Amendment_0002.docx

DOCX document 46 KB Posted

Attached to
Diesel Engine IDIQ
Solicitation number
N32205-17-R-4901
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
JandA_(GOCO)_Redacted.pdf PDF
JandA_(T-AH)_4-25-18_(1)_Redacted.pdf PDF
Amendment_0008.pdf PDF
Questions_and_Answers_12-27-17.docx DOCX document
Amendment_0007.pdf PDF
Amendment_0004.docx DOCX document
Request_for_Information_1.docx DOCX document
Amendment_0003.docx DOCX document
Amendment_0001.docx DOCX document
Attachment_6_-_Engines.xlsx XLSX spreadsheet
ATTACHMENT_3__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Attachment_2_Past_Performance_Data.docx DOCX document
J&A_FBO.pdf PDF
Solicitation_N32205-17-R-4901.docx DOCX document
Attachment_1_-_Price_Schedule.xlsx XLSX spreadsheet
ATTACHMENT_5_NDA.docx DOCX document
Pre-Solicitation_Notice.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-17-R-4901

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

MSC OMBUDSMAN

MSC OMBUDSMAN

The MSC Ombudsman is available to assist in the resolution of contractor complaints arising with respect to the issuance of any task or delivery order under this contract. Ombudsman assistance is optional. However, in the case of orders valued at $10 million or less, FAR 16.505(a)(10)(i)(A) prohibits protests under FAR Subpart 33.1, including protests of Contracting Officer decisions regarding fair opportunity, except protests asserting that a task or delivery order increases the scope or maximum value of the contract.

The Contractor is encouraged to first seek resolution of its complaint with the MSC Contracting Officer. If that effort fails or if the Contractor elects to forego that approach, the Contractor must submit its complaint to the Ombudsman no later than 10 days after the task order award decision has been issued by the MSC Contracting Officer. Complaints submitted after that date are untimely and considered waived.

The MSC Ombudsman for this contract is:

Bill Reich Director, Policy and Compliance Division, N101 471 East C. Street SP-64 Norfolk Naval Station, VA 23511

(757) 443-3603 william.reich@navy.mil

Alternate:

Kevin Spillane Supervisory Procurement Analyst, N101a 914 Charles Morris Ct., NE Washington Navy Yard, Washington DC 20398

(202) 685-5930 kevin.spillane@navy.mil

By submission of a complaint, the Contrctor authorizes the Ombudsman to disclose any information submitted to the Ombudsman that, in the judgment of the Ombudsman, must be disclosed within the Government to the extent deemed necessary by the Ombudsman to facilitate understanding of the issue or issues. The Contractor understands the Ombudsman shall disclose any information submitted to the Ombudsman that, in the judgment of the Ombudsman, must be disclosed to prevent or investigate fraud, waste, abuse, criminal activity or imminent physical harm.

In accordance with FAR 16.505(a) (10) (i) (B), protests of task or delivery orders valued in excess of $10 million must be filed in accordance with the procedures at FAR 33.104. Seeking Ombudsman assistance does not extend the time for filing a timely protest with the GAO.

NOTE: 10 USC 2304c (e)(1)(B) was updated to change the $10,000,000.00 protest threshold for orders to $25,000,000.00.

52.212-1 (ADDENDUM) ADDITIONAL INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS

ADDENDUM TO FAR 52.212-1

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

Any inconsistency between FAR Provision 52.212-1 and the Addendum to FAR 52.212-1 shall be solved by giving precedence to the Addendum to FAR 52.212-1.

A. Paragraph (c) of FAR Provision 52.212-1 is amended to read: Period of acceptance of offers. The offeror agrees to hold the prices in its offer firm for 120 days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

B. Paragraph (b) of FAR Provision 52.212-1, Submission of Offers, is amended as follows:

SOLICITATION PROVISIONS

Contractor will be required to fill out and return the following FAR and DFARs Provisions and Clauses:

PARAGRAPH
TITLE
DATE
52.209-7
Information Regarding Responsibility Matters
Jul 2013
52.209-12
Certification Regarding Tax Matters
Feb 2016
52.212-3 Alt I
Offeror Representations and Certifications – Commercial Items
Jan 2017
252.225-7000
Buy American – Balance of Payments Program Certificate – Basic
Nov 2014
252.247-7022
Representation of Extent of Transportation by Sea
Aug 1992

PROPOSAL PREPARATION INSTRUCTIONS

A. Proposal Submittal and Inquiries.

1. Proposals shall be received prior to the closing date and time identified on the SF 1449, electronically at the following address:

Mark.draluck@navy.mil

2. The subject line of the email submission shall read, “N32205-17-R-4901 // [Offeror’s Name] // Part [X] of [Y],” (Part X of Y is utilized to indicate multiple emails as part of the submission where X is the email number and Y is the number of total emails to be received). NOTE: to ensure attachments are properly received, offerors are encouraged to limit the sum total size of a single email to 10 megabytes (MB).

