Revised_Section_B.docx

DOCX document 40 KB Posted

Attached to
East Coast GSR Federal contract opportunity
Solicitation number
N32205-17-R-4900
Issued by
Department of the Navy Military Sealift Command

About this file

Revised Section B Price Schedule

View the file

Other files for this federal contract opportunity

Other files attached to East Coast GSR, newest first.
File Type Posted
Questions_and_Answers.docx DOCX document
Amendment_0005.pdf PDF
Questions_and_Answers.docx DOCX document
Amendment_0003.pdf PDF
Questions_and_Answers.docx DOCX document
Amendment_0002.pdf PDF
Questions_and_Answers.docx DOCX document
pre-proposal_conference_sign-in.pdf PDF
Questions_and_Answers.docx DOCX document
Questions_and_Answers.docx DOCX document
Amendment_0001.pdf PDF
J-1_NDA.docx DOCX document
J-3__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Solicitation_N32205-17-R-4900.pdf PDF
J-2_Past_Performance_Data.docx DOCX document
J-5_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J-4.xlsx XLSX spreadsheet
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-17-R-4900

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Norfolk, VA (LOT A)

FFP

Norfolk, VA (LOT A) - Base Ordering Period

Straight Time (ST): $_____ x 227,994 = $___________ Overtime (OT): $______ x 22,799 = $___________ Premium Time (PT): $_______ x 4,560 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $3,419,908.92 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

FOB: Destination

NET AMT

PSC Code: J998

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Norfolk, VA (LOT A) Growth

Norfolk, VA (LOT A) Growth - Base Ordering Period

Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $683,981.78 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

East Coast (LOT B)

East Coast (LOT B) - Base Ordering Period

Straight Time (ST): $_____ x 3,420 = $___________ Overtime (OT): $______ x 342 = $___________ Premium Time (PT): $_______ x 68 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $51,298.63 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

East Coast (LOT B) Growth

East Coast (LOT B) Growth - Base Ordering Period

Additional Government Requirements (AGR) Labor $_____ x 684 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $10,259.73 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Norfolk, VA (LOT A)

FFP

Norfolk, VA (LOT A) - Optional Ordering Period 1

Straight Time (ST): $_____ x 227,994 = $___________ Overtime (OT): $______ x 22,799 = $___________ Premium Time (PT): $_______ x 4,560 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $3,507,800.58 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Norfolk, VA (LOT A) Growth

FFP

Norfolk, VA (LOT A) Growth - Optional Ordering Period 1

Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $701,560.12 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
East Coast (LOT B)

FFP

East Coast (LOT B) - Optional Ordering Period 1

Straight Time (ST): $_____ x 3,420 = $___________ Overtime (OT): $______ x 342 = $___________ Premium Time (PT): $_______ x 68 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $52,617.01 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
East Coast (LOT B) Growth

FFP

East Coast (LOT B) Growth - Optional Ordering Period 1

Additional Government Requirements (AGR) Labor $_____ x 684 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $10,523.40 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Norfolk, VA (LOT A)

FFP

Norfolk, VA (LOT A) - Optional Ordering Period 2

Straight Time (ST): $_____ x 227,994 = $___________ Overtime (OT): $______ x 22,799 = $___________ Premium Time (PT): $_______ x 4,560 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $3,597,951.06 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Norfolk, VA (LOT A) Growth

FFP

Norfolk, VA (LOT A) Growth - Optional Ordering Period 2

Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $719,590.21 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
East Coast (LOT B)

FFP

East Coast (LOT B) - Optional Ordering Period 2

Straight Time (ST): $_____ x 3,420 = $___________ Overtime (OT): $______ x 342 = $___________ Premium Time (PT): $_______ x 68 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $53,969.27 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
East Coast (LOT B) Growth

FFP

East Coast (LOT B) Growth - Optional Ordering Period 2

Additional Government Requirements (AGR) Labor $_____ x 684 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $10,793.85 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Norfolk, VA (LOT A)

FFP

Norfolk, VA (LOT A) - Optional Ordering Period 3

Straight Time (ST): $_____ x 227,994 = $___________ Overtime (OT): $______ x 22,799 = $___________ Premium Time (PT): $_______ x 4,560 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $3,690,418.40 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Norfolk, VA (LOT A) Growth

FFP

Norfolk, VA (LOT A) Growth - Optional Ordering Period 3

Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $738,083.68 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
East Coast (LOT B)

FFP

East Coast (LOT B) - Optional Ordering Period 3

Straight Time (ST): $_____ x 3,420 = $___________ Overtime (OT): $______ x 342 = $___________ Premium Time (PT): $_______ x 68 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $55,356.28 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
East Coast (LOT B) Growth

FFP

East Coast (LOT B) Growth - Optional Ordering Period 3

Additional Government Requirements (AGR) Labor $_____ x 684 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $11,071.26 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Norfolk, VA (LOT A)

FFP

Norfolk, VA (LOT A) - Optional Ordering Period 4

Straight Time (ST): $_____ x 227,994 = $___________ Overtime (OT): $______ x 22,799 = $___________ Premium Time (PT): $_______ x 4,560 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $3,785,262.15 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Norfolk, VA (LOT A) Growth

FFP

Norfolk, VA (LOT A) Growth - Optional Ordering Period 4

Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $757,052.43 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
East Coast (LOT B)

FFP

East Coast (LOT B) - Optional Ordering Period 4

Straight Time (ST): $_____ x 3,420 = $___________ Overtime (OT): $______ x 342 = $___________ Premium Time (PT): $_______ x 68 = $___________ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $56,778.93 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
East Coast (LOT B) Growth

FFP

East Coast (LOT B) Growth - Optional Ordering Period 4

Additional Government Requirements (AGR) Labor $_____ x 684 = $_______ Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):

____% x $11,355.79 = $_____________ (This blank should be the markup plus the ODC base)

Total: $___________

Notes:

(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.

(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.

(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.

(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.

(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.