About this file
This document is an amendment to a solicitation for the USNS GUADALUPE FY20 ROH. The amendment modifies the list of standard work items to be included under Category A and B for the repair, overhaul, and maintenance of the USNS GUADALUPE. Category A items cover work such as deck preservation, tank preservation, engine parts overhaul, generator and electrical system inspections, and life saving equipment servicing. Category B items include physical security, steel replacements, drydocking, and propeller system maintenance. The solicitation is being conducted by the Department of the Navy's Military Sealift Command for the repair and overhaul of the USNS GUADALUPE to be completed in Fiscal Year 2020.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220520R4005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Wis included for this solicitation:
Category “A” Items
| WI # | Title | |
| 001 | Intent, Scope, General Requirements, and Definitions | |
| 002 | Technical and Manufacturer’s Representatives | |
| 003 | Approach, Berth, and Mooring Requirements | |
| 004 | Testing and Quality Assurance | |
| 005 | Electrical Safety Procedures Requirements | |
| 006 | Heavy Weather Plan | |
| 007 | Cold Weather Plan Rev Aug 16 | |
| 010 | Furnish Office for Overhaul Management Team | |
| 011 | Furnish General Services (T-AO) | |
| 012 | Information Technology Services | |
| 013 | Project Planning and Production Status Monitoring Report | |
| 014 | Preparation of Weight and Moment Report | |
| 015 | Integrated Logistics and GFM Support Requirements | |
| 016 | Fire Protection and Ship's Safety Program | |
| 017 | Handling Ship's Stores | |
| 018 | Delivery and Redelivery of Vessel | |
| 019 | Shipboard Access and Security | |
| 020 | Gas Free Certificates | |
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams and Spaces | |
| 022 | Dock Trials and Sea Trials | |
| 023 | Hazardous Waste Disposal at a Contractor's Facility | |
| 024 | Physical Security at Private Contractor's Facility | |
| 101 | NDT Kingposts | |
| 102 | Intermediate Survey | |
| 103 | Deck Preservation | |
| 104 | 05 And 06 Level Bulkheads Repair | |
| 105 | Tank Deck Piping Renewal | |
| 106 | Deck Penetrations Through Pump Room Repair | |
| 107 | Fr. 50-60 Tank Deck Overhead Preservation | |
| 108 | Ladder Preservation Tank Deck | |
| 109 | AFT Ballast Tank Preservation | |
| 110 | Cargo Tank Preservation | |
| 111 | Tank Vent Protective Device | |
| 114 | Stability Test | |
| 115 | Flight Deck Preservation | |
| 116 | Contaminated Fuel Oil Drain Tank Sounding Tube Repair | |
| 201 | Main Exhaust Resilient Mounts Replacement | |
| 202 | Starboard MDE PTO Clutch Coupling Inspection | |
| 203 | Main Engine Parts Overhaul |
Category “A” Items (Continued)
| WI # | Title | |
| 204 | Main Reduction Gear Inspection | |
| 205 | Main Engine Fuel Injectors(23) Overhaul | |
| 206 | Overhaul Main Engine Turbochargers | |
| 207 | Port and STBD Main Engine Clutch & Coupling | |
| 208 | Propulsion Shaft Brake Overhaul | |
| 210 | ME Intercooler Cleaning | |
| 301 | Annual Switchboard Cleaning | |
| 302 | Annual Generator Inspection | |
| 303 | Group Control Center & Motor Controllers | |
| 304 | Various Motors Over Haul | |
| 305 | Annual PTO Controls Groom | |
| 306 | Cargo Console Repair & Groom | |
