MTW_FY17_ESLP_Availability _Cover_Sheet_and_Work_Item_Index.docx.pdf
PDF 130 KB Posted
- Attached to
- USS MT. WHITNEY Industry Day Federal contract opportunity
- Solicitation number
- N32205-16-R-4601
About this file
MTW Cover Sheet WI Index
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Synopsis_of_Critical_Path_Items.docx | DOCX document | |
| MTW_Industry_Day_Reference_Example.zip | ZIP file | |
| LCC_20_Industry_Day _Contracting_Overview.pptm | PPTM file | |
| Work_Items_0000 _0100_and_0900.pdf | ||
| LCC_20_Industry_Day _Engineering_Overview _FY17 _rev_2.pptx | PPTX presentation | |
| Industry_Day_Agenda_02_Feb_2016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
NORFOLK, VIRGINIA
S P E C I F I C A T I O N S
FOR
USS MOUNT WHITNEY
USCG No. N/A
ABS ID No.: 71213053
Solicitation No.: N32205-16-R-4601
DEC 2016
FY17 ESLP AVAILABILITY
PRINCIPAL DIMENSIONS
LENGTH.........................................627 ft 03 in
BREADTH MOLDED..................................82 ft 00 in
BREADTH MAIN DECK..............................108 ft 00 in
FULL LOAD WL................................24 ft 09 in ABL
EST DISPLACEMENT UPON ARRIVAL..............18,893 LONG TONS
THIS SPECIFICATION CONSISTS OF THE FOLLOWING PAGES
WORK ITEMS INDEX.............................PAGES 2 THRU 6
WORK ITEMS.........................PAGES 0001-1 THRU 0920-13
USS MT WHITNEY
(LCC-20)
WORK ITEM INDEX N32205-16-R-4601
000 GENERAL REQUIREMENTS
Item Title Pages
0001 INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS 1 to 20
0002 TECHNICAL AND MANUFACTURER’S REPRESENTATIVES 1 to 4
0003 APPROACH, BERTH, AND MOORING REQUIREMENTS 1 to 4
0004 TESTING AND QUALITY ASSURANCE 1 to 14
0005 ELECTRICAL SAFETY PROCEDURE REQUIREMENTS 1 to 3
0006 HEAVY WEATHER PLAN 1 to 5
0007 COLD WEATHER PLAN 1 to 7
0010 FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) 1 to 7
0011 FURNISH GENERAL SERVICES 1 to 25
0012 TELEPHONE SERVICES 1 to 4
0013 PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS 1 to 7
0014 PREPARATION OF WEIGHT AND MOMENT REPORT 1 to 4
0015 INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS 1 to 14
0016 FIRE PROTECTION AND SHIP’S SAFETY PROGRAM 1 to 7
0017 HANDLING SHIP’S STORES 1 to 3
0018 DELIVERY AND REDELIVERY OF THE VESSEL 1 to 3
0019 SHIPBOARD ACCESS AND SECURITY 1 to 8
0020 GAS FREE CERTIFICATES 1 to 3
0021 CLEAN AND GAS FREE TANKS, VOIDS, & COFFERDAMS 1 to 12
0022 DOCK AND SEA TRIALS 1 to 5
0023 HAZARDOUS WASTE DISPOSAL (CAT B) 1 to 12
0024 PHYSICAL SECURITY OF MTW VESSEL, FP BRAVO (CAT B) 1 to 5
0026 Office Spaces and Services for USN Staff, (CAT B) 1 to 5
0028 Provide Berthing Vessel, Pier & Force Protection (CAT B) 1 to 18
0029 Food Service for US Navy Personnel(CAT B) 1 to 2
0030 Food Cost for US Navy Personnel (CAT B) 1 to 2
0031 Continuation of Services (CAT B) 1 to 2
0032 Temporary Air Conditioning for Spaces, (CAT B) 1 to 2
0033 Additional Security for Vessel, FP CHARLIE (CAT B) 1 to 4
0100 HULL STRUCTURE
0101 Tanks Inspection 1 to 8
0102 Laundry and Structural Fire Protection
0103 Freeboard and Hawse Pipe Preservation 1 to 9
0104 Ultrasonic Hull Gaugings 1 to 4
0105 Tanks and Void Preservation 1 to 6
0106 Helo Deck Gutter Install (T Alt 1059K) 1 to
0107 RHIB and Davit Install 1 to 8
0108 Vessel Incline Survey 1 to 13
0109 Steel Replacement Machinery and Equipment Foundations 1 to 4
0110 Steel Replacement Fan Rooms – Phase III 1 to 4
Steel Replacement Mooring Station Hatch Repairs, VRR 14-
1 to 5
0112 Steel Replacement Forced Draft Blower Uptake Space 1 to 6
Steel Replacement Oily Waste Holding Tank and Waste Oil
Holding Tank 1 to 6
0114 Steel Replacement Cross Flooding Duct 1 to 6
0115 Steel Replacement Inner Bottom Plating Engineroom 1 to 6
0116 Steel Replacement Inner Bottom Plating Fireroom 1 to 6
0117 Steel Replacement Anchor Line Handling Space 1 to 6
0118 Steel Replacement Bulkhead 118, Shaft Alley 1 to 6
0119 Steel Replacement CHT Tanks 1 to 6
0120 Steel Replacement in Trunk 4-143-1-T 1 to 6
0121 Steel Replacement and Preservation Cargo Elevator 1 to
0122 Steel Replacement Overboard Discharges and Sea Chests 1 to 8
0123 Steel Replacement Port and Stbd Sponson 1 to 7
0124 Steel Replacement to Locked-In Ballast Tanks, 9-86-5/6 1 to 6
0125 Steel Replacement to Main Deck 1 to 6
0126 Steel Replacement Sideshell, (Indents) 1 to 7
0200 PROPULSION MACHINERY
0201 Main Reduction Gears Inspection 1 to 6
0202 Coffin Feed Pumps Overspeed Trip Calibration 1 to
0203 Main Reduction Sump Foundation Repairs 1 to 4
0204 Redundant Cooling Wtr Supply to Main Engine 1 to 3
0205 Refurbish Boiler Burner Registers, VR14-065 1 to 2
0206 Port Stbd Boiler Sootblower Repairs, VR14-044 1 to 4
0207 Asbestos Removal Engine Room, (CAT B) 1 to
0208 UT Boiler Blowdown and Sootblower Piping, VR14-035 & 027 1 to
0209 Overhaul 1A Boiler Main Feed Stop Vlv 1 to 3
0210 1A and 1B Boiler Brickwork Repairs 1 to 5
0211 Replace Boiler Blowdown and Sootblower Piping (CAT B)
0212 Main and Aux Steam Piping Replacement (CAT B)
0213 Various Steam Valves Replacement
0214 Steel Repairs to Boiler Foundation
0215 Main and Aux Steam Piping UT
0216 Main and Aux Steam Safety and Relief Valves
0300 ELECTRICAL SYSTEMS
0301 Cleaning various Electrical Load Centers(CAT B) 1 to 5
0302 1 to
0303 Repairs to various Motors (CAT B) 1 to 6
0304 Multi-Cable Transit Installation (CAT B) 1 to 7
0305 Load Center 32A and 32B CB Replacement 1 to 5
0306 Replace Refrigerant Monitors 1 to 5
0307 Ballast Tank TLI Installation 1 to 6
0308 Forced Draft Blower Motor and Controller Replacement 1 to 5
0309 Waterwash 1C Turbine Generator Electrical End, VR14-034 1 to 6
0310 Diesel Generator A and B Dip and Bake
1 to 3
0400 ELECTRONICS
0401 Vessel Control System (VCS) Upgrades (CAT B) 1 to 12
0402 Gyro Repeater Installation 1 to 5
0403 TLI System on VCS 1 to 3
0404 HMI In Cargo Mate and Bridge 1 to 5
0405 Flooding Alarm Upgrades
0406 RO Unit Serial Link and Sensor Install
0500 MACHINERY AND AUXILIARIES
0501 Hotel Steam Valve Replacement 1 to 7
0502 Auxiliary Condensate Pump and Motor Replacement 1 to 7
0503 Incinerator Installation 1 to 4
0504 CHT Cross Connect Tank Installation 1 to 11
0505 CHT Piping Cleaning 1 to 11
0506 Clean and Preserve Machinery Space Bilges 1 to 9
0507 Port Side SS/EDG Room Void De-Water Pipe Removal 1 to 4
0508 SS/EDG Racor Differential Pressure Sensor Install 1 to 2
0509 Aux Boiler Blowdown Piping Mod
0510 Fuel Oil Purifier Piping and Coaming Install
0511 Lube Oil Transfer Pump Relocation
0512 Wire Rope Renewal, Cargo Elevator
0513 CHT Piping Replacement (CAT B)
0514 Water Heating System Upgrades
0515 Potable Water System Upgrades
0516 Sea Water Strainer Installation
0600 OUTFIT, FURNISHINGS, HABITABILITY
0601 MSC Hab Mods Crew Lounge
0602 MSC Hab Mods Group 1
0603 MSC Hab Mods Group 2 1 to 7
0604 MSC Hab Mods Group 3 1 to 10
0605 MSC Hab Mods Group 4 1 to 8
0606 MSC Hab Mods Group 5
0607 MSC Hab Mods Tech Library
0608 Navy Hab Mods Group 6
0609 Navy Hab Mods Group 7
0610 Navy Hab Mods Group 8
0611 Navy Hab Mods Group 9
0612 Navy Hab Mods Group 10
0613 Midships AC Space Access
0614 Anti-Roll Tank Removal / Strm Install
0615 MSC Strm Mods
0616 Gym Install
0617 Steering Gear Space Access
0618 Deck Covering Replacement Phase III – Wet Spaces
0619 CBR-D Storeroom Installation 1 to 5
0620 Captain’s Galley Modifications
0621 C/E Office & Stateroom Modifications
0622 1 st Engineer Stateroom Modifications
0623 Medical Space Upgrades
0624 CHT Crossover Tanks and Piping 1 to 9
0700 SPONSOR
0701 NMT Installation Support 1 to 6
0702 C5I Offices, Laydown and Admin Support
0703 Overhaul CWIS
0704 CBSP Installation Support
0705 CANES Installation Support
0706 Asbestos Testing for C5I
0800 HEATING, VENTILATION AND AIR CONDITIONING
0801 HVAC Equipment Replacement Phase 3 1 to 4
0802 HVAC Ducting Replacement, (CAT B) 1 to 5
0900 DOCKING UNDOCKING
Item Title Pages
0901 Docking and Undocking 1 to 22
0902 Sea Valve and Waste Piece Inspection and Repair 1 to 7
0903 UW Hull Preservation 1 to 15
0904 Bilge Keel Cleaning and Preservation 1 to 3
Anchors, Anchor Chains & Locker Inspections &
Preservation 1 to 7
0906 Impressed Current Cathodic Protection System 1 to 4
0907 Propeller and Propeller Shaft Removal and Inspection 1 to 3
0908 Propeller Shaft Refurbishment 1 to 8
0909 Stern Tube Shaft and Bearings Removal and Inspection 1 to 9
0910 Stern Tube Shaft Refurbishment 1 to 5
0911 Stern Tube Bearings and Bearing Carriers Replacement 1 to 8
0912 Stern Tube Assembly Steel Replacement 1 to 11
0913 Rudder Stock Removal and Stern Frame Inspection 1 to 9
0914 Rudder Stock Refurbishment 1 to 7
0915 Rudder Blue Fit and Retaining Key 1 to 9
0916 Rudder Upper Bearing Replacement 1 to 4
0917 Rudder Lower Bearing Seal Modifications 1 to 8
0918 Install O-ring Seal at the Rudder/Stock Joint 1 to 5
0919 Line Shaft Bearing alignment checks and correction 1 to 7
0920 Shaft Alignment Checks 1 to 13