USS MOUNT WHITNEY (LCC 20)

INDUSTRY DAY AGENDA

Solicitation No: N32205-16-R-4601

Date: 02 February 2016 Time: 0800 – 1600 Location: Hotel Flamingo, Gaeta, Italy

1. Introductions, (08:00 - 08:05)

MSC Team Introductions

Shipyard Representatives

2. Administrative, (08:05 - 08:10)

Breaks/Lunch, Bathrooms

3. Contracting Overview/Presentation, (08:10 - 09:45):

Industry Day Disclaimer

Purpose of Industry Day

Contracting Presentation

Contract Award and Post Award Conference

Category A Work Items, Category B Work Items

4. Break, (9:45-10:00):

5. 0700 Series Communication Work Items Overview (C5I), (10:00 – 11:00)

Brief description CANES, NMT, CBSP

Alteration Installation Team (AIT)

Shipyard Requirements o Remove existing equipment foundations, prep locations for new installation, fabricate and install various equipment foundations, asbestos abatement in way of equipment installations, welding, insulation/lagging, painting, crane lifts, storage space, laydown area and office spaces

Production Schedule and Shipyard’s Resource Loading

6. Berthing Barge for US Navy Personnel, (11:00 – 11:30)

Duration 190 Days for 170 USN Personnel

Requirements will be described in (3) Work Items o WI 0028 Berthing Barge, Pier, General Services, Force Protection, Internet, Conference Rooms, Offices, Laundry Machines, Computers, LAN o WI 0029, Provide Food Service o WI 0030, Provide Food Cost

7. Lunch Break, (11:30-12:30):

8. Engineering Work Items, (12:30 – 14:00)

USS MOUNT WHITNEY (LCC 20)

INDUSTRY DAY AGENDA

Solicitation No: N32205-16-R-4601

Presentation/Overview

Discussion 0900 Series Docking/Undocking and Shafting o Docking Period Duration, (approximately 131 days) o Propeller Shaft o Stern Tube Shaft o Stern Tube o Machining Stern Tube Bearing Carrier Lands o Total Shafting Alignment Checks o Rudder Stock Repairs

Discussion Habitability Mods o Open Berthing Living Spaces o Open Berthing Wet Spaces o GFM Laydown Area o Assembly of GFM

Discussion Steel Repairs o Side Shell, Sponsons, Fan Rooms, Main Deck, Ballast Tanks o Reduction Gear Foundation o Boiler Foundation o Fan Rooms o Engineroom Spaces, Bulkhead 118

Discussion other Misc Work Items o Remove Refurbish 1C SSTG o Incinerator Installation o Potable Water Heating and Circulation System Upgrades o Gym and Crew Lounge Modifications o Anti-Roll Tank Removal o Storeroom Installation and Modifications o RHIB Installation

9. Break, (14:00 - 14:15)

10. Continue Engineering Discussions, (14:15 – 16:00)

11. Closing Remarks and Adjournment (1600):