This document is a solicitation for the operation and maintenance of a High Speed Transport vessel for the Department of the Navy Military Sealift Command. The solicitation number is N32205-20-R-3004 and seeks maintenance services for the USNS GUAM (HST-1) to be performed worldwide. The services required include operation and maintenance of the vessel. The response due date and anticipated award date are not specified. Pricing terms, set asides, and incumbent information are also not included in the solicitation description provided.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL MANUAL
FOR
[SGML VERSION; SEE RECORD OF
REVISIONS ]
DAMAGE CONTROL AND
FIREFIGHTING
EQUIPMENT LAYOUT
BOOK
DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES ONLY; ADMINISTRATIVE OR OPERATIONAL USE; 16 OCT 2007. OTHER
REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE NAVAL SEA SYS-
TEMS COMMAND (SEA-09T).
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC 2751, ET
SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,
U.S.C., APP 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO
SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS
OF DOD DIRECTIVE 5230.25(D).
DESTRUCTION NOTICE: DESTROY BY ANY METHOD THAT WILL PREVENT DISCLO-
SURE OF CONTENTS OR RECONSTRUCTION OF THIS DOCUMENT.
THIS PUBLICATION SUPERSEDES SS100-AG-MAN-010, DATED 1 NOV 1995 AND ALL
CHANGES THERETO.
SS100-AG-MAN-010
0910-LP-106-9842 REVISION 1
TITLE-1 / (TITLE-2 Blank)@@FIpgtype@@TITLE@@!FIpgtype@@ @@FIpgtype@@TITLE@@!FIpgtype@@
PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND
16 OCT 2007
TITLE-2
@@FIpgtype@@BLANK@@!FIpgtype@@
RECORD OF REVISIONS
REVISION
NO. DATE TITLE AND/OR BRIEF DESCRIPTION/PREPARING ACTIVITY
1 16 OCTOBER
REVISION 1 IS DOCUMENTED FOR THE CONVERSION TO ELECTRONIC
TECHNICAL MANUAL.
NOTE
THIS TECHNICAL MANUAL (TM) HAS BEEN DEVELOPED FROM AN INTELLIGENT ELECTRONIC
SOURCE KNOWN AS STANDARD GENERALIZED MARKUP LANGUAGE (SGML). THERE IS NO LOEP.
ALL CHANGES, IF APPLICABLE, ARE INCLUDED. THE PAGINATION IN THIS TM WILL NOT MATCH THE PAGINATION OF THE ORIGINAL PAPER TM; HOWEVER, THE CONTENT IS EXACTLY THE SAME.
ANY CHANGES RECEIVED AFTER RECEIPT OF THIS TM WILL ONLY FIT IN THIS PAGINATED VERSION.
SS100-AG-MAN-010
RECORD OF REVISIONS-1 / (RECORD OF REVISIONS-2 Blank)
RECORD OF REVISIONS-2
FOREWORD
This Damage Control/Firefighting Equipment Layout Book was prepared by the Naval Sea Systems Com-mand at the request of damage control fleet personnel to improve the knowledge of the shipboard damage con-trol organization in damage control/firefighting equipment layout and usage.
The illustrated layouts in this booklet quickly convey the ways to rapidly set up equipment for the func-tions of access, dewatering, desmoking, shoring, hull repair, pipe patching, personnel protection, and firefighting.
The layouts presented in this book provide shipboard repair party personnel with effective ways of utiliz-ing damage control repair station equipment when combating casualties involving flooding, smoke, and fire.
This book can be used to assist shipboard personnel in training or in actual emergencies to identify equip-ment setups. The included sketches will illustrate the equipment’s intended use so that repair party personnel can gather the proper equipment and arrange the layout as required.
The Damage Control/Firefighting Equipment Layout Book is dedicated with appreciation to all the per-sonnel who have assisted in research, testing, validating and allowing us to draw on their years of fleet experi-ence and knowledge.
Recommendations for improvements and additional sketches to this document are welcome. Please for-ward comments or suggestions related to this book using the form in the back to:
Commander, Naval Sea Systems Command
Hank Kuzma (03G1)
2531 Jefferson Davis Hwy
Arlington, VA 22242-5160
Commercial phone: (703) 602-9295, ext 221
DSN 332-9295, ext 221
FAX (703) 602-3118
Ships, training activities, supply points, depots, Naval Shipyards and Supervisors of Shipbuilding are requested to arrange for the maximum practical use and evaluation of NAVSEA technical manuals. All errors, omissions, discrepancies and suggestions for improvement to NAVSEA technical manuals shall be forwarded to:
COMMANDER,
CODE 310 TMDER, BLDG 1388
NAVSURFWARCENDIV NSDSA
4363 MISSILE WAY
PORT HUENEME CA 93043-4307
on NAVSEA/SPAWAR Technical Manual Deficiency/Evaluation Report (TMDER), NAVSEA form 4160/1. All feedback comments shall be thoroughly investigated and originators will be advised of action resulting therefrom.
One copy of NAVSEA form 4160/1 is at the end of each separately bound technical manual 8-1/2 x 11 inches or larger. Copies of NAVSEA form 4160/1 may be requisitioned from the Naval Systems Data Support Activity Code 310 at the above address. Users are encouraged to transmit deficiency submittals via the Naval Systems Data Support Activity web site located at:
https://nsdsa2.phdnswc.navy.mil/tmder/tmder-generate.asp?lvl=1
FOREWORD-1
FOREWORD - Continued
Individual electronic TMs do not contain NAVSEA form 4160/1 but are linked to an electronic version on the resident CD-ROM. Therefore, we encourage the user to transmit deficiency submittals via the Naval Systems Data Support Activity web site located above.
FOREWORD-2
TABLE OF CONTENTS
Chapter/Paragraph Page
1 ACCESS EVOLUTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
2 CASUALTY POWER SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
3 DESMOKING EVOLUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
4 DEWATERING EVOLUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
5 EMERGENCY COMMUNICATIONS EVOLUTIONS . . . . . . . . . . . . . . . 5-1
6 EMERGENCY LIGHTING EVOLUTIONS . . . . . . . . . . . . . . . . . . . . . 6-1
7 FIREHOSES/FITTINGS EVOLUTION . . . . . . . . . . . . . . . . . . . . . . . . 7-1
8 FIREFIGHTING EVOLUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1
9 NAVAL FIREFIGHTERS’ THERMAL IMAGER . . . . . . . . . . . . . . . . . . 9-1
10 PATCHING/PLUGGING EVOLUTION . . . . . . . . . . . . . . . . . . . . . . . . 10-1
11 PIPE PATCHING EVOLUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1
12 REPAIR PARTY PERSONNEL PROTECTIVE CLOTHING . . . . . . . . . . . 12-1
13 SHORING EVOLUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1
14 SYSTEM RESTORE/RECONFIGURE EVOLUTION . . . . . . . . . . . . . . . 14-1
15 COMPLEX DAMAGE CONTROL EVOLUTION . . . . . . . . . . . . . . . . . . 15-1
i
LIST OF TABLES
Table Title Page ii
LIST OF ILLUSTRATIONS
Figure Title Page
1-1. Portable Exothermic Cutting Unit (PECU) Equipment . . . . . . . . . . . . . . . . . 1-2
1-2. Portable Exothermic Cutting Unit (PECU) - Gaining Access to Damaged Compartments Using PECU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1-3. Portable Hydraulic Access and Rescue System (PHARS) Equipment . . . . . . . . . 1-4
1-4. Portable Hydraulic Access and Rescue System (PHARS) . . . . . . . . . . . . . . . 1-5
1-5. Portable Hydraulic Access and Rescue System (PHARS) . . . . . . . . . . . . . . . 1-6
1-6. PHARS - Gaining Access through Watertight Door with Hydraulic Spreader . . . . . 1-7
1-7. Portable Hydraulic Access and Rescue System (PHARS) . . . . . . . . . . . . . . . 1-8
1-8. Rescue and Patient Transportation Devices . . . . . . . . . . . . . . . . . . . . . . . 1-9
1-9. One Man Moving A Casualty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10
1-10. Two-Man Carries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11
1-11. Cardiopulmonary Resuscitation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12
1-12. Preparing a Victim for Helicopter Evacuation . . . . . . . . . . . . . . . . . . . . . . 1-13
1-13. Example of Hoisting Equipment Using a Bowline and a Clove Hitch . . . . . . . . . 1-14
1-14. Bowline Knot - A Good Knot for Forming a Loop That Will Not Slip Under Strain and It May Be Easily Untied . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15
1-15. Clove Hitch Knot - Used for Attaching a Rope to an Object Such as a Pole, Post, or Hose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16
1-16. Clove Hitch - Tying the Clove Hitch around an Object . . . . . . . . . . . . . . . . . 1-17
1-17. Becket or Sheet Bend Knot - Used for Joining Two Ropes (Well-Suited for Joining Ropes of Unequal Diameters) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18
1-18. Water Knot - Used for Joining Two Strips of Canvas or Rope . . . . . . . . . . . . . 1-19
1-19. Mariners Knot - a Knot System That Can Be Released under Load . . . . . . . . . . 1-20
2-1. Bulkhead Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
2-2. Supply Power to Equipment Designated to Receive Casualty Power . . . . . . . . . 2-3
2-3. Casualty Power Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
3-1. Desmoking Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2
3-2. Smoke Curtain Set-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3
3-3. Smoke Blanket Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 iii
LIST OF ILLUSTRATIONS - Continued
3-4. Using Box Fan(s) Set in Watertight Door With Smoke Curtain . . . . . . . . . . . . 3-5
3-5. Using Box Fan Hung Across Watertight Door With Smoke Curtain . . . . . . . . . . 3-6
3-6. Using Two Fans Hung From Top of Watertight Door with Smoke Curtain . . . . . . 3-7
3-7. Optimum Placement of Desmoking Fans from Door (Seal Door Using Fan’s Air) . . 3-8
3-8. Desmoking with Water Driven Fan Placed Adjacent to Smoke Filled Compartment . 3-9
3-9. Using Water Driven Fan Placed Adjacent to Smoke Filled Compartment and Vent Duct Exhausting through Scuttle to Weather Deck . . . . . . . . . . . . . . . . . . 3-10
3-10. Desmoking with Water Driven Fan Placed Adjacent to Smoke Filled Compartment . 3-11
3-11. Using Water Driven Fan Placed on Weather Deck or Below Adjacent to Smoked Compartment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12
3-12. Using Red Devil Blower Placed on Weather Deck or Below Adjacent to Smoked Compartment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13
3-13. Using Water Driven Fan To Desmoke Compartment with Box Fan on Scuttle . . . . 3-14
3-14. Using Water Driven Fan To Desmoke Compartment with Box Fan on Hatch . . . . 3-15
3-15. Using Red Devil Blower Placed on Weather Deck . . . . . . . . . . . . . . . . . . . 3-16
3-16. Showing Portable Suction Duct Through the Smoke Curtain Located in Door Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17
3-17. Desmoking from Weather Deck or Clear Space with Water Driven Fan Actuated by P250 Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18
3-18. Desmoking from Weather Deck or Clear Space with Water Driven Fan Actuated by P100 Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-19
3-19. Using Electric Subpump Supplying Water to Water Driven Fan and to 1-1/2″ Firehose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20
3-20. Negative Pressure Ventilation Explanation . . . . . . . . . . . . . . . . . . . . . . . . 3-21
3-21. Using Combinations of Box Fans in Negative Pressure (Sheet 1 of 2) . . . . . . . . 3-22
3-21. Using Combinations of Box Fans in Negative Pressure (Sheet 2 of 2) . . . . . . . . 3-23
3-22. Desmoking Passageway Through Vent Trunk Using Box Fans in Negative Pressure . 3-24
4-1. Dewatering Equipment (Sheet 1 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-1. Dewatering Equipment (Sheet 2 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4-1. Dewatering Equipment (Sheet 3 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 iv
4-2. Using 1-1/2″ Eductor with or without Strainer . . . . . . . . . . . . . . . . . . . . . 4-5
4-3. Using 2-1/2″ Eductor or Peri Jet with or without Foot Valve Actuating from 2-1/2″ Fireplug or P100 or P250 Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6
4-4. Suction Lifts Under 20 Feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7
4-5. Suction Lifts Under 20 Feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8
4-6. Using 1-1/2″ Eductor and Peri Jet Eductor for Lift Over 20 Feet . . . . . . . . . . . 4-9
4-7. Using 1-1/2″ Eductor and Peri Jet Eductor for Lift Over 20 Feet . . . . . . . . . . . 4-10
4-8. Using P250 Pump and Eductor Pumping Contaminated Space . . . . . . . . . . . . . 4-11
4-9. Using P100 Pump and Eductor Pumping Contaminated Space . . . . . . . . . . . . . 4-12
4-10. Using 1-1/2″ Eductor Connected to a Standpipe . . . . . . . . . . . . . . . . . . . . . 4-13
4-11. Using Peri Jet Eductor and 1-1/2″ Fireplug . . . . . . . . . . . . . . . . . . . . . . . 4-14
4-12. Using P100 to Actuate Both the 1-1/2″ Eductor and the Foot Valve Strainer . . . . . 4-15
4-13. Using Both Peri Jet Eductor and 1-1/2″ Eductor . . . . . . . . . . . . . . . . . . . . 4-16
4-14. Using Peri Jet Eductor Supplied by 2-1/2″ and 1-1/2″ Hoses (Increased Capacity 20%) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-17
4-15. 20 Foot Suction Lift Using Three P100 Pumps in Tandem . . . . . . . . . . . . . . . 4-18
4-16. Using Darley Pump and 1-1/2″ Eductor . . . . . . . . . . . . . . . . . . . . . . . . . 4-19
4-17. Using Submersible Pumps Single or in Tandem . . . . . . . . . . . . . . . . . . . . . 4-20
4-18. Using Submersible Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-21
4-19. Using Electric Subpump to Provide Actuating Water to Peri Jet Eductor . . . . . . . 4-22
7-1. Operating Positions for Navy 1-1/2″ Vari-Nozzles . . . . . . . . . . . . . . . . . . . 7-2
7-2. Using Nozzle Tip and Applicator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3
7-3. Operating Positions for Navy All-Purpose 1-1/2″ Nozzles Used at High Velocity . . 7-4
7-4. Navy All-Purpose 1-1/2″ Nozzles with Applicators . . . . . . . . . . . . . . . . . . . 7-5
7-5. Spanner Wrenches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6
7-6. Preparing Firehose for Stowage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7
7-7. Replacing Ruptured Fire Hose Using 2-1/2″ Hose Clamp . . . . . . . . . . . . . . . 7-8
8-1. Using Portable AFFF (In-Line) Eductor/Firemain . . . . . . . . . . . . . . . . . . . . 8-2 v
8-2. Using NAP Nozzle and 4 Foot Applicator . . . . . . . . . . . . . . . . . . . . . . . . 8-3
8-3. Using P250 Pump and In-Line Eductor . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
