The file's text, extracted by GovTribe without its formatting.
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
FPR SUMISSION INSTRUCTIONS
REQUIREMENTS FOR SUBMISSION OF FINAL PROPOSAL REVISIONS
The offeror may submit a final revised technical and price proposal in response to the request for final proposal revision submission. In the event that the offeror does not submit a final proposal revisions in part or entirety, the initial proposal will be considered for award in its entirety or those applicable parts not resubmitted. Therefore, an initial acceptable or unacceptable rating and/or price will be carried over for that factor. The final proposal revisions shall be submitted in the following format:
(a) General: Separate electronic files must be submitted with your final proposal revisions: (1) Price/Past Performance and all outstanding Amendments, signed and completed, and (2) Technical. Offerors shall ensure that final proposal revisions disks are virus free, and free of password protection. If access to final proposal revisions data is prohibited due to viruses, passwords, wrong format, the offer may be considered unacceptable.
(b) Offerors shall submit their final proposal revisions to the following address:
Ian.keller@navy.mil
Volume I: Price / Past Performance (as applicable for the final proposal revision submission)
Price
In submission of final proposal revisions, offerors shall follow the price submission guidance from L-2, “Requirements for Submission of Proposals”
Past Performance
Offerors shall provide a written narrative addressing concerns provided during discussions, if any.
Volume II: Technical Proposal
Final proposal revisions shall address concerns stated during discussions, if any. Failure to adequately address concerns in accordance with the discussions conducted and evaluation notices issued may be grounds for an Unacceptable factor rating in accordance with M-3.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0006
This CLIN has been renumbered to CLIN 0007.
CLIN 0006 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 110 |
FFP
WI 110 - Structural Steel Repairs
The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.
FOB: Destination
NET AMT
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STANDARD WORK ITEMS INCLUDED
SECTION 000 - GENERAL REQUIREMENTS
| 001 |
| Intent, Scope, General Requirements and Definitions |
| “NSP” |
| 002 |
| Technical and Manufacturer's Representatives |
| “NSP” |
| 003 |
| Approach, Berth, and Mooring Requirements |
| “NSP” |
| 004 |
| Testing and Quality Assurance |
| “NSP” |
| 005 |
| Electrical Safety Procedure Requirements |
| “NSP” |
| 006 |
| Heavy Weather Plan |
| “NSP” |
| 007 |
| Cold Weather Plan |
| “NSