Amedment_0003.doc

DOC document 127 KB Posted

Attached to
USNS BIG HORN Regular Overhaul and Dry Dock (ROH-DD)
Solicitation number
N32205-15-R-1011
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
J-3_Category_B_Items_BIG_HORN_Revised_11-9-15.xlsx XLSX spreadsheet
J-2_Category_A_Items_BIG_HORN_Revised_11-9-15.xlsx XLSX spreadsheet
N32205-15-R-1011 _Amendment_2.pdf PDF
UPDATED_J-10 _BIG_HORN_15-R-1011.pdf PDF
009_Item_110_RFC_Answer.docx DOCX document
007_Item_103_RFC_Answer.docx DOCX document
005_Item_203_RFC_Answer.docx DOCX document
008_Item_512_RFC_Answer.docx DOCX document
006_Item_506_RFC_Answer.docx DOCX document
001_Section_B_RFC_Answer.docx DOCX document
004_Item_508_RFC_Answer.docx DOCX document
003_Item_204_RFC_Answer.docx DOCX document
002_Item_203_RFC_Answer.docx DOCX document
Conformed_Copy_of_Solicitation_through_Amendment_1_-BIG_HORN_N32205-15-R-1011.pdf PDF
Amendment_1-BIG_HORN_N32205-15-R-1011.pdf PDF
SF_33_p1_BIG_HORN_Released.pdf PDF
JnA_BIG_HORN_N32205-15-R-1011-CA-Signed_Redacted_FedBizOps.pdf PDF
J-6_WI_015_CDRL.pdf PDF
J-7_MSC_Ship_Repair_Facility_Survey.docx DOCX document
J-2_Category_A_Items_BIG_HORN.xlsx XLSX spreadsheet
BIG_HORN_Scheduled_Government_Furnished_Property.xls XLS spreadsheet
J-12_Past_Performance_Data.docx DOCX document
LAR_FY15_Interport_Differentials_(3-2-15).xls XLS spreadsheet
J-9_Disclosure_of_Lobbying_Activities_SF-LLL.docx DOCX document
J-8_Request_for_Spec_Clarification.docx DOCX document
BIG_HORN_Solicitation.doc DOC document
J-11_Dry_Dock_Evaluation_Form.docx DOCX document
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J-3_Category_B_Items_BIG_HORN.xlsx XLSX spreadsheet
J-14_Technical_Data_Non-Disclosure_BIG_HORN.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

FPR SUMISSION INSTRUCTIONS

REQUIREMENTS FOR SUBMISSION OF FINAL PROPOSAL REVISIONS

The offeror may submit a final revised technical and price proposal in response to the request for final proposal revision submission. In the event that the offeror does not submit a final proposal revisions in part or entirety, the initial proposal will be considered for award in its entirety or those applicable parts not resubmitted. Therefore, an initial acceptable or unacceptable rating and/or price will be carried over for that factor. The final proposal revisions shall be submitted in the following format:

(a) General: Separate electronic files must be submitted with your final proposal revisions: (1) Price/Past Performance and all outstanding Amendments, signed and completed, and (2) Technical. Offerors shall ensure that final proposal revisions disks are virus free, and free of password protection. If access to final proposal revisions data is prohibited due to viruses, passwords, wrong format, the offer may be considered unacceptable.

(b) Offerors shall submit their final proposal revisions to the following address:

Ian.keller@navy.mil

Volume I: Price / Past Performance (as applicable for the final proposal revision submission)

Price

In submission of final proposal revisions, offerors shall follow the price submission guidance from L-2, “Requirements for Submission of Proposals”

Past Performance

Offerors shall provide a written narrative addressing concerns provided during discussions, if any.

Volume II: Technical Proposal

Final proposal revisions shall address concerns stated during discussions, if any. Failure to adequately address concerns in accordance with the discussions conducted and evaluation notices issued may be grounds for an Unacceptable factor rating in accordance with M-3.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0006

This CLIN has been renumbered to CLIN 0007.

CLIN 0006 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 110

FFP

WI 110 - Structural Steel Repairs

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

FOB: Destination

NET AMT

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STANDARD WORK ITEMS INCLUDED

SECTION 000 - GENERAL REQUIREMENTS

001
Intent, Scope, General Requirements and Definitions
“NSP”
002
Technical and Manufacturer's Representatives
“NSP”
003
Approach, Berth, and Mooring Requirements
“NSP”
004
Testing and Quality Assurance
“NSP”
005
Electrical Safety Procedure Requirements
“NSP”
006
Heavy Weather Plan
“NSP”
007
Cold Weather Plan
“NSP”
010
Furnish Office For Overhaul Management Team (OMT)
“A”
011
Furnish General Services (T-AO)
“A”
012
Telephone Services
“A”
013
Project Planning and Production Status Monitoring Reports
“A”
014
Preparation of Weight and Moment Report
“A”
015
Integrated Logistics and GFM Support Requirements
“A”
016
Fire Protection and Ship's Safety Program
“A”
017
Handling Ship's Stores
“A”
018
Delivery and Redelivery of the Vessel
“A”
019
Shipboard Access and Security
“A”
020
Gas Free Certificates
“A”
021
Clean and Gas Free Tanks, Voids, Cofferdams & Spaces
“A”
022
Dock Trials and Sea Trials
"A"
023
Hazardous Waste Disposal
"A"
024
Physical Security at Private Contractor’s Facility
NSP
025
Physical Security at Private Contractor’s Facility in Force Protection Condition Bravo-Delta
“B”
030
Continuation of Services Rev FEB 14
“B”

