20R3004 Attachment P- MECSP Worksheet.pdf

PDF 39 KB Posted

Attached to
Operation and Maintenance of High Speed Transport (HST) Vessels
Solicitation number
N32205-20-R-3004
Issued by

About this file

This document contains an attachment worksheet requiring offerors to submit a Mission Essential Contractor Services Plan (MECSP) in response to solicitation N32205-20-R-3004 from the Department of the Navy Military Sealift Command. The solicitation is for the operation and maintenance of High Speed Transport vessel USNS GUAM to perform worldwide. Offerors must complete the worksheet providing narrative descriptions addressing six required elements for the MECSP as set forth by DFARS 252.237-7024, including provisions for acquiring essential personnel and resources for continuity of operations up to 30 days, challenges in maintaining essential services during repeated pandemic waves, time lapses to acquire and make personnel and resources available, components and processes for identifying and preparing personnel to relocate or work remotely, alert and notification procedures to mobilize identified essential personnel, and approaches for communicating expectations to contractor employees regarding roles and responsibilities during a crisis.

View the file

Other files

File Type Posted
AC Distribution Line Diagrams_Part3.pdf PDF
SAMM Planned Maintenance.xlsx XLSX spreadsheet
PMIA Maintenance Items.xlsx XLSX spreadsheet
20R3004- Conformed through AMD 0005.pdf PDF
20R3004 Amd 0005 Released.pdf PDF
AC Distribution Line Diagrams_Part1.pdf PDF
Service Upgrades- Transalts.xlsx XLSX spreadsheet
AC Distribution Line Diagrams_Part2.pdf PDF
Damage Control and Firefightng Equip Layout.pdf PDF
Shafting General Arrangement Drawing.pdf PDF
20R3004- AMD 0004- Released.pdf PDF
Ship Drawing Index.xls XLS spreadsheet
Docking Plan.pdf PDF
General Arrangement Drawings.pdf PDF
Damge Control Manual.pdf PDF
Craft Operating Manual 20171014.pdf PDF
Trim and Stability Book Rev D.pdf PDF
KAMEWA.pdf PDF
20R3004- Conformed through AMD 0004.pdf PDF
20R3004 AMD 0003- Released.pdf PDF
20R3004 Conformed through AMD 0003.pdf PDF
20R3004 Conformed through AMD 0002.pdf PDF
20R3004 AMD 0002 Released.pdf PDF
20R3004- Conformed through AMD 01.pdf PDF
20R3004- AMD 0001- Released.pdf PDF
20R3004 Attachment M- Award Fee Plan.pdf PDF
20R3004 Attachment C- DD 254.pdf PDF
20R3004 Attachment D- P and I Guidelines.pdf PDF
20R3004 Attachment Q- Request for Clarification or Question.docx DOCX document
20R3004 Attachment O- Pricing Forms..xlsx XLSX spreadsheet
20R3004 Attachment E- American Institute Hull Clauses.pdf PDF
20R3004 Attachment K- Technical Proposal Datasheets.docx DOCX document
20R3004 Attachment L- CDRL.pdf PDF
20R3004 Attachment N- List of GFP.xlsx XLSX spreadsheet
20R3004- Released.pdf PDF
20R3004 Attachment F- Oversight and Metrics.pdf PDF
20R3004 Attachment H- Invoice Requirements.pdf PDF
20R3004 Attachment J- Monthly Budget Status Report.xlsx XLSX spreadsheet
20R3004 Attachment I- Past Performance Narrative.pdf PDF
20R3004 Attachment L - Contract Deliverables.xlsx XLSX spreadsheet
20R3004 Attachment G- SF LLL.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment P – MECSP Worksheet 1

N32205-20-R-3004 - ATTACHMENT P

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN WORKSHEET

In accordance with DFARS 252.237-7023, Continuation of Essential Contractor Services; DFARS 252.237-7024, Notice of Continuation of Essential Contractor Services; and Section L-7(A)(8) of the RFP, offerors are required to submit a Mission Essential Contractor Services Plan (MECSP). Section L- 7(A)(8) of the RFP also requires that offerors on the subject procurement complete and submit this MECSP Worksheet.

All contractor services performed under this contract are essential contractor services in support of mission-essential functions.

For each of the below required elements of a MECSP, set forth by DFARS 252.237-7024, offerors must respond with a narrative description of how the proposed MECSP provides the required information.

References to the section and page number of the MECSP in which the requirement is addressed must also be provided. If the required information is not included in the proposed MECSP, the response provided in the below worksheet will be considered an addendum to the proposed MECSP. Please attach additional sheets, if more space is required than provided below.

1. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed (DFARS 252.237- 7024(b)(1)).

2. Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (DFARS 252.237-7024(b)(2)(i)).

3. Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (DFARS 252.237-7024(b)(2)(ii)).

4. Address the components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (DFARS 252.237-7024(b)(2)(iii)).

Attachment P – MECSP Worksheet 2

5. Address any established alert and notification procedures for mobilizing identified ``essential contractor service'' personnel (DFARS 252.237-7024(b)(2)(iv)).

6. Address the approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (DFARS 252.237-7024(b)(2)(v)).

File details come from the government source that posted it. Updated .