8-4. Using P100 Pump and In-Line Eductor . . . . . . . . . . . . . . . . . . . . . . . . . 8-5
8-5. Using P250 Pump and Various Applicators . . . . . . . . . . . . . . . . . . . . . . . 8-6
8-6. Using P100 Pump and A 4 FT’ Applicator . . . . . . . . . . . . . . . . . . . . . . . . 8-7
8-7. Using P250 Pump Taking Suction from Overboard or Flooded Compartment . . . . 8-8
8-8. Using P100 Pump Taking Suction from Overboard or Flooded Compartment . . . . 8-9
8-9. Replacing Ruptured Firehose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10
8-10. Vertical Trunk Hose Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11
8-11. Using Portable AFFF (In-Line) Eductor . . . . . . . . . . . . . . . . . . . . . . . . . 8-12
8-12. Hose Line and Nozzle Handling Methods (Sheet 1 of 2) . . . . . . . . . . . . . . . . 8-13
8-12. Hose Line and Nozzle Handling Methods (Sheet 2 of 2) . . . . . . . . . . . . . . . . 8-14
8-13. Fire Attack - Direct Attack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-15
8-14. Fire Attack - Attack from an Access . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-16
8-15. Fire Attack - Direct Attack with Vent to Weather . . . . . . . . . . . . . . . . . . . . 8-17
8-16. Indirect Attack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-18
8-17. Indirect Attack with Venting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-19
9-1. Allowing Sight through Dense Smoke and Light Steam to Locate Seat of Fire, in Overhaul Operations and for Search and Rescue of Personnel . . . . . . . . . . . 9-2
9-2. Typical Operating Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3
10-1. Use of Wooden Plugs and Wedges in Filling Holes . . . . . . . . . . . . . . . . . . . 10-2
10-2. Plugging with Mattresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3
10-3. Box Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4
10-4. Hinged Plate Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-5
10-5. Securing Patch with Hook Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-6
10-6. Folding T-Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-7
10-7. Plate Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-8 vi
10-8. Bucket Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-9
10-9. Patching and Sealing Crack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-10
10-10. Caulking Thin Plating and Torn Seams . . . . . . . . . . . . . . . . . . . . . . . . . . 10-11
10-11. Cloth Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-12
10-12. Emergency Leak Plugging Using Flange Clamp . . . . . . . . . . . . . . . . . . . . . 10-13
11-1. Pipe Patching Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-2
11-2. Band-It Patch Isolated Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3
11-3. Band-It Patch on Pressurized Pipe (Sheet 1 of 2) . . . . . . . . . . . . . . . . . . . . 11-4
11-3. Band-It Patch on Pressurized Pipe (Sheet 2 of 2) . . . . . . . . . . . . . . . . . . . . 11-5
11-4. Metal Banding Procedures for Band-It Patch (Sheet 1 of 2) . . . . . . . . . . . . . . 11-6
11-4. Metal Banding Procedures for Band-It Patch (Sheet 2 of 2) . . . . . . . . . . . . . . 11-7
11-5. Emergency Water Activated Repair Patch (EWARP) . . . . . . . . . . . . . . . . . . 11-8
11-6. Jubilee Pipe Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-9
11-7. Soft Patch on Low-Pressure Pipe Line . . . . . . . . . . . . . . . . . . . . . . . . . . 11-10
11-8. Clamp Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-11
11-9. Flange Pipe Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-12
11-10. Simple Pipe Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-13
11-11. Elbow Pipe Patch Using Plastic Pipe Patching Kit . . . . . . . . . . . . . . . . . . . 11-14
11-12. Severed Pipe Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-15
11-13. Compound Pipe Patch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-16
12-1. Firefighter’s Ensemble and Oxygen Breathing Apparatus (OBA) . . . . . . . . . . . 12-2
12-2. Repair Party Outfit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3
12-3. Aircraft Fire Fighting and Chemical, Biological & Radiological (CBR) Protective Clothing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4
13-1. Measuring Length and Angle of Shore Using Measuring Batten . . . . . . . . . . . . 13-2
13-2. Measuring and Cutting Shores Using Folding Rule or Steel Tape and Carpenter’s Square . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-3
13-3. I-Type Shoring Using 3-5 Ft. or 6-11 Ft. Metal Shore . . . . . . . . . . . . . . . . . 13-4 vii
13-4. I and K-Type Shoring Using Wooden and Adjustable 6-11 Ft. Metal Shores . . . . . 13-5
13-5. I and K-Type Shoring Using Adjustable 3-5 Ft and 6-11 Ft Metal Shores . . . . . . 13-6
13-6. I-Type Shoring as Erected in Passage on USS SAMUEL B. ROBERTS (FFG 58) . . 13-7
13-7. Shoring Split Seam After Bulkhead of Auxiliary Machinery Room on USS SAMUEL B. ROBERTS (FFG 58) . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8
13-8. K-Type Shoring Forward Bulkhead in CMBD SPLY DEPT STRM Room USS SAMUEL B. ROBERTS (FFG 58) . . . . . . . . . . . . . . . . . . . . . . . . . . 13-9
13-9. H-Type Shoring with Wooden Shores . . . . . . . . . . . . . . . . . . . . . . . . . . 13-10
13-10. I-Type Shoring Using Wooden Shore to Support Sagging Overhead . . . . . . . . . . 13-11
13-11. I-Type Shoring Using Multiple Combination of 6-11 Ft. Metal Shores and Wooden Shore to Support Overhead Deck or Load . . . . . . . . . . . . . . . . . . . . . . 13-12
13-12. I-Type Shoring on Watertight Door Using Wooden Shores . . . . . . . . . . . . . . . 13-13
13-13. I-Type Shoring on Watertight Door Using Metal Shores . . . . . . . . . . . . . . . . 13-14
13-14. I-Type Shoring on Hatch with Scuttle Using Wooden Shores . . . . . . . . . . . . . 13-15
13-15. I-Type Shoring on Hatch with Scuttle Using Metal Shores . . . . . . . . . . . . . . . 13-16
13-16. K-Type Shoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-17
13-17. K-Type Shoring on Watertight Door Using Wooden Shores . . . . . . . . . . . . . . 13-18
13-18. K-Type Shoring on Watertight Door Using Metal Shores . . . . . . . . . . . . . . . . 13-19
13-19. Distributing Bulkhead Pressure over Stiffeners with K-Type Shoring (Using Wooden or/and Metal Shores) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-20
13-20. Compound Shoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-21
13-21. Shoring from Bulkhead to Hatch and Providing Support for Weakened Overhead . . 13-22
13-22. General Rules for Shoring Against Horizontal Pressure . . . . . . . . . . . . . . . . . 13-23
13-23. General Rules for Setting Correct Shoring Angles . . . . . . . . . . . . . . . . . . . 13-24
13-24. Strengthening Shores . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-25
14-1. Providing Temporary Firemain Service Using Firehose Bypassing Damaged Firemain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2
14-2. Providing Temporary Firemain Service by Hose Jumping at Flanges . . . . . . . . . 14-3
15-1. Dewatering and Desmoking Using Electric Sub Pump Discharge Actuating Water Driven Fan and 1-1/2″ Eductor . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-2 viii
15-2. Dewatering and Desmoking Using Water Driven Fan and P250 Pump Taking Suction from Flooded Compartment . . . . . . . . . . . . . . . . . . . . . . . . . . 15-3
15-3. Dewatering and Desmoking Using Water Driven Fan and P100 Pump Taking Suction from Flooded Compartment . . . . . . . . . . . . . . . . . . . . . . . . . . 15-4 ix / (x Blank) x
CHAPTER 1
ACCESS EVOLUTIONS
FIGURE NO. TITLE OF SKETCH
1-1 Portable Exothermic Cutting Unit (PECU) Equipment - Arcair 1-2 Portable Exothermic Cutting Unit (PECU) - Gaining Access to Damaged Compartments Using PECU 1-3 Portable Hydraulic Access and Rescue System (PHARS) - Hurst Equipment 1-4 Portable Hydraulic Access and Rescue System (PHARS) 1-5 Portable Hydraulic Access and Rescue System (PHARS) 1-6 PHARS - Gaining Access through Watertight Door with Hydraulic Spreader 1-7 Portable Hydraulic Access and Rescue System (PHARS) - Use of Hydraulic Cutter and Extension Ram 1-8 Rescue and Patient Transportation Devices 1-9 One Man Moving a Casualty 1-10 Two-Man Carries 1-11 Cardiopulmonary Resuscitation 1-12 Preparing a Victim for Helicopter Evacuation 1-13 Example of Hoisting Equipment Using a Bowline and a Clove Hitch 1-14 Bowline Knot - A good Knot for Forming a Loop That Will Not Slip Under Strain and It May Be Eas-ily Untied 1-15 Clove Hitch Knot - Used for Attaching a Rope to an Object Such as a Pole, Post or Hose 1-16 Clove Hitch - Tying the Clove Hitch around an Object 1-17 Becket or Sheet Bend Knot - Used for Joining Two Ropes (Well-Suited for Joining Ropes of Unequal
Diameters) 1-18 Water Knot - Used for Joining Two Strips of Canvas or Rope 1-19 Mariners Knot - a Knot System That Can Be Released under Load
1.