SECTION 100 - HULL STRUCTURE

101
NDT KING POSTS
“A”
102
PW TANK PRESERVATION (ABS INSPECTION)
“A”
103
PUMP ROOM BILGE PRESERVATION
“A”
104
INTERIOR DOORS AND FRAMES; REPLACE
“A”
105
REPLACE VARIOUS PIPING
“A”
106
TANK DECK OVERHEAD PRESERVATION
“A”
107
NON-SKID DECK RESURFACING
“A”
108
LIFEBOAT DECK OVERHEAD REPAIRS
“A”
109
01 DECK EXPANSION JOINT REPAIRS
“A”
110
STRUCTURAL STEEL REPAIRS
“B”

SECTION 200 – MACHINERY, PROPULSION

201
PORT AND STBD MAIN ENGINE 72,000 HOUR OVERHAUL
“A”
202
PORT AND STARBAORD ME COUPLING REPLACEMENT/MODIFICATION
“A”
203
ERC UPS REPLACEMENT
“A”
204
MAIN SEAWATER STRAINER/VALVE REPAIR (VRR 15-011/012)
“A”

SECTION 300 - ELECTRICAL

301
CLEANING SWITCHBOARDS AND CONTROL CENTERS
“A”
302
OVERHAUL CIRCUIT BREAKERS
“A”
303
MOTOR REPAIRS
“A”
304
PTO TECHNICAL REPRESENTATIVE
“A”

SECTION 400 – COMMUNICATIONS AND NAVIGATIONAL AIDS

401
RADAR/ECDIS MAINTENANCE
“A”
402
NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE
“A”
403
GMDSS SAFETY RADIO CERTIFICATE
“A”
404
SVDR RUTTER RECERTIFICATION
“A”
405
OE-82 UHF SATCOM ANTENNA OVERHAUL
“A”
406
ANTENNA OVERHAUL
“A”
407
TV-DTS SYSTEM GROOM
“A”

SECTION 500 - MACHINERY, AUXILIARY SYSTEM

501
AUXILIARY BOILER MAINTENANCE
“A”
502
SHIPS SERVICE AIR COMPRESSOR SERVICE/GROOM
“A”
503
SCBA COMPRESSOR/REFILL STATION SERVICING/INSPECTION
“A”
504
ER OWS AND CARGO OCM GROOM
“A”
505
CONNEX BOX SERVICE
“A”
506
A/C & REFRIG COMPRESSOR OVERHAUL
“A”
507
MLO AND ROCKER ARM LO PUMP OVERHAUL (VR 11-008/010)
“A”
508
EVAPORATOR REPLACEMENT
“A”
509
CW PUMP OVERHAUL
“A”
510
INCINERATOR MAINTENANCE AND ADJUSTMENT
“A”
511
ME JW COOLER OVERHAUL
“A”
512
HOT WATER TANK REPLACEMENT
“A”
513
CLEAN AND INSPECT MSD TANKS
“A”
514
DECK DRAIN PIPE REPLACEMENT
“A”
515
T-AO CLASS FUEL SENSOR INSTALLATION
“A”
516
VARIOUS PUMP OVERHAULS
“A”

SECTION 600 - OUTFIT, FURNISHING AND HABITABILITY

601
FIREFIGHTING EQUIPMENT RECERTIFICATION
“A”
602
ELEVATOR RECERTIFICATION
“A”
603
LIFERAFT RECERTIFICATION
“A”
604
RESCUE BOAT RECERTIFICATION
“A”
605
RESCUE BOAT WINCH & DAVIT INSPECTION
“A”
606
LIFEBOAT RECERTIFICATION
“A”
607
LIFEBOAT WINCH & DAVIT INSPECTION
“A”
608
INSPECTION OF FIRE HOSES
“A”
609
INSPECTION OF AFFF HOSES
“A”
610
STATEROOM CARPET/TILE REPLACEMENT
“A”
611
HEAD AND SHOWER TERRAZZO REPLACEMENT
“A”
612
SCBA EQUIPMENT ANNUAL RECERTIFICATION
“A”
613
TRASHCOMPACTOR REPLACE
“A”

SECTION 800 –HEATING VENTILATION AND AIR CONDITIONING

801
LAUNDRY VENTILATION SYSTEM CLEANING
“A”
802
GALLEY RANGE EXAUST SYSTEM CLEANING
“A”

SECTION 900 – DRYDOCKING AND UNDOCKING

901
DOCKING AND UNDOCKING
“A”
902
UNDERWATER HULL CLEANING AND PRESERVATION
“A”
903
FREEBOARD PRESERVATION
“A”
904
DRY DOCK CONTINUATION
“B”

SECTION 1000 – UNREP EQUIPMENT

1001
REPAIR UNREP BLOCKS AND SHEAVES
“A”
1002
SLIDING BLOCK LOWER PILLOW BLOCK BEARINGS
“A”
1003
STATION 3 & 4 SLIDING BLOCK PRESERVATION
“A”
1004
SADDLE WINCH FOUNDATION REFURBISH
“A”
1005
HAULING WINCH CONTROLLEX CABLE PENETRATIONS
“A”
1006
HIGHLINE WINCH CONTROLLEX CABLE PENETRATIONS
“A”

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0006:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

23-MAR-2016

N/A
N/A

To:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

22-MAR-2016

N/A
N/A

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0005 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A

The following Delivery Schedule Item has been deleted from CLIN 0006:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A

The following Delivery Schedule item has been added to CLIN 0006:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 11-JAN-2016 TO

N/A
N/A

(End of Summary of Changes)