STORES
018DELIVERY AND REDELIVERY OF VESSEL
019SHIPBOARD ACCESS AND SECURITY
020GAS FREE CERTIFICATES
021CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES
022DOCK TRIALS AND SEA TRIALS
023HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY
024PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITYNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
100HULL AND STRUCTURAL ITEMS
101NDT KINGPOSTS
102INTERMEDIATE SURVEY
103DECK PRESERVATION
10405 AND 06 LEVEL BULKHEADS REPAIR
105TANK DECK PIPING RENEWAL
106DECK PENETRATIONS THROUGH PUMP ROOM REPAIR
107FR. 50-60 TANK DECK OVERHEAD PRESERVATION
108LADDER PRESERVATION TANK DECK
109AFT BALLAST TANK PRESERVATION
110CARGO TANK PRESERVATION
111TANK VENT PROTECTIVE DEVICE
114STABILITY TEST
115FLIGHT DECK PRESERVATION
116CONTAMINATED FUEL OIL DRAIN TANK SOUNDING TUBE REPAIR
200MAIN PROPULSION
201MAIN EXHAUST RESILIENT MOUNTS REPLACEMENT
202STARBOARD MDE PTO CLUTCH COUPLING INSPECTION
203MAIN ENGINE PARTS OVERHAUL
204MAIN REDUCTION GEAR INSPECTION
205MAIN ENGINE FUEL INJECTORS(23) OVERHAUL
206OVERHAUL MAIN ENGINE TURBOCHARGERS
207PORT AND STBD MAIN ENGINE CLUTCH & COUPLING
208PROPULSION SHAFT BRAKE OVERHAUL
210ME INTERCOOLER CLEANING
300ELECTRICAL
301ANNUAL SWITCHBOARD CLEANING
302ANNUAL GENERATOR INSPECTION
303GROUP CONTROL CENTER & MOTOR CONTROLLERS
304VARIOUS MOTORS OVER HAUL
305ANNUAL PTO CONTROLS GROOM
306CARGO CONSOLE REPAIR & GROOM
307CIRCUIT BREAKERS SERVICING AND REPAIRS
400COMMUNIC ATION & NAV AIDS
410ANNUAL RADIO COMMUNCATION EQUIPMENT RECERTIFICATION
451ANNUAL RADAR SERVICE
452ANNUAL ECDIS SERVICE
453ANNUAL GYRO SERVICE
454ANNUAL VDR RECERTIFICATION
457EPIRB SERVICE (5 Yr)
458WHIP ANTENNA MAINTENANCE
459ECHO SOUNDER SERVICE
500AUXILIARY MACHINERY
502CT WINCH FAIRLEAD OVERHAUL
504CLEAN AND PAINT MSD TANKS
505SEACHEST VENT PIPE
508FRESH WATER AND CONTAMINATED DRAIN TANK REPAIRS
509PRESSURE VESSELS AND RELIEF VALVE TESTING
510AUX BOILER MAINTENANCE AND INSPECTION - VAPOR
512VACUUM SEWAGE SYSTEM CLEANING AND REPAIR
513CONEX BOX SERVICE AND PRESERVATION
514PUMP OVERHAULS
515REEFER AC UNITS REPAIR GROOM CSI
517ANNUAL INCINERATOR SERVICE
521PURIFIER MAINTENANCE- WESTFALIA
523FUEL OIL AND LUBE OIL FILTER OVERHAUL
524ER OWS AND CARGO OCM CERTIFICATION
525SHIPS SERVICE AIR COMPRESSOR GROOM
526START AIR COMPRESSOR
527HP AIR COMPRESSOR OVERHAUL
600HABITABILITY
601DECK COVERING REPLACEMENT
602NEW LIFEBOAT INSTALLATION
603SCBA EQUIPMENT ANNUAL SERVICING
604SCBA COMPRESSOR ANNUAL SERVICE
605PORT RESCUE BOAT DAVIT ANNUAL SERVICE
606STBD RESCUE BOAT DAVIT ANNUAL SERVICE
608FIRE FIGHTING EQUIPMENT ANNUAL INSPECTION
609RESCUE BOATS ANNUAL SERVICE
610ANNUAL PERSONAL ELEVATOR RECERTIFICATION
611REINSTALL, WEIGHT TEST PORT AND STBD ACCOMODATION LADDERS
613IMMERSION SUITS ANNUAL SERVICE
614DAVIT ARMS REMOVAL, FALLS RENEWAL, AND WINCH INSPECTIONS
615LIFE RAFT ANNUAL SERVICING
616HALON BOTTLE REBUILD
619FIRE AFFF ANNUAL INSPECTION
620ANNUAL FIRE AND SMOKE DAMPER INSPECTION
800HEATING, VENTILATION, AND AIR CONDITIONING
801CLEANING GALLERY AND SCULLERY VENTILATION SYSTEMS
802CLEANING VENTILATION SYSTEMS
803FOCSLE SUPPLY PLENUM STEEL RENEWAL
900DRYDOCKING AND UNDOCKING
902PROPELLOR SYSTEM MAINTENANCE AND OD BOX GROOM
903PROPELLOR SHAFT WEARDOWN
904STERN TUBE SEAL MAINTENANCE
905SPUR AND LINE CUTTERS REPLACEMENT
906ZINC ANODES REPLACEMENT
907HULL FREEBOARD CLEANING AND PAINTING
908ANCHOR CHAIN LOCKERS
909OVERHAULING SEA VALVES
910CATHODIC PROTECTION SYSTEM
911MARINE GROWTH INHIBITOR ANODES REPLACEMENT
912RUDDER AND STERN EXAMINATION
913BILGE KEEL INSPECTION
960UNDERWATER HULL CLEANING PAINTING SPOT BLAST
966SHAFT ALIGNMENT AND BEARING REACTION CHECKS
1000UNREP EQUIPMENT
1001RAM TENSIONER SHEAVE BLOCK REPAIR
1002DOUBLE PROBE RECEIVER BACK PLATE ASSEMBLY REPAIR
1003HAULING WINCH CONTROL CABLE BRACKET
1004HEAVY SPANWIRE WINCHES AND MOTORS REFURBISHMENT
1005UNREP STATIONS 4 STEEL REPAIRS
1006UNREP STATIONS 8 STEEL REPAIRS
1007CARGO BOOM QUADRENNIAL
TOTAL
&"Times New Roman,Regular"USNS LEROY GRUMMAN (T-AO 195)&"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN
&"Times New Roman,Bold"CATEGORY "A" ITEMS&"Times New Roman,Regular"N3220519R4011

ATTACHMENT J-2

File details come from the government source that posted it. Updated .