1-1
1.
Figure 1-1. Portable Exothermic Cutting Unit (PECU) Equipment
SS100-A
G
-M A
N -010
1-2
Figure 1-2. Portable Exothermic Cutting Unit (PECU) - Gaining Access to Damaged Compartments Using PECU
SS100-A
G
-M A
N
1-3
Figure 1-3. Portable Hydraulic Access and Rescue System (PHARS) Equipment
SS100-A
G
-M A
N
1-4
Figure 1-4. Portable Hydraulic Access and Rescue System (PHARS)
SS100-A
G
-M A
N
1-5
Figure 1-5. Portable Hydraulic Access and Rescue System (PHARS)
SS100-A
G
-M A
N
1-6
Figure 1-6. PHARS - Gaining Access through Watertight Door with Hydraulic Spreader
SS100-A
G
-M A
N
1-7
Figure 1-7. Portable Hydraulic Access and Rescue System (PHARS)
SS100-A
G
-M A
N
1-8
Figure 1-8. Rescue and Patient Transportation Devices
SS100-A
G
-M A
N
1-9
Figure 1-9. One Man Moving A Casualty
SS100-A
G
-M A
N
1-10
Figure 1-10. Two-Man Carries
SS100-A
G
-M A
N
1-11
Figure 1-11. Cardiopulmonary Resuscitation
SS100-A
G
-M A
N
1-12
Figure 1-12. Preparing a Victim for Helicopter Evacuation
SS100-A
G
-M A
N
1-13
Figure 1-13. Example of Hoisting Equipment Using a Bowline and a Clove Hitch
SS100-A
G
-M A
N
1-14
Figure 1-14. Bowline Knot - A Good Knot for Forming a Loop That Will Not Slip Under Strain and It May Be Easily Untied
SS100-A
G
-M A
N
1-15
Figure 1-15. Clove Hitch Knot - Used for Attaching a Rope to an Object Such as a Pole, Post, or Hose
SS100-A
G
-M A
N
1-16
Figure 1-16. Clove Hitch - Tying the Clove Hitch around an Object
SS100-A
G
-M A
N
1-17
Figure 1-17. Becket or Sheet Bend Knot - Used for Joining Two Ropes (Well-Suited for Joining Ropes of Unequal Diameters)
SS100-A
G
-M A
N
1-18
Figure 1-18. Water Knot - Used for Joining Two Strips of Canvas or Rope
SS100-A
G
-M A
N
1-19
Figure 1-19. Mariners Knot - a Knot System That Can Be Released under Load
G
-M A
N
1-20
CHAPTER 2
CASUALTY POWER SYSTEM
FIGURE NO. TITLE OF SKETCH
2-1 Bulkhead Terminal 2-2 Supply Power to Equipment Designated to Receive Casualty Power 2-3 Casualty Power Run
1.
2-1
Figure 2-1. Bulkhead Terminal
SS100-A
G
-M A
N
2-2
Figure 2-2. Supply Power to Equipment Designated to Receive Casualty Power
G
-M A
N
2-3
Figure 2-3. Casualty Power Run
G
-M A
N
2-4
CHAPTER 3
DESMOKING EVOLUTION
FIGURE NO. TITLE OF SKETCH
3-1 Desmokinq Equipment 3-2 Smoke Curtain Set-Up 3-3 Smoke Blanket Set-Up 3-4 Using Box Fan(s) Set in Watertight Door With Smoke Curtain 3-5 Using Box Fan Hung Across Watertight Door With Smoke Curtain 3-6 Using Two Fans Hung From Top of Watertight Door With Smoke Curtain 3-7 Optimum Placement of Desmoking Fans from Door (Seal Door Using Fan’s Air) 3-8 Desmokinq with Water Driven Fan Placed Adjacent to Smoked Filled Compartment 3-9 Using Water Driven Fan Placed Adjacent to Smoke Filled Compartment and Vent Duct Exhausting through Scuttle to Weather Deck 3-10 Desmoking with Water Driven Fan Placed Adjacent to Smoke Filled Compartment 3-11 Using Water Driven Fan Placed on Weather Deck or Below Adjacent to Smoked Compartment 3-12 Using Red Devil Blower Placed on Weather Deck or Below Adjacent to Smoked Compartment 3-13 Using Water Driven Fan To Desmoke Compartment with Box Fan on Scuttle 3-14 Using Water Driven Fan To Desmoke Compartment with Box Fan on Hatch 3-15 Using Red Devil Blower Placed on Weather Deck 3-16 Showing Portable Suction Duct Through the Smoke Curtain Located in Door Frame 3-17 Desmoking from Weather Deck or Clear Space with Water Driven Fan Actuated by P250 Pump 3-18 Desmoking from Weather Deck or Clear Space with Water Driven Fan Actuated by P100 Pump 3-19 Using Electric Subpump Supplying Water Driven Fan and to 1-1/2″ Firehose 3-20 Negative Pressure Ventilation Explanation 3-21 Using Combinations of Box Fans in Negative Pressure 3-22 Desmoking Passageway Through Vent Trunk Using Box Fans in Negative Pressure
1.