3. Submissions shall not contain any classified material. It is the sole-responsibility of the offeror to ensure that the files submitted are virus free and can be opened and read by the Government.

4. The point of contact responsible for supplying additional information and answering all inquiries is the Contracting Officer via the Contract Specialist. Address all questions or concerns the offeror may have to the Contract Specialist, Mark Draluck, and the Contracting Officer, Michelle Siebeking-Knox. All questions concerning the solicitation shall be submitted in writing via email to:

Mark.draluck@navy.mil Michelle.r.knox@navy.mil

All questions shall be received no later than 30 June 2017. Offerors are cautioned that any question received after this deadline may not receive a response.

B. General Instructions.

1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Subpart 15.3. Offerors will be evaluated using the criteria under FAR Provision 52.212-2, “Evaluation – Commercial Items.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government’s ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.

2. The offer. The submission of the documentation specified below will constitute the offeror’s acceptance of the terms and conditions of the RFP and concurrence with the contract type.

3. It is the Government’s intention to award without discussions. Offerors are encouraged to submit their best technical proposal and prices in initial proposals. In accordance with FAR 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with FAR 15.306(c)(2). Proposals containing unacceptable ratings may be included in the competitive range provided they can be made acceptable as a result of discussions.

4. Instructions outlined in paragraph C below, prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of information needed to allow for evaluation of proposals.

5. If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise deemed unsound, the offeror shall immediately notify the Contract Specialist in writing with the supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposals, as received, without discussion.

6. All referenced documents for this solicitation are available on the Federal Business Opportunities (FBO) website at https://www.fbo.gov. Potential offerors are encouraged to subscribe for real-time email notifications when information has been posted to the website for this solicitation. If any necessary documents are not available on FBO, please notify the Contract Specialist.

7. Debriefings. The Contracting Officer will promptly notify offerors if the decision to eliminate their proposals from the competitive range, whereupon an offeror can request and receive a debriefing in accordance with FAR 15.505. The Contracting Officer will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Any offeror requesting a debriefing must make the request in accordance with the requirements of FAR 15.506.

C. Proposal Preparation Instructions

1. Offeror’s proposal shall consist of four (4) separate volumes: General (Volume I), Technical (Volume II), Past Performance (Volume III), and Price (Volume IV).

2. Exceptions. Offerors are required to meet all solicitation requirements, such as terms and conditions, representation and certifications, and technical requirements, in addition to those identified as evaluation factors and subfactors. Failure to meet a requirement may result in an offeror being ineligible for award. If the offeror finds it necessary to take exception to any of the requirements specified in this solicitation, the offeror shall clearly identify the applicable Volume and exceptions with a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the offer ineligible for award. It is recommended that the offeror contact the Contracting Officer immediately prior to solicitation closing, upon identifying an area that may result in an exception.

3. Proposal Format

a. The proposals shall be organized into four (4) separate volumes. Each file sent via email shall include the volume number in the document title. It is permissible to include multiple volumes within one (1) email submission, however a single file can contain no more than one (1) volume.

b. Files shall be submitted in one (1) or a combination of the following formats: Adobe PDF, Microsoft Word, PowerPoint, and/or Excel. No file shall be locked. The file names shall consist of the volume number, factor, tab, company name, and state “initial” (for the first submission) and “Revision X” (for later submissions, if necessary) where X indicates the number of the revision.

c. The table below shows detailed page limits for submissions:

Table 1 – Volume Page Limits

Volume
Title
Page Limits
I
General
Not Applicable
II
Technical
30
III
Past Performance
50 (does not include questionnaire responses)
IV
Price
Not Applicable

d. Proposal Limitation. The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and remain unread. The Government will not accept any changes to the contractor’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals). If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors.

e. Page limits include: all appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.

f. Page limits do not include: covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, cross reference indices, and section dividers/tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked, “This page intentionally left blank,” will not be counted.

g. In the event that the offeror creates ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.

D. Proposal Content

1. Volume I – General. Offerors are required to submit: (TAB A) an Executive Summary; (TAB B) exceptions/assumptions (if required); (TAB C) a completed SF 1449 to include acknowledgement of amendments, if applicable; (TAB D) completed Representations and Certifications; (TAB E) Subcontracting Plan (applicable if the offeror is a large business); and (TAB F) Technical Non-Disclosure Agreement.

a. TAB A, Executive Summary. Provide an executive summary that introduces the Contractor team and proposal submission. In addition a statement of persons authorized to negotiate and sign on the offeror’s behalf with the Government in connection with this solicitation.

b. TAB B, Exceptions/Assumptions (if required). Identification and explanation of any exceptions or deviations. Additionally, any assumptions used in the proposal preparation must be identified.

c. TAB C, SF 1449. The SF 1449 shall be fully completed upon submission. The offeror shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 30 and FAR Provision 52.212-1.

d. TAB D, Representation, Certification, and Other Statements of Offerors. The offeror shall ensure that the required provisions stated above are submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely.

e. TAB E, Subcontracting Plan. In accordance with FAR Clause 52.219-9 and 52.219-9 Alt II Deviation 2016-O0009, DFARS Clause 252.219-7003 Deviation 2016-O0009, large business offerors shall submit a Small Business Subcontracting Plan with their proposal. Offerors shall ensure that they submit a Small Business Subcontracting Plan with all of the information required.

