Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | OTHER COSTS | TOTAL PRICE | ||||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | |||||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | |||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | |||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | |||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | |||||||||||
| 006 | HEAVY WEATHER PLAN | |||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 102 | ACCOM LADDER INSP/ WEIGHT TEST | |||||||||||
| 103 | KING POST TEST | |||||||||||
| 104 | KING POST SUPPORT BRACKET | |||||||||||
| 105 | MISC. TANK REPAIR | |||||||||||
| 106 | ABS SPECIAL SURVEY | |||||||||||
| 107 | INSPECTION OF PV VALVES ABS & USCG | |||||||||||
| 108 | 2C DBL BOTTOM BALLAST TANK PRESERV | |||||||||||
| 109 | POTABLE WATER TANK PRESERVATION | |||||||||||
| 200 | MACHINERY PROPULSION | |||||||||||
| 201 | INSPECT & OVERHL PORT STBD PTO | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | CLEANING OF MAIN SWTCHBD & CONTROLERS | |||||||||||
| 302 | OVRHL SWTCHBD CIRCUIT BREAKER | |||||||||||
| 303 | CARGO CONSOL WIRE REPLACMENT | |||||||||||
| 304 | CARGO CONSOL MECHANICAL SUPPORT | |||||||||||
| 305 | CARGO CONSOL PAINTING | |||||||||||
| 306 | SHIPBOARD INSTALATION OF CARGO CONSOL SYSTEM | |||||||||||
| 307 | SHORE PWR METER CONSUMTIONMETER TALT | |||||||||||
| 400 | ELECTRONICS, COMMUNICATION & NAVIGATIONAL AIDS | |||||||||||
| 401 | RADAR-ECDIS PREVENTIVITVE MAINT | |||||||||||
| 402 | ANNUAL GMDSS SAFETY RADIO CERT | |||||||||||
| 403 | SVDR RECERTIFICATION | |||||||||||
| 404 | OE-82 UHF SATCOM ANTENNA OVRHL | |||||||||||
| 405 | HV TRANSMITTER GROOM | |||||||||||
| 406 | DTS SYSTEM GROOM | |||||||||||
| 500 | MACHINERY, AUX SYSTEMS | |||||||||||
| 501 | MISC. PIPE REPAIR | |||||||||||
| 502 | AUX BOILER GROOM | |||||||||||
| 503 | STEERING PUMP OVERHL | |||||||||||
| 600 | OUTFITTING, FURNISHING & HABITABILITY | |||||||||||
| 601 | LIFE RAFT RECERTIFICATION | |||||||||||
| 602 | ANNUAL INSPECTION OF LIFEBOAT & HOOKS | |||||||||||
| 603 | INSPECT, SERVICE & RECERTIFY RESCUE BOATS | |||||||||||
| 604 | RECERTIFICATION OF LIFEBOAT DAVITS | |||||||||||
| 605 | ANNUAL FIREFIGHTING RECERTIFICATION | |||||||||||
| 606 | SCBA RECERTIFICATION | |||||||||||
| 607 | SCBA COMPRESSOR SERVICING | |||||||||||
| 608 | RESCUEBOAT DAVIT & WINCH ANNUAL | |||||||||||
| 609 | ELEVATOR ANNUAL CERTIFICATION | |||||||||||
| 610 | JOINER BULK REPLACEMENT | |||||||||||
| 611 | LIFEBOAT HOOK INSTALLATION | |||||||||||
| 800 | HEATING, VENTILATION, & AIR CONDITIONING | |||||||||||
| 801 | GALLEY RANGE MISC. EXHAUST | |||||||||||
| 802 | HOUSE VENTILATION CLEANING | |||||||||||
| 803 | LAUNDRY VENTILATION CLEANING | |||||||||||
| 900 | DOCKING/UNDOCKING | |||||||||||
| 901 | DRYDOCKING/UNDOCKING OF THE VESSEL | |||||||||||
| 903 | UNDERWATER HULL PRESERVATION | |||||||||||
| 904 | FREEBOARD PRESERVATION | |||||||||||
| 905 | BILDGE, KEEL, CLEANING & PRESERVATION | |||||||||||
| 906 | PAINT ANCHORS & CLEAN LOCKERS | |||||||||||
| 907 | PROPELLOR, SHAFT, WEAR DOWN READINGS | |||||||||||
| 908 | OVRHL SEA VALVES | |||||||||||
| 909 | RUDDER STERN FRAME EXAM | |||||||||||
| 910 | PROPELLOR MAINT | |||||||||||
| 911 | MARINE GROWTH INHIBITOR REPLACMENT | |||||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1001 | REFURBISH HIGHLINE/CARGO WINCH & MOTORS | |||||||||||
| 1002 | REFURBISH HAULING WINCH ASSY & MOTORS | |||||||||||
| 1003 | AUTOMATIC RAM CONTROL (ARC) REMOVAL/INSTALL | |||||||||||
| 1004 | UNREP PRESSURE VESSEL/RELIEF VAVLE REPAIR CERT | |||||||||||
| 1005 | REFURBISHMENT SADDLE WINCH SPEED, BLOCK/SPAN WINCH | |||||||||||
| TOTAL |
| USNS RAPPAHANNOCK (T-AO 204) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-15-R-1009 |
ATTACHMENT J-2
Item Cost
| CATEGORY “A” ITEMS | IGE Cost | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | OTHER COSTS | TOTAL PRICE | |||||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | |||
| CATEGORY "A" | |||||||||||||
| 000 | GENERAL REQUIREMENTS | ||||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | ||||||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | ||||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | ||||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | ||||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | ||||||||||||
| 006 | HEAVY WEATHER PLAN | ||||||||||||
| 007 | COLD WEATHER PLAN | ||||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | ||||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | ||||||||||||
| 012 | TELEPHONE SERVICES | ||||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | ||||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | ||||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | ||||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | ||||||||||||
| 017 | HANDLING SHIP'S STORES | ||||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | ||||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | ||||||||||||
| 020 | GAS FREE CERTIFICATES | ||||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | ||||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | ||||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL | ||||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | ||||||||||||
| 100 | HULL STRUCTURES | ||||||||||||
| 101 | NDT KING POSTS | ||||||||||||
| 102 | PW TANK PRESERVATION (ABS INSPECTION) | ||||||||||||
| 103 | PUMP ROOM BILGE PRESERVATION | ||||||||||||
| 104 | INTERIOR DOORS AND FRAMES; REPLACE | ||||||||||||
| 105 | REPLACE VARIOUS PIPING | ||||||||||||
| 106 | TANK DECK OVERHEAD PRESERVATION | ||||||||||||
| 107 | NON-SKID DECK RESURFACING | ||||||||||||
| 108 | LIFEBOAT DECK OVERHEAD REPAIRS | ||||||||||||
| 109 | 01 DECK EXPANSION JOINT REPAIRS | ||||||||||||
| 110 | STRUCTURAL STEEL REPAIRS | ||||||||||||
| 200 | MACHINERY PROPULSION | ||||||||||||
| 201 | PORT AND STBD MAIN ENGINE 72,000 HOUR OVERHAUL | ||||||||||||
| 202 | PORT AND STARBAORD ME COUPLING REPLACEMENT/MODIFICATION | ||||||||||||
| 203 | ERC UPS REPLACEMENT | ||||||||||||
| 204 | MAIN SEAWATER STRAINER/VALVE REPAIR (VRR 15-011/012) | ||||||||||||
| 300 | ELECTRICAL | ||||||||||||
| 301 | CLEANING SWITCHBOARDS AND CONTROL CENTERS | ||||||||||||
| 302 | OVERHAUL CIRCUIT BREAKERS | ||||||||||||
| 303 | MOTOR REPAIRS | ||||||||||||
| 304 | PTO TECHNICAL REPRESENTATIVE | ||||||||||||
| 400 | ELECTRONICS, COMMUNICATION & NAVIGATIONAL AIDS | ||||||||||||
| 401 | RADAR/ECDIS MAINTENANCE | ||||||||||||
| 402 | NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE | ||||||||||||
| 403 | GMDSS SAFETY RADIO CERTIFICATE | ||||||||||||
| 404 | SVDR RUTTER RECERTIFICATION | ||||||||||||
| 405 | OE-82 UHF SATCOM ANTENNA OVERHAUL | ||||||||||||
| 406 | ANTENNA OVERHAUL | ||||||||||||
| 407 | TV-DTS SYSTEM GROOM | ||||||||||||
| 500 | MACHINERY, AUX SYSTEMS | ||||||||||||
| 501 | AUXILIARY BOILER MAINTENANCE | ||||||||||||
| 502 | SHIPS SERVICE AIR COMPRESSOR SERVICE/GROOM | ||||||||||||
| 503 | SCBA COMPRESSOR/REFILL STATION SERVICING/INSPECTION | ||||||||||||
| 504 | ER OWS AND CARGO OCM GROOM | ||||||||||||
| 505 | CONNEX BOX SERVICE | ||||||||||||
| 506 | A/C & REFRIG COMPRESSOR OVERHAUL | ||||||||||||
| 507 | MLO AND ROCKER ARM LO PUMP OVERHAUL (VR 11-008/010) | ||||||||||||
| 508 | EVAPORATOR REPLACEMENT | ||||||||||||
| 509 | CW PUMP OVERHAUL | ||||||||||||
| 510 | INCINERATOR MAINTENANCE AND ADJUSTMENT | ||||||||||||
| 511 | ME JW COOLER OVERHAUL | ||||||||||||
| 512 | HOT WATER TANK REPLACEMENT | ||||||||||||
| 513 | CLEAN AND INSPECT MSD TANKS | ||||||||||||
| 514 | DECK DRAIN PIPE REPLACEMENT | ||||||||||||
| 515 | T-AO CLASS FUEL SENSOR INSTALLATION | ||||||||||||
| 516 | VARIOUS PUMP OVERHAULS | ||||||||||||
| 600 | OUTFITTING, FURNISHING & HABITABILITY | ||||||||||||
| 601 | FIREFIGHTING EQUIPMENT RECERTIFICATION | ||||||||||||
| 602 | ELEVATOR RECERTIFICATION | ||||||||||||
| 603 | LIFERAFT RECERTIFICATION | ||||||||||||
| 604 | RESCUE BOAT RECERTIFICATION | ||||||||||||
| 605 | RESCUE BOAT WINCH & DAVIT INSPECTION | ||||||||||||
| 606 | LIFEBOAT RECERTIFICATION | ||||||||||||
| 607 | LIFEBOAT WINCH & DAVIT INSPECTION | ||||||||||||
| 608 | INSPECTION OF FIRE HOSES | ||||||||||||
| 609 | INSPECTION OF AFFF HOSES | ||||||||||||
| 610 | STATEROOM CARPET/TILE REPLACEMENT | ||||||||||||
| 611 | HEAD AND SHOWER TERRAZZO REPLACEMENT | ||||||||||||
| 612 | SCBA EQUIPMENT ANNUAL RECERTIFICATION | ||||||||||||
| 613 | TRASHCOMPACTOR REPLACE | ||||||||||||
| 800 | HEATING, VENTILATION, & AIR CONDITIONING | ||||||||||||
| 801 | LAUNDRY VENTILATION SYSTEM CLEANING | ||||||||||||
| 802 | GALLEY RANGE EXAUST SYSTEM CLEANING | ||||||||||||
| 900 | DOCKING/UNDOCKING | ||||||||||||
| 901 | DOCKING AND UNDOCKING | ||||||||||||
| 902 | UNDERWATER HULL CLEANING AND PRESERVATION | ||||||||||||
| 903 | FREEBOARD PRESERVATION | ||||||||||||
| 1000 | UNREP EQUIPMENT | ||||||||||||
| 1001 | REPAIR UNREP BLOCKS AND SHEAVES | ||||||||||||
| 1002 | SLIDING BLOCK LOWER PILLOW BLOCK BEARINGS | ||||||||||||
| 1003 | STATION 3 & 4 SLIDING BLOCK PRESERVATION | ||||||||||||
| 1004 | SADDLE WINCH FOUNDATION REFURBISH | ||||||||||||
| 1005 | HAULING WINCH CONTROLLEX CABLE PENETRATIONS | ||||||||||||
| 1006 | HIGHLINE WINCH CONTROLLEX CABLE PENETRATIONS | ||||||||||||
| TOTAL |
| USNS BIG HORN (T-AO 198) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-15-R-1011 |