006_Item_506_RFC_Answer.docx

DOCX document 27 KB Posted

Attached to
USNS BIG HORN Regular Overhaul and Dry Dock (ROH-DD)
Solicitation number
N32205-15-R-1011
Issued by

About this file

006 Item 506 RFC Answer

View the file

Other files

File Type Posted
J-3_Category_B_Items_BIG_HORN_Revised_11-9-15.xlsx XLSX spreadsheet
Amedment_0003.doc DOC document
J-2_Category_A_Items_BIG_HORN_Revised_11-9-15.xlsx XLSX spreadsheet
N32205-15-R-1011 _Amendment_2.pdf PDF
UPDATED_J-10 _BIG_HORN_15-R-1011.pdf PDF
009_Item_110_RFC_Answer.docx DOCX document
007_Item_103_RFC_Answer.docx DOCX document
005_Item_203_RFC_Answer.docx DOCX document
008_Item_512_RFC_Answer.docx DOCX document
001_Section_B_RFC_Answer.docx DOCX document
004_Item_508_RFC_Answer.docx DOCX document
003_Item_204_RFC_Answer.docx DOCX document
002_Item_203_RFC_Answer.docx DOCX document
Conformed_Copy_of_Solicitation_through_Amendment_1_-BIG_HORN_N32205-15-R-1011.pdf PDF
Amendment_1-BIG_HORN_N32205-15-R-1011.pdf PDF
SF_33_p1_BIG_HORN_Released.pdf PDF
JnA_BIG_HORN_N32205-15-R-1011-CA-Signed_Redacted_FedBizOps.pdf PDF
J-6_WI_015_CDRL.pdf PDF
J-7_MSC_Ship_Repair_Facility_Survey.docx DOCX document
J-2_Category_A_Items_BIG_HORN.xlsx XLSX spreadsheet
BIG_HORN_Scheduled_Government_Furnished_Property.xls XLS spreadsheet
J-12_Past_Performance_Data.docx DOCX document
LAR_FY15_Interport_Differentials_(3-2-15).xls XLS spreadsheet
J-9_Disclosure_of_Lobbying_Activities_SF-LLL.docx DOCX document
J-8_Request_for_Spec_Clarification.docx DOCX document
BIG_HORN_Solicitation.doc DOC document
J-11_Dry_Dock_Evaluation_Form.docx DOCX document
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J-3_Category_B_Items_BIG_HORN.xlsx XLSX spreadsheet
J-14_Technical_Data_Non-Disclosure_BIG_HORN.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-15-R-1011

USNS BIG HORN (T-AO 198)

REQUEST FOR SPECIFICATION CLARIFICATION

DATE: ___10 September 2015_________________

NAME OF CONTRACTOR: ___ _______________

SPECIFICATION ITEM NO.: ____506_________________

PARAGRAPH / SECTION NO:____various________________

TITLE: ____Air Conditioning (A/C) and Reefer Compressor Overhaul_

QUESTION:

Paragraph 7.3 says to pump all refrigerant into system receiver on a/c unit #1 and refrigeration unit #1. Paragraph 7.7 says to perform a complete system leak test and hold pressure for 12 hours on #1 a/c and #1 reefer.

We can do leak test but it will have to be with refrigerant only. If you put nitrogen into a system with refrigerant that is in the receiver, you will contaminate the refrigerant in the receiver and it will have to be replaced. You could recover all refrigerant out of #1 a/c and #1 reefer systems, but this is not asked for in bid specification.

Paragraph 7.3 says to pump all refrigerant into system receiver on a/c unit #1 and refrigeration unit #1. Paragraph 7.6.1 says to perform vacuum test on #1 a/c and #1 reefer system.

Unless we recover all refrigerant from #1 a/c and #1 reefer system, you only want to pull a vacuum on the new compressor and refrigerant piping that was open to atmosphere.

How should we proceed?

ANSWER: Quote the Work Item as though the refrigerant in both units will be recovered by the contractor using an external recovery unit and clean reclaim bottles.

ATTACHMENT J - 8