In preparing the Small Business Subcontracting Plan, offerors should note that historical compliance with FAR Clause 52.219-8, 52.219-9 Alt II, and DFARS Clause 252.219-7003 Deviation 2016-O0009 shall be evaluated as part of Past Performance.

f. TAB F, Technical Non-Disclosure Agreement. The offeror shall ensure that the required fields within the Attachment 5 Technical Non-Disclosure Agreement are completed.

2. Volume II – Technical. The technical proposal will be the basis for assessing the offeror’s ability to understand the scope of diesel engine maintenance described in the solicitation. FAR Provision 52.212-2 of the solicitation outlines the evaluation factors and defines the source selection evaluation criteria for evaluating the technical proposal. The technical volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the offeror’s proposal. Legibility, clarity, and coherence are very important. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet the requirements. Statements that the offeror understands, can, or will comply with the requirements; statements paraphrasing the requirements or parts thereof; and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of its facilities and experience, and will base its evaluation on the information presented in the offeror’s proposal. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.

The technical volume shall be organized according to the following general outline. Each Subfactor shall be submitted as its own Tab.

a. Subfactor A – Ability to Provide Original Equipment Manufacturer (OEM) Parts and Services. Offerors shall demonstrate their ability to provide OEM parts and services to maintain each diesel engine stated in the solicitation as either the OEM or an OEM authorized distributor/service technician. At a minimum, for each engine, proposals are to include either a statement that the offeror is the OEM for the engine or an official signed document from the OEM stating that the offeror is an authorized OEM parts and services provider for that engine.

b. Subfactor B – Key Personnel. Offerors shall demonstrate their ability to provide adequate maintenance services through qualified key personnel. At a minimum, offerors shall submit resumes for all proposed key personnel in sufficient detail to evaluate the qualifications to assure the proposed personnel meet the minimum requirements stated in paragraph 13 of the Performance Work Statement (PWS).

3. Volume III – Past Performance. The past performance evaluation will be accomplished by reviewing aspects of an offeror’s recent and relevant past performance. Offerors may provide information for up to three (3) previous Government contracts whose effort is/was recent and relevant to the effort required by this solicitation.

a. “Recent” is defined as a contract in-progress or completed within the last three (3) years. If the offeror has not had three (3) Government contracts within the last three (3) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted.

b. “Relevant” is defined as a contract or multiple simultaneous contracts cumulatively combined that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation.

I.Scope: Experience in the areas defined in the PWS.
II.Magnitude: The measure of similarity of the volume of orders, dollar value, and/or duration of work actually performed under the offeror’s submitted contracts to this acquisition.
III.Complexity: The measure of the similarity of technical difficulty, managerial intricacy, and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to this acquisition. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).

A Past Performance Data Sheet (Attachment 2) shall be submitted for each contract to be considered as past performance. Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract; and the role performed, including whether the offeror acted as a prime contractor or a subcontractor. Offerors are responsible for the accuracy of all data provided. Past performance information regarding predecessor companies, key personnel who have relevant experience and subcontractors that will perform major or critical aspects of the requirement may be provided as past performance submissions.

For each of the contracts the offeror describes in a Past Performance Data Sheet (Attachment 2), the offeror is requested to provide a Past Performance Questionnaire (Attachment 3) to a reference at the organization that awarded the contract. The reference, not the offeror, shall email the completed Past Performance Questionnaire BEFORE THE DUE DATE FOR PROPOSALS directly to the Contract Specialist, Mark Draluck, at mark.draluck@navy.mil. Fax submittals will not be considered. The offeror, NOT THE GOVERNMENT, is responsible for ensuring that the Government receives a sufficient number of questionnaires.

4. Volume IV – Price. The price proposal shall include all contract line items as delineated within the price schedule of the solicitation as well as all Exhibits found within Attachment 1 – Price Schedule (offerors may provide pricing in Attachment 1 for only the diesel engines being proposed). The solicitation price schedule submission shall include all unit pricing, extended pricing, and pricing contained within the CLIN description. Any discrepancy between the solicitation price schedule and Attachment 1, will be resolved by giving precedence to the solicitation price schedule.

The rates/unit pricing noted in both the solicitation price schedule and Attachment 1 will apply to each delivery and task order. The contractor may offer lower pricing when proposing for a delivery or task order, in which case the lower pricing shall apply, but only to the delivery or task order for which the pricing was offered.

All labor rates (Straight Time (ST), Overtime (OT), and Premium Time (PT) are considered fully burdened labor rates as defined in the PWS.

If necessary, the Government reserves the right to request and evaluate data other than certified cost or pricing data in accordance with FAR 15.403-3(c).

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .