CDRL, WI-0003.pdf

PDF 223 KB Posted

Attached to
USNS GUADALUPE FY20 ROH Federal contract opportunity
Solicitation number
N3220520R4005
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a Contract Data Requirements List (CDRL) for the USNS GUADALUPE FY20 ROH solicitation. The CDRL requires the submission of an Approach, Berth, and Mooring Requirements data item describing minimum vessel draft clearances for transit and docking, tidal range information, and approach charts for the contractor's facility. The data item is due upon contract award and must include official sources for tidal data and facility approach charts demonstrating safe transit routes and water depths meeting the minimum clearance requirements specified in the CDRL. The Military Sealift Command is the contracting agency, and the CDRL pricing groups contractors' estimated costs to develop and submit the required data.

View the file

Other files for this federal contract opportunity

Other files attached to USNS GUADALUPE FY20 ROH, newest first.
File Type Posted
Amendment N3220520R4005-0002.docx DOCX document
J-2 Category A Items (REV A).xlsx XLSX spreadsheet
J-3 Category B Items (REV B).xlsx XLSX spreadsheet
Work Item Index (2.23.20).docx DOCX document
J&A Redacted - RFP N3220520R4005.pdf PDF
J-3 Category B Items REV-A.xlsx XLSX spreadsheet
J-10 Interport Differential REV-A.doc DOC document
Amendment N3220520R4005-00001.docx DOCX document
CDRL, WI-0021.pdf PDF
CDRL, WI-0019.pdf PDF
J-14 Technical Non-Disclosure Agreement (NDA).pdf PDF
CDRL, WI-0015.pdf PDF
CDRL, WI-0001.pdf PDF
CDRL, WI-0022.pdf PDF
N3220520R4005.docx DOCX document
CDRL, WI-0024.pdf PDF
J-8 Request For Clarification.pdf PDF
CDRL, WI-0007.pdf PDF
CDRL, WI-0017.pdf PDF
J-9 Disclsr Lobbying Activities SF-LLL.pdf PDF
J-7 MSC Ship Repair Facility Survey.doc DOC document
J-3 Category B Items.xlsx XLSX spreadsheet
CDRL, WI-0023.pdf PDF
CDRL, WI-0010.pdf PDF
CDRL, WI-0020.pdf PDF
J-5 SUB-CONTRACTING PLAN ASSESSMENT CHECKLIST.docx DOCX document
CDRL, WI-0016.pdf PDF
CDRL, WI-0013.pdf PDF
CDRL, WI-0011.pdf PDF
J-10 Interport Differential.doc DOC document
CDRL, WI-0018.pdf PDF
CDRL, WI-0014.pdf PDF
CDRL, WI-0004.pdf PDF
J-11 Dry Dock Eval Form.docx DOCX document
USNS GUADALUPE (T-AO) FY20 ROH-DD GFP List.xlsx XLSX spreadsheet
CDRL, WI-0012.pdf PDF
CDRL, WI-0006.pdf PDF
CDRL, WI-0002.pdf PDF
CDRL, WI-0005.pdf PDF
J-2 Category A Items.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A004
title: APPROACH, BERTH, AND MOORING REQUIREMENTS
sub:
auth:
ref: MSC WI-003
req_ofc: PM1MC1/N10
dd250: LT
appcode: N/A
dist: See Blk 16
freq: ASREQ
asof:
firstsub: ASREQ
subsub: ASREQ
addressee1: ACO
draft1:
reg1: 1
repro1:
addressee2: PPE
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 0
remarks: Abstract:

7.2.3. The following minimum clearances, with respect to vessel draft, shall be maintained to minimize probability of grounding and reduce silt buildup in piping. The datum for charted depth shall be mean lower low water (MLLW) per enclosure 2.2.1. The contractor shall include official NOAA or other regulatory agency information on tidal ranges, periodicity and length of tide ranges, including a discussion on how contractor’s proposed use of tide heights to satisfy transit requirements may affect the shipyard availability arrival/departure times and the complete scope of work:

7.2.3.1. Underway in confined waters (harbors) – 3 feet of charted depth.

7.2.3.2. Underway in inland waters – 2 feet plus squat of charted depth. (Note: Squat values only apply to MSC tanker vessels like the T-AO class ships. T-AO squat tables are available for planning.)

7.2.3.3. Underway in open water – 2 feet plus squat of charted depth. (Note: Squat values only apply to MSC tanker vessels like the T-AO class ships. T-AO squat tables are available for planning.)

7.2.3.4. During dead stick maneuvering (pilot aboard and assisted by tugs) – 2 feet of charted depth.

7.2.3.5. For dry-docking – 12 inches over the high block, sill, or highest projection including the effects of list, trim, and hog/sag.

7.2.3.6. Pierside at a contractor’s (or subcontractor’s) facility – 3 feet of facility sounding survey depth. Tidal ranges shall be included to demonstrate adequate clearance under all conditions.

7.2.5. Contractors must submit with their proposals copies of all the latest NOAA or US Army Corps of Engineers or nationally recognized authority waterway approach charts to their facility. Charts are to show the entire route of transit from the sea buoy to the contractor’s facility, or for proposed inter/intra facility transits. Charts must provide adequate demonstration that the contractor has positively determined the route(s) providing safe vessel transit and adequate water depths to meet the requirements of 7.2.3 above, including applicable tidal ranges.

7.2.6. Contractors must submit an approach chart with their proposals. The approach chart shall be equal to the berthing chart in dimensions and contain the following data:

7.2.6.1. Contractors shall furnish current depth soundings for the approach to the pier and/or dry-dock from the main channel.

7.2.6.2. Soundings must indicate the depths over the full length of the approach, from the point in the navigable channel where the contractor takes delivery of the vessel to the pier and/or drydock at a maximum of one hundred (100) foot intervals. Adequate breadth of sou

group:
total_price:
prep_name:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: X
system:
ctr_no: N32205-20-C-4005
contr: TBD
remarksb:
Page2:
Reset:
2020-01-07T11:37:02-0500
NEWTON.THOMAS.C.1007730183
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .