Amendment_0005.pdf
PDF 132 KB Posted
- Attached to
- East Coast GSR Federal contract opportunity
- Solicitation number
- N32205-17-R-4900
About this file
Amendment 0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.docx | DOCX document | |
| Revised_Section_B.docx | DOCX document | |
| Questions_and_Answers.docx | DOCX document | |
| Amendment_0003.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| Amendment_0002.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| pre-proposal_conference_sign-in.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| Questions_and_Answers.docx | DOCX document | |
| Amendment_0001.pdf | ||
| J-2_Past_Performance_Data.docx | DOCX document | |
| J-3__PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document | |
| Solicitation_N32205-17-R-4900.pdf | ||
| J-1_NDA.docx | DOCX document | |
| J-5_Disclosure_of_Lobbying_Activities_SF-LLL.doc | DOC document | |
| J-4.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-17-R-4900
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1) Revise the CLIN descriptions (Revise Note 4 and Add Note 5)
2) Revise CLIN 2001 ODC Base Amount
3) Revise B-1, "Completion Instructions"
4) Revise C-1 paragraph 6.5 and C-2, "Ship & Base Access," regarding EPIC Instructions
5) Revise H-2, "Delivery Order Grow th (CLINS X002 and X004)," paragraph (b)
6) Add H-13, "Rolling Admission for Future Additional GSR IDIQ Holders"
7) Add H-14, "Government Furnished Property (GFP)"
8) Allow for submission of Final Proposal Revisions to be submitted no later than 22 February 2018 at 4:30 PM local time, Norfolk, VA. See, "Requirements for Submission of Final Proposal Revisions," for further submission instructions. If a Final Proposal Revision is not submitted by this deadline, then the Government w ill only consider the initial proposal for aw ard consideration.
9) All other terms and conditions of the original solicitation and amendments issued to date remain unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 50
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N32205-17-R-4900
X 9B. DATED (SEE ITEM 11)
26-Sep-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Feb-2018
CODE
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C STREET, BLDG SP-64 NAVAL STATION N
NORFOLK VA 23511-2419
N32205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Norfolk, VA (LOT A) - Base Ordering PeriodStraight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,419,908.92 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm up to this CLIN total amount.
To:
Norfolk, VA (LOT A) - Base Ordering PeriodStraight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,419,908.92 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.
CLIN 0002
Norfolk, VA (LOT A) Growth - Base Ordering PeriodAdditional Government Requirements (AGR) Labor $_____ x 45,599 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $683,981.78 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower.
These rates are firm up to this CLIN total amount.
Norfolk, VA (LOT A) Growth - Base Ordering PeriodAdditional Government Requirements (AGR) Labor $_____ x 45,599 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $683,981.78 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower.
These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.
CLIN 0003
East Coast (LOT B) - Base Ordering PeriodStraight Time (ST): $_____ x 3,420 = $___________Overtime (OT): $______ x 342 = $___________Premium Time (PT): $_______ x 68 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):
____% x $51,298.63 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm up to this CLIN total amount.
East Coast (LOT B) - Base Ordering PeriodStraight Time (ST): $_____ x 3,420 = $___________Overtime (OT): $______ x 342 = $___________Premium Time (PT): $_______ x 68 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):
____% x $51,298.63 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not
CLIN 0004
East Coast (LOT B) Growth - Base Ordering PeriodAdditional Government Requirements (AGR) Labor $_____ x 684 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $10,259.73 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower.
These rates are firm up to this CLIN total amount.
East Coast (LOT B) Growth - Base Ordering PeriodAdditional Government Requirements (AGR) Labor $_____ x 684 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $10,259.73 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower.
These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.
CLIN 1001
Norfolk, VA (LOT A) - Optional Ordering Period 1Straight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,507,800.58 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm up to this CLIN total amount.
Norfolk, VA (LOT A) - Optional Ordering Period 1Straight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,507,800.58 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall GSR maximum.
CLIN 1002
Norfolk, VA (LOT A) Growth - Optional Ordering Period 1Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $701,560.12 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates.
The actual distribution of man-hours and ODC may be higher or lower. These rates are firm up to this CLIN total amount.
Norfolk, VA (LOT A) Growth - Optional Ordering Period 1Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $701,560.12 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates.
The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not
CLIN 1003
East Coast (LOT B) - Optional Ordering Period 1Straight Time (ST): $_____ x 3,420 = $___________Overtime (OT): $______ x 342 = $___________Premium Time (PT): $_______ x 68 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):
____% x $52,617.01 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
East Coast (LOT B) - Optional Ordering Period 1Straight Time (ST): $_____ x 3,420 = $___________Overtime (OT): $______ x 342 = $___________Premium Time (PT): $_______ x 68 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):
____% x $52,617.01 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall
CLIN 1004
East Coast (LOT B) Growth - Optional Ordering Period 1Additional Government Requirements (AGR) Labor $_____ x 684 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $10,523.40 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
East Coast (LOT B) Growth - Optional Ordering Period 1Additional Government Requirements (AGR) Labor $_____ x 684 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $10,523.40 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall
CLIN 2001
Norfolk, VA (LOT A) - Optional Ordering Period 2Straight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,597,957.06 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
Norfolk, VA (LOT A) - Optional Ordering Period 2Straight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,597,951.06 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall
CLIN 2002
Norfolk, VA (LOT A) Growth - Optional Ordering Period 2Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $719,590.21 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates.
Norfolk, VA (LOT A) Growth - Optional Ordering Period 2Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $719,590.21 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates.
The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not
CLIN 2003
East Coast (LOT B) - Optional Ordering Period 2Straight Time (ST): $_____ x 3,420 = $___________Overtime (OT): $______ x 342 = $___________Premium Time (PT): $_______ x 68 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):
____% x $53,969.27 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
East Coast (LOT B) - Optional Ordering Period 2Straight Time (ST): $_____ x 3,420 =
$___________Overtime (OT): $______ x 342 = $___________Premium Time (PT): $_______ x 68 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):
____% x $53,969.27 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall
CLIN 2004
East Coast (LOT B) Growth - Optional Ordering Period 2Additional Government Requirements (AGR) Labor $_____ x 684 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $10,793.85 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
East Coast (LOT B) Growth - Optional Ordering Period 2Additional Government Requirements (AGR) Labor $_____ x 684 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $10,793.85 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall
CLIN 3001
Norfolk, VA (LOT A) - Optional Ordering Period 3Straight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,690,418.40 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
Norfolk, VA (LOT A) - Optional Ordering Period 3Straight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,690,418.40 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall
CLIN 3002
Norfolk, VA (LOT A) Growth - Optional Ordering Period 3Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $738,083.68 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates.
Norfolk, VA (LOT A) Growth - Optional Ordering Period 3Additional Government Requirements (AGR) Labor $_____ x 45,599 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $738,083.68 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates.
The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not
CLIN 3003
East Coast (LOT B) - Optional Ordering Period 3Straight Time (ST): $_____ x 3,420 = $___________Overtime (OT): $______ x 342 = $___________Premium Time (PT): $_______ x 68 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):
____% x $55,356.28 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
East Coast (LOT B) - Optional Ordering Period 3Straight Time (ST): $_____ x 3,420 = $___________Overtime (OT): $______ x 342 = $___________Premium Time (PT): $_______ x 68 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit):
____% x $55,356.28 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall
CLIN 3004
East Coast (LOT B) Growth - Optional Ordering Period 3Additional Government Requirements (AGR) Labor $_____ x 684 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $11,071.26 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
East Coast (LOT B) Growth - Optional Ordering Period 3Additional Government Requirements (AGR) Labor $_____ x 684 = $_______Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $11,071.26 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling amount.(4) The number of man-hours and ODC base are estimates. The actual distribution of man-hours and ODC may be higher or lower. These rates are firm for the entirety of this ordering period.(5) The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall
CLIN 4001
Norfolk, VA (LOT A) - Optional Ordering Period 4Straight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,785,262.15 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year. The actual ordering period maybe less than this one (1) year period as dictated by the CLIN ceiling
Norfolk, VA (LOT A) - Optional Ordering Period 4Straight Time (ST): $_____ x 227,994 = $___________Overtime (OT): $______ x 22,799 = $___________Premium Time (PT):
$_______ x 4,560 = $___________Other Direct Cost (ODC) Markup Rates (to include G&A and Profit): ____% x $3,785,262.15 = $_____________ (This blank should be the markup plus the ODC base) Total: $___________Notes:(1) The above rates will apply to each delivery order and any pertaining modifications. The Contractor may offer lower rates when proposing for a delivery order, in which case the lower rates shall apply, but only to the delivery order (including any modifications) for which the rates were offered.(2) Any discrepancy between the figures in this CLIN and the J-4 Attachment shall be resolved by giving precendence to this CLIN.(3) The ordering period shall not exceed one (1) year in length beginning at the conclusion of the previous ordering period. The period of performance reflected in the delivery information section of the contract reflects an ordering period that encompasses the full one (1) year.