3-1
Figure 3-1. Desmoking Equipment
SS100-A
G
-M A
N
3-2
Figure 3-2. Smoke Curtain Set-Up
SS100-A
G
-M A
N
3-3
Figure 3-3. Smoke Blanket Set-up
SS100-A
G
-M A
N
3-4
Figure 3-4. Using Box Fan(s) Set in Watertight Door With Smoke Curtain
SS100-A
G
-M A
N
3-5
Figure 3-5. Using Box Fan Hung Across Watertight Door With Smoke Curtain
SS100-A
G
-M A
N
3-6
Figure 3-6. Using Two Fans Hung From Top of Watertight Door with Smoke Curtain
SS100-A
G
-M A
N
3-7
Figure 3-7. Optimum Placement of Desmoking Fans from Door (Seal Door Using Fan’s Air)
SS100-A
G
-M A
N
3-8
Figure 3-8. Desmoking with Water Driven Fan Placed Adjacent to Smoke Filled Compartment
SS100-A
G
-M A
N
3-9
Figure 3-9. Using Water Driven Fan Placed Adjacent to Smoke Filled Compartment and Vent Duct Exhausting through Scuttle to Weather Deck
SS100-A
G
-M A
N
3-10
Figure 3-10. Desmoking with Water Driven Fan Placed Adjacent to Smoke Filled Compartment
SS100-A
G
-M A
N
3-11
Figure 3-11. Using Water Driven Fan Placed on Weather Deck or Below Adjacent to Smoked Compartment
SS100-A
G
-M A
N
3-12
Figure 3-12. Using Red Devil Blower Placed on Weather Deck or Below Adjacent to Smoked Compartment
SS100-A
G
-M A
N
3-13
Figure 3-13. Using Water Driven Fan To Desmoke Compartment with Box Fan on Scuttle
SS100-A
G
-M A
N
3-14
Figure 3-14. Using Water Driven Fan To Desmoke Compartment with Box Fan on Hatch
SS100-A
G
-M A
N
3-15
Figure 3-15. Using Red Devil Blower Placed on Weather Deck
SS100-A
G
-M A
N
3-16
Figure 3-16. Showing Portable Suction Duct Through the Smoke Curtain Located in Door Frame
SS100-A
G
-M A
N
3-17
Figure 3-17. Desmoking from Weather Deck or Clear Space with Water Driven Fan Actuated by P250 Pump
SS100-A
G
-M A
N
3-18
Figure 3-18. Desmoking from Weather Deck or Clear Space with Water Driven Fan Actuated by P100 Pump
SS100-A
G
-M A
N
3-19
Figure 3-19. Using Electric Subpump Supplying Water to Water Driven Fan and to 1-1/2″ Firehose
SS100-A
G
-M A
N
3-20
Figure 3-20. Negative Pressure Ventilation Explanation
SS100-A
G
-M A
N
3-21
Figure 3-21. Using Combinations of Box Fans in Negative Pressure (Sheet 1 of 2)
SS100-A
G
-M A
N
3-22
Figure 3-21. Using Combinations of Box Fans in Negative Pressure (Sheet 2 of 2)
G
-M A
N
3-23
Figure 3-22. Desmoking Passageway Through Vent Trunk Using Box Fans in Negative Pressure
G
-M A
N
3-24
CHAPTER 4
DEWATERING EVOLUTION
FIGURE NO. TITLE OF SKETCH
4-1 Dewatering Equipment (Sheets 1, 2 and 3) 4-2 Using 1-1/2″ Eductor with or without Strainer 4-3 Using 2-1/2″ Eductor or Peri Jet with or without Foot Valve Actuating from 2-1/2″ Fireplug or P100 or
P250 Pump 4-4 Suction Lifts Under 20 Feet 4-5 Suction Lifts Under 20 Feet 4-6 Using 1-1/2″ Eductor and Peri Jet Eductor for Lift Over 20 Feet 4-7 Using 1-1/2″ Eductor and Peri Jet Eductor for Lift Over 20 Feet 4-8 Using P250 Pump and Eductor Pumping Contaminated Space 4-9 Using P100 Pump and Eductor Pumping Contaminated Space 4-10 Using 1-1/2″ Eductor Connected to a Standpipe 4-11 Using Peri Jet Eductor and 1-1/2″ Fireplug 4-12 Using P100 to Actuate both the 1-1/2″ Eductor and the Foot Valve Strainer 4-13 Using Both Peri Jet Eductor and 1-1/2″ Eductor 4-14 Using Peri Jet Eductor Supplied by 2-1/2″ and 1-1/2″ Hoses (Increased Capacity 20%) 4-15 20 Foot Suction Lift Using Three P100 Pumps in Tandem 4-16 Using Darley Pump and 1-1/2″ Eductor v17 Using Submersible Pumps Single or in Tandem 4-18 Using Submersible Pump 4-19 Using Electric Subpump to Provide Actuating Water to Peri Jet Eductor
1.
4-1
Figure 4-1. Dewatering Equipment (Sheet 1 of 3)
SS100-A
G
-M A
N
4-2
Figure 4-1. Dewatering Equipment (Sheet 2 of 3)
SS100-A
G
-M A
N
4-3
Figure 4-1. Dewatering Equipment (Sheet 3 of 3)
SS100-A
G
-M A
N
4-4
Figure 4-2. Using 1-1/2″ Eductor with or without Strainer
SS100-A
G
-M A
N
4-5
Figure 4-3. Using 2-1/2″ Eductor or Peri Jet with or without Foot Valve Actuating from 2-1/2″ Fireplug or P100 or P250 Pump
SS100-A
G
-M A
N
4-6
Figure 4-4. Suction Lifts Under 20 Feet
SS100-A
G
-M A
N
4-7
Figure 4-5. Suction Lifts Under 20 Feet
SS100-A
G
-M A
N
4-8
Figure 4-6. Using 1-1/2″ Eductor and Peri Jet Eductor for Lift Over 20 Feet
SS100-A
G
-M A
N
4-9
Figure 4-7. Using 1-1/2″ Eductor and Peri Jet Eductor for Lift Over 20 Feet
SS100-A
G
-M A
N
4-10
Figure 4-8. Using P250 Pump and Eductor Pumping Contaminated Space
SS100-A
G
-M A
N
4-11
Figure 4-9. Using P100 Pump and Eductor Pumping Contaminated Space
SS100-A
G
-M A
N
4-12
Figure 4-10. Using 1-1/2″ Eductor Connected to a Standpipe
SS100-A
G
-M A
N
4-13
Figure 4-11. Using Peri Jet Eductor and 1-1/2″ Fireplug
SS100-A
G
-M A
N
4-14
Figure 4-12. Using P100 to Actuate Both the 1-1/2″ Eductor and the Foot Valve Strainer
SS100-A
G
-M A
N
4-15
Figure 4-13. Using Both Peri Jet Eductor and 1-1/2″ Eductor
SS100-A
G
-M A
N
4-16
Figure 4-14. Using Peri Jet Eductor Supplied by 2-1/2″ and 1-1/2″ Hoses (Increased Capacity 20%)
G
-M A
N
4-17
Figure 4-15. 20 Foot Suction Lift Using Three P100 Pumps in Tandem
4-18
Figure 4-16. Using Darley Pump and 1-1/2″ Eductor
SS100-A
G
-M A
N
4-19
Figure 4-17. Using Submersible Pumps Single or in Tandem
SS100-A
G
-M A
N
4-20
Figure 4-18. Using Submersible Pump
G
-M A
N
4-21
Figure 4-19. Using Electric Subpump to Provide Actuating Water to Peri Jet Eductor
G
-M A
N
4-22
CHAPTER 5
EMERGENCY COMMUNICATIONS EVOLUTIONS
FIGURE NO. TITLE OF SKETCH
TBD
5-1 / (5-2 Blank)
5-2
CHAPTER 6
EMERGENCY LIGHTING EVOLUTIONS
FIGURE NO. TITLE OF SKETCH
TBD
6-1 / (6-2 Blank)
6-2
CHAPTER 7
FIREHOSES/FITTINGS EVOLUTION
FIGURE NO. TITLE OF SKETCH
7-1 Operating Positions for Navy 1-1/2″ Vari-Nozzles 7-2 Using Nozzle Tip and Applicator 7-3 Operating Positions for Navy Ail-Purpose 1-1/2″ Nozzles Used at High Velocity 7-4 Navy All-Purpose 1-1/2″ Nozzles with Applicators 7-5 Spanner Wrenches 7-6 Preparing Firehose for Stowage 7-7 Replacing Ruptured Fire Hose Using 2-1/2″ Hose Clamp
1.
7-1
Figure 7-1. Operating Positions for Navy 1-1/2″ Vari-Nozzles
SS100-A
G
-M A
N
7-2
Figure 7-2. Using Nozzle Tip and Applicator
SS100-A
G
-M A
N
7-3
Figure 7-3. Operating Positions for Navy All-Purpose 1-1/2″ Nozzles Used at High Velocity
SS100-A
G
-M A
N
7-4
Figure 7-4. Navy All-Purpose 1-1/2″ Nozzles with Applicators
SS100-A
G
-M A
N
7-5
Figure 7-5. Spanner Wrenches
SS100-A
G
-M A
N
7-6
Figure 7-6. Preparing Firehose for Stowage
G
-M A
N
7-7
Figure 7-7. Replacing Ruptured Fire Hose Using 2-1/2″ Hose Clamp
G
-M A
N
7-8
CHAPTER 8
FIREFIGHTING EVOLUTION
FIGURE NO. TITLE OF SKETCH
8-1 Using Portable AFFF (In-Line) Eductor/Firemain 8-2 Using NAP Nozzle and 4 Foot Applicator 8-3 Using P250 Pump and In-Line Eductor 8-4 Using P100 Pump and In-Line Eductor 8-5 Using P250 Pump and Various Applicators 8-6 Using P100 Pump and A 4 FT Applicator 8-7 Using P250 Pump Taking Suction from Overboard or Flooded Compartment 8-8 Using P100 Pump Taking Suction from Overboard or Flooded Compartment 8-9 Replacing Ruptured Firehose
8-10 Vertical Trunk Hose Handling 8-11 Using Portable AFFF (In-line) Eductor 8-12 Hose Line and Nozzle Handling Methods 8-13 Fire Attack - Direct Attack 8-14 Fire Attack - Attack from an Access 8-15 Fire Attack - Direct Attack with Vent to Weather 8-16 Indirect Attack 8-17 Indirect Attack with Venting
1.