| 307 | Circuit Breakers Servicing and Repairs | |
| 410 | Annual Radio Communication Equipment Recertification | |
| 451 | Annual Radar Service | |
| 452 | Annual ECDIS Service | |
| 453 | Annual Gyro Service | |
| 454 | Annual VDR Recertification | |
| 457 | EPIRB Service (5 Yr) | |
| 458 | Whip Antenna Maintenance | |
| 459 | Echo Sounder Service | |
| 502 | CT Winch Fairlead Overhaul | |
| 504 | Clean and Paint MSD Tanks | |
| 505 | Seachest Vent Pipe | |
| 508 | Fresh Water and Contaminated Drain Tank Repairs | |
| 509 | Pressure Vessels and Relief Valve Testing | |
| 510 | Aux Boiler Maintenance and Inspection - Vapor | |
| 512 | Vacuum Sewage System Cleaning and Repair | |
| 513 | Conex Box Service and Preservation | |
| 514 | Pump Overhauls | |
| 515 | Reefer Ac Units Repair Groom CSI | |
| 517 | Annual Incinerator Service | |
| 521 | Purifier Maintenance- Westfalia | |
| 523 | Fuel Oil and Lube Oil Filter Overhaul | |
| 524 | ER OWS and Cargo OCM Certification | |
| 525 | Ships Service Air Compressor Groom | |
| 526 | Start Air Compressor | |
| 527 | HP Air Compressor Overhaul | |
| 601 | Deck Covering Replacement | |
| 602 | New Lifeboat Installation | |
| 603 | SCBA Equipment Annual Servicing | |
| 604 | SCBA Compressor Annual Service | |
| 605 | Port Rescue Boat Davit Annual Service | |
| 606 | STBD Rescue Boat Davit Annual Service | |
| 608 | Fire Fighting Equipment Annual Inspection | |
| 609 | Rescue Boats Annual Service | |
| 610 | Annual Personal Elevator Recertification | |
| 611 | Reinstall, Weight Test Port and STBD Accommodation Ladders | |
| 613 | Immersion Suits Annual Service | |
| 614 | Davit Arms Removal, Falls Renewal, and Winch Inspections | |
| 615 | Life Raft Annual Servicing | |
| 616 | Halon Bottle Rebuild | |
| 619 | Fire AFFF Annual Inspection |
Category “A” Items (Continued)
| WI # | Title | |
| 620 | Annual Fire and Smoke Damper Inspection | |
| 801 | Cleaning Gallery and Scullery Ventilation Systems | |
| 802 | Cleaning Ventilation Systems | |
| 803 | Focsle Supply Plenum Steel Renewal | |
| 901 | Dry Docking Undocking Vessel | |
| 902 | Propellor System Maintenance and OD Box Groom | |
| 903 | Propellor Shaft Weardown | |
| 904 | Stern Tube Seal Maintenance | |
| 905 | Spur and Line Cutters Replacement | |
| 906 | Zinc Anodes Replacement | |
| 907 | Hull Freeboard Cleaning and Painting | |
| 908 | Anchor Chain Lockers | |
| 909 | Overhauling Sea Valves | |
| 910 | Cathodic Protection System | |
| 911 | Marine Growth Inhibitor Anodes Replacement | |
| 912 | Rudder and Stern Examination | |
| 913 | Bilge Keel Inspection | |
| 960 | Underwater Hull Cleaning Painting Spot Blast | |
| 966 | Shaft Alignment and Bearing Reaction Checks | |
| 1001 | Ram Tensioner Sheave Block Repair | |
| 1002 | Double Probe Receiver Back Plate Assembly Repair | |
| 1003 | Hauling Winch Control Cable Bracket | |
| 1004 | Heavy Spanwire Winches and Motors Refurbishment | |
| 1005 | Unrep Stations 4 Steel Repairs | |
| 1006 | Unrep Stations 8 Steel Repairs | |
| 1007 | Cargo Boom Quadrennial |
Category “B” Items
| WI # | Title | |
| 0025 | Physical Security at Private Contractor’s Facility | |
| 0030 | Continuation of Services | |
| 112 | Steel Replacement | |
| 113 | Miscellaneous Piping Replace | |
| 901 | Drydock and Undocking the Vessel | |
| 914 | Pintle Bearings |