8-1
Figure 8-1. Using Portable AFFF (In-Line) Eductor/Firemain
SS100-A
G
-M A
N
8-2
Figure 8-2. Using NAP Nozzle and 4 Foot Applicator
SS100-A
G
-M A
N
8-3
Figure 8-3. Using P250 Pump and In-Line Eductor
SS100-A
G
-M A
N
8-4
Figure 8-4. Using P100 Pump and In-Line Eductor
SS100-A
G
-M A
N
8-5
Figure 8-5. Using P250 Pump and Various Applicators
SS100-A
G
-M A
N
8-6
Figure 8-6. Using P100 Pump and A 4 FT’ Applicator
SS100-A
G
-M A
N
8-7
Figure 8-7. Using P250 Pump Taking Suction from Overboard or Flooded Compartment
SS100-A
G
-M A
N
8-8
Figure 8-8. Using P100 Pump Taking Suction from Overboard or Flooded Compartment
SS100-A
G
-M A
N
8-9
Figure 8-9. Replacing Ruptured Firehose
SS100-A
G
-M A
N
8-10
Figure 8-10. Vertical Trunk Hose Handling
SS100-A
G
-M A
N
8-11
Figure 8-11. Using Portable AFFF (In-Line) Eductor
SS100-A
G
-M A
N
8-12
Figure 8-12. Hose Line and Nozzle Handling Methods (Sheet 1 of 2)
SS100-A
G
-M A
N
8-13
Figure 8-12. Hose Line and Nozzle Handling Methods (Sheet 2 of 2)
SS100-A
G
-M A
N
8-14
Figure 8-13. Fire Attack - Direct Attack
SS100-A
G
-M A
N
8-15
Figure 8-14. Fire Attack - Attack from an Access
SS100-A
G
-M A
N
8-16
Figure 8-15. Fire Attack - Direct Attack with Vent to Weather
SS100-A
G
-M A
N
8-17
Figure 8-16. Indirect Attack
G
-M A
N
8-18
Figure 8-17. Indirect Attack with Venting
G
-M A
N -010
8-19 /(8-20
B lank)
8-20
CHAPTER 9
NAVAL FIREFIGHTERS’ THERMAL IMAGER
FIGURE NO. TITLE OF SKETCH
9-1 Allowing Sight through Dense Smoke and Light Steam to Locate Seat of Fire, in Overhaul Operations and for Search and Rescue of Personnel
9-2 Typical Operating Scenario 1.
9-1
Figure 9-1. Allowing Sight through Dense Smoke and Light Steam to Locate Seat of Fire, in Overhaul Operations and for Search and Rescue of Personnel
SS100-A
G
-M A
N
9-2
Figure 9-2. Typical Operating Scenario
G
-M A
N -010
9-3 /(9-4
9-4
CHAPTER 10
PATCHING/PLUGGING EVOLUTION
FIGURE NO. TITLE OF SKETCH
10-1 Use of Wooden Plugs and Wedges in Filling Holes 10-2 Plugging with Mattresses 10-3 Box Patch 10-4 Hinged Plate Patch 10-5 Securing Patch with Hook Bolts 10-6 Folding T-Patch 10-7 Plate Patch 10-8 Bucket Patch 10-9 Patching and Sealing Crack
10-10 Caulking Thin Plating and Torn Seams 10-11 Cloth Patch 10-12 Emergency Leak Plugging Using Flange Clamp
1.
10-1
Figure 10-1. Use of Wooden Plugs and Wedges in Filling Holes
G
-M A
N
10-2
Figure 10-2. Plugging with Mattresses
10-3
Fi gu re
-3
B ox
Pa tc h
10-4
Figure 10-4. Hinged Plate Patch
SS100-A
G
-M A
N
10-5
Figure 10-5. Securing Patch with Hook Bolts
SS100-A
G
-M A
N
10-6
Figure 10-6. Folding T-Patch
SS100-A
G
-M A
N
10-7 gu re
-7
Pl at e Pa tc h
10-8 gu re
-8
B uc ke t
Pa tc h
10-9
Figure 10-9. Patching and Sealing Crack
SS100-A
G
-M A
N
10-10
Figure 10-10. Caulking Thin Plating and Torn Seams
SS100-A
G
-M A
N
10-11
Figure 10-11. Cloth Patch
G
-M A
N
10-12
Figure 10-12. Emergency Leak Plugging Using Flange Clamp
G
-M A
N -010
10-13 /(10-14
10-14
CHAPTER 11
PIPE PATCHING EVOLUTION
FIGURE NO. TITLE OF SKETCH
11-1 Pipe Patching Equipment 11-2 Band-It Patch Isolated Pipe 11-3 Band-It Patch on Pressurized Pipe 11-4 Metal Banding Procedures for Band-It Patch 11-5 Emergency Water Activated Repair Patch (EWARP) 11-6 Jubilee Pipe Patch 11-7 Soft Patch on Low-Pressure Pipe Line 11-8 Clamp Patch 11-9 Flange Pipe Patch 11-10 Simple Pipe Patch 11-11 Elbow Pipe Patch Using Plastic Pipe Patching Kit 11-12 Severed Pipe Patch 11-13 Compound Pipe Patch
1.
11-1
Figure 11-1. Pipe Patching Equipment
SS100-A
G
-M A
N
11-2
Figure 11-2. Band-It Patch Isolated Pipe
SS100-A
G
-M A
N
11-3
Figure 11-3. Band-It Patch on Pressurized Pipe (Sheet 1 of 2)
SS100-A
G
-M A
N
11-4
Figure 11-3. Band-It Patch on Pressurized Pipe (Sheet 2 of 2)
SS100-A
G
-M A
N
11-5
Figure 11-4. Metal Banding Procedures for Band-It Patch (Sheet 1 of 2)
SS100-A
G
-M A
N
11-6
Figure 11-4. Metal Banding Procedures for Band-It Patch (Sheet 2 of 2)
SS100-A
G
-M A
N
11-7
Figure 11-5. Emergency Water Activated Repair Patch (EWARP)
SS100-A
G
-M A
N
11-8
Figure 11-6. Jubilee Pipe Patch
SS100-A
G
-M A
N
11-9
Figure 11-7. Soft Patch on Low-Pressure Pipe Line
SS100-A
G
-M A
N
11-10 gu re
-8
C la m p
Pa tc h
11-11
Figure 11-9. Flange Pipe Patch
SS100-A
G
-M A
N
11-12
Figure 11-10. Simple Pipe Patch
SS100-A
G
-M A
N
11-13
Figure 11-11. Elbow Pipe Patch Using Plastic Pipe Patching Kit
SS100-A
G
-M A
N
11-14
Figure 11-12. Severed Pipe Patch
G
-M A
N
11-15
Figure 11-13. Compound Pipe Patch
G
-M A
N
11-16
CHAPTER 12
REPAIR PARTY PERSONNEL PROTECTIVE CLOTHING
FIGURE NO. TITLE OF SKETCH
12-1 Firefighter’s Ensemble and Oxygen Breathing Apparatus (OBA) 12-2 Repair Party Outfit 12-3 Aircraft Fire Fighting and Chemical, Biological & Radiological (CBR) Protective Clothing
1.
12-1
Figure 12-1. Firefighter’s Ensemble and Oxygen Breathing Apparatus (OBA)
SS100-A
G
-M A
N
12-2
Figure 12-2. Repair Party Outfit
G
-M A
N
12-3
Figure 12-3. Aircraft Fire Fighting and Chemical, Biological & Radiological (CBR) Protective Clothing
G
-M A
N
12-4
CHAPTER 13
SHORING EVOLUTION
FIGURE NO. TITLE OF SKETCH
13-1 Measuring Length and Angle of Shore Using Measuring Batten 13-2 Measuring and Cutting Shores using Folding Rule or Steel Tape and Carpenter’s Square 13-3 l-Type Shoring Using 3-5 Ft. or 6-11 Ft. Metal Shore 13-4 I and K-Type Shoring Using Wooden and Adjustable 6-11 Ft. Metal Shores 13-5 I and K-Type Shoring Using Adjustable 3-5 Ft and 6-11 Ft. Metal Shores 13-6 I-Type Shoring as Erected in Passage On USS SAMUEL B. ROBERTS (FFG 58) 13-7 Shoring Split Seam After Bulkhead of Auxiliary Machinery Room on USS SAMUEL B. ROB-
ERTS (FFG 58)
13-8 K-Type Shoring Forward Bulkhead in CMBD SPLY DEPT STRM Room FFG 58 13-9 H-Type Shoring with Wooden Shores
13-10 I-Type Shoring Using Wooden Shore to Support Sagging Overhead 13-11 I-Type Shoring Using Multiple Combination of 6-11 Ft. Metal Shores and Wooden Shore to Sup-port Overhead Deck or Load 13-12 I-Type Shoring on Watertight Door Using Wooden Shores 13-13 I-Type Shoring on Watertight Door Using Metal Shores 13-14 I-Type Shoring on Hatch with Scuttle Using Wooden Shores 13-15 I-Type Shoring on Hatch with Scuttle Using Metal Shores 13-16 K-Type Shoring 13-17 K-Type Shoring on Watertight Door Using Wooden Shores 13-18 K-Type Shoring on Watertight Door Using Metal Shores 13-19 Distributing Bulkhead Pressure over Stiffeners with K-Type Shoring (Using Wooden or/and Metal
Shores) 13-20 Compound Shoring 13-21 Shoring from Bulkhead to Hatch and Providing Support for Weakened Overhead 13-22 General Rules for Shoring Against Horizontal Pressure 13-23 General Rules for Setting Correct Shoring Angles 13-24 Strengthening Shores
1.
13-1
Figure 13-1. Measuring Length and Angle of Shore Using Measuring Batten
SS100-A
G
-M A
N
13-2
Figure 13-2. Measuring and Cutting Shores Using Folding Rule or Steel Tape and Carpenter’s Square
SS100-A
G
-M A
N
13-3
Figure 13-3. I-Type Shoring Using 3-5 Ft. or 6-11 Ft. Metal Shore
SS100-A
G
-M A
N
13-4
Figure 13-4. I and K-Type Shoring Using Wooden and Adjustable 6-11 Ft. Metal Shores
SS100-A
G
-M A
N
13-5
Figure 13-5. I and K-Type Shoring Using Adjustable 3-5 Ft and 6-11 Ft Metal Shores
SS100-A
G
-M A
N
13-6
Figure 13-6. I-Type Shoring as Erected in Passage on USS SAMUEL B. ROBERTS (FFG 58)
SS100-A
G
-M A
N
13-7
Figure 13-7. Shoring Split Seam After Bulkhead of Auxiliary Machinery Room on USS SAMUEL B. ROBERTS (FFG 58)
SS100-A
G
-M A
N
13-8
Figure 13-8. K-Type Shoring Forward Bulkhead in CMBD SPLY DEPT STRM Room USS SAMUEL B. ROBERTS (FFG 58)
SS100-A
G
-M A
N
13-9
Figure 13-9. H-Type Shoring with Wooden Shores
SS100-A
G
-M A
N
13-10
Figure 13-10. I-Type Shoring Using Wooden Shore to Support Sagging Overhead
SS100-A
G
-M A
N
13-11
Figure 13-11. I-Type Shoring Using Multiple Combination of 6-11 Ft. Metal Shores and Wooden Shore to Support Overhead Deck or Load
SS100-A
G
-M A
N
13-12
Figure 13-12. I-Type Shoring on Watertight Door Using Wooden Shores
SS100-A
G
-M A
N
13-13
Figure 13-13. I-Type Shoring on Watertight Door Using Metal Shores
SS100-A
G
-M A
N
13-14
Figure 13-14. I-Type Shoring on Hatch with Scuttle Using Wooden Shores
SS100-A
G
-M A
N
13-15
Figure 13-15. I-Type Shoring on Hatch with Scuttle Using Metal Shores
SS100-A
G
-M A
N
13-16
Figure 13-16. K-Type Shoring
SS100-A
G
-M A
N
13-17
Figure 13-17. K-Type Shoring on Watertight Door Using Wooden Shores
SS100-A
G
-M A
N
13-18
Figure 13-18. K-Type Shoring on Watertight Door Using Metal Shores
SS100-A
G
-M A
N
13-19
Figure 13-19. Distributing Bulkhead Pressure over Stiffeners with K-Type Shoring (Using Wooden or/and Metal Shores)
SS100-A
G
-M A
N
13-20
Figure 13-20. Compound Shoring
SS100-A
G
-M A
N
13-21
Figure 13-21. Shoring from Bulkhead to Hatch and Providing Support for Weakened Overhead
SS100-A
G
-M A
N
13-22
Figure 13-22. General Rules for Shoring Against Horizontal Pressure
SS100-A
G
-M A
N
13-23
Figure 13-23. General Rules for Setting Correct Shoring Angles
G
-M A
N
13-24 gu re
-2 4.
St re ng th en in g Sh or es
13-25 / (13-26 Blank)
13-26
CHAPTER 14
SYSTEM RESTORE/RECONFIGURE EVOLUTION
FIGURE NO. TITLE OF SKETCH
14-1 Providing Temporary Firemain Service Using Firehose Bypassing Damaged Firemain 14-2 Providing Temporary Firemain Service by Hose Jumping at Flanges
1.
14-1
Figure 14-1. Providing Temporary Firemain Service Using Firehose Bypassing Damaged Firemain
G
-M A
N
14-2
Figure 14-2. Providing Temporary Firemain Service by Hose Jumping at Flanges
G
-M A
N -010
14-3 /(14-4
14-4
CHAPTER 15
COMPLEX DAMAGE CONTROL EVOLUTION
FIGURE NO. TITLE OF SKETCH
15-1 Dewatering and Desmoking Using Electric Sub Pump Discharge Actuating Water Driven Fan and 1-1/2″ Eductor
15-2 Dewatering and Desmoking Using Water Driven Fan and P250 Pump Taking Suction from Flooded Compartment
15-3 Dewatering and Desmoking Using Water Driven Fan and P100 Pump Taking Suction from Flooded Compartment
1.
15-1
Figure 15-1. Dewatering and Desmoking Using Electric Sub Pump Discharge Actuating Water Driven Fan and 1-1/2″ Eductor
SS100-A
G
-M A
N
15-2
Figure 15-2. Dewatering and Desmoking Using Water Driven Fan and P250 Pump Taking Suction from Flooded Compartment
G
-M A
N
15-3
Figure 15-3. Dewatering and Desmoking Using Water Driven Fan and P100 Pump Taking Suction from Flooded Compartment
SS100-A
G
-M A
N
15-4
15-5
15-6
REAR SECTION
TECHNICAL MANUAL DEFICIENCY/EVALUATION REPORT (TMDER)
NOTE
Ships, training activities, supply points, depots, Naval Shipyards and Supervisors of Shipbuilding are requested to arrange for the maximum practical use and evaluation of NAVSEA technical manuals. All errors, omissions, discrepancies and suggestions for improvement to NAVSEA technical manuals shall be for-warded to:
COMMANDER,
CODE 310 TMDER, BLDG 1388
NAVSURFWARCENDIV NSDSA
4363 MISSILE WAY
PORT HUENEME CA 93043-4307
on NAVSEA/SPAWAR Technical Manual Deficiency/Evaluation Report (TMDER), NAVSEA form 4160/1. To facilitate such reporting, print, complete and mail NAVSEA form 4160/1 below or submit TMDERS at web site:
https://nsdsa2.phdnswc.navy.mil/tmder/tmder-generate.asp?lvl=1 All feedback comments shall be thoroughly investigated and originators will be advised of action resulting therefrom. Copies of NAVSEA form 4160/1 may be requisitioned from the Naval Systems Data Support Activity Code 310 at the above address.
TMDER / MAILER
Rear-1 / (Rear-2 Blank)
Rear-2
| 1. ACCESS EVOLUTIONS |
| 2. CASUALTY POWER SYSTEM |
| 3. DESMOKING EVOLUTION |
| 4. DEWATERING EVOLUTION |
| 5. EMERGENCY COMMUNICATIONS EVOLUTIONS |
| 6. EMERGENCY LIGHTING EVOLUTIONS |
| 7. FIREHOSES/FITTINGS EVOLUTION |
| 8. FIREFIGHTING EVOLUTION |
| 9. NAVAL FIREFIGHTERS' THERMAL IMAGER |
| 10 PATCHING/PLUGGING EVOLUTION |
| 11 PIPE PATCHING EVOLUTION |
| 12 REPAIR PARTY PERSONNEL PROTECTIVE CLOTHING |
| 13 SHORING EVOLUTION |
| 14 SYSTEM RESTORE/RECONFIGURE EVOLUTION |
| 15 COMPLEX DAMAGE CONTROL EVOLUTION |
| LIST OF TABLES |
| LIST OF ILLUSTRATIONS |
| 1-1. Portable Exothermic Cutting Unit (PECU) Equipment |
| 1-2. Portable Exothermic Cutting Unit (PECU) - Gaining Access to Damaged Compartments Using PECU |
| 1-3. Portable Hydraulic Access and Rescue System (PHARS) Equipment |
| 1-4. Portable Hydraulic Access and Rescue System (PHARS) |
| 1-5. Portable Hydraulic Access and Rescue System (PHARS) |
| 1-6. PHARS - Gaining Access through Watertight Door with Hydraulic Spreader |
| 1-7. Portable Hydraulic Access and Rescue System (PHARS) |
| 1-8. Rescue and Patient Transportation Devices |
| 1-9. One Man Moving A Casualty |
| 1-10. Two-Man Carries |
| 1-11. Cardiopulmonary Resuscitation |
| 1-12. Preparing a Victim for Helicopter Evacuation |
| 1-13. Example of Hoisting Equipment Using a Bowline and a Clove Hitch |
| 1-14. Bowline Knot - A Good Knot for Forming a Loop That Will Not Slip Under Strain and It May Be Easily Untied |
| 1-15. Clove Hitch Knot - Used for Attaching a Rope to an Object Such as a Pole, Post, or Hose |
| 1-16. Clove Hitch - Tying the Clove Hitch around an Object |
| 1-17. Becket or Sheet Bend Knot - Used for Joining Two Ropes (Well-Suited for Joining Ropes of Unequal Diameters) |
| 1-18. Water Knot - Used for Joining Two Strips of Canvas or Rope |
| 1-19. Mariners Knot - a Knot System That Can Be Released under Load |
| 2-1. Bulkhead Terminal |
| 2-2. Supply Power to Equipment Designated to Receive Casualty Power |
| 2-3. Casualty Power Run |
| 3-1. Desmoking Equipment |
| 3-2. Smoke Curtain Set-Up |
| 3-3. Smoke Blanket Set-up |
| 3-4. Using Box Fan(s) Set in Watertight Door With Smoke Curtain |
| 3-5. Using Box Fan Hung Across Watertight Door With Smoke Curtain |
| 3-6. Using Two Fans Hung From Top of Watertight Door with Smoke Curtain |
| 3-7. Optimum Placement of Desmoking Fans from Door (Seal Door Using Fan's Air) |
| 3-8. Desmoking with Water Driven Fan Placed Adjacent to Smoke Filled Compartment |
| 3-9. Using Water Driven Fan Placed Adjacent to Smoke Filled Compartment and Vent Duct Exhausting through Scuttle to Weather Deck |
| 3-10. Desmoking with Water Driven Fan Placed Adjacent to Smoke Filled Compartment |
| 3-11. Using Water Driven Fan Placed on Weather Deck or Below Adjacent to Smoked Compartment |
| 3-12. Using Red Devil Blower Placed on Weather Deck or Below Adjacent to Smoked Compartment |
| 3-13. Using Water Driven Fan To Desmoke Compartment with Box Fan on Scuttle |
| 3-14. Using Water Driven Fan To Desmoke Compartment with Box Fan on Hatch |
| 3-15. Using Red Devil Blower Placed on Weather Deck |
| 3-16. Showing Portable Suction Duct Through the Smoke Curtain Located in Door Frame |
| 3-17. Desmoking from Weather Deck or Clear Space with Water Driven Fan Actuated by P250 Pump |
| 3-18. Desmoking from Weather Deck or Clear Space with Water Driven Fan Actuated by P100 Pump |
| 3-19. Using Electric Subpump Supplying Water to Water Driven Fan and to 1-1/2" Firehose |
| 3-20. Negative Pressure Ventilation Explanation |
| 3-21. Using Combinations of Box Fans in Negative Pressure (Sheet 1 of 2) |
| 3-21. Using Combinations of Box Fans in Negative Pressure (Sheet 2 of 2) |
| 3-22. Desmoking Passageway Through Vent Trunk Using Box Fans in Negative Pressure |
| 4-1. Dewatering Equipment (Sheet 1 of 3) |
| 4-1. Dewatering Equipment (Sheet 2 of 3) |
| 4-1. Dewatering Equipment (Sheet 3 of 3) |
| 4-2. Using 1-1/2" Eductor with or without Strainer |
| 4-3. Using 2-1/2" Eductor or Peri Jet with or without Foot Valve Actuating from 2-1/2" Fireplug or P100 or P250 Pump |
| 4-4. Suction Lifts Under 20 Feet |
| 4-5. Suction Lifts Under 20 Feet |
| 4-6. Using 1-1/2" Eductor and Peri Jet Eductor for Lift Over 20 Feet |
| 4-7. Using 1-1/2" Eductor and Peri Jet Eductor for Lift Over 20 Feet |
| 4-8. Using P250 Pump and Eductor Pumping Contaminated Space |
| 4-9. Using P100 Pump and Eductor Pumping Contaminated Space |
| 4-10. Using 1-1/2" Eductor Connected to a Standpipe |
| 4-11. Using Peri Jet Eductor and 1-1/2" Fireplug |
| 4-12. Using P100 to Actuate Both the 1-1/2" Eductor and the Foot Valve Strainer |
| 4-13. Using Both Peri Jet Eductor and 1-1/2" Eductor |
| 4-14. Using Peri Jet Eductor Supplied by 2-1/2" and 1-1/2" Hoses (Increased Capacity 20%) |
| 4-15. 20 Foot Suction Lift Using Three P100 Pumps in Tandem |
| 4-16. Using Darley Pump and 1-1/2" Eductor |
| 4-17. Using Submersible Pumps Single or in Tandem |
| 4-18. Using Submersible Pump |
| 4-19. Using Electric Subpump to Provide Actuating Water to Peri Jet Eductor |
| 7-1. Operating Positions for Navy 1-1/2" Vari-Nozzles |
| 7-2. Using Nozzle Tip and Applicator |
| 7-3. Operating Positions for Navy All-Purpose 1-1/2" Nozzles Used at High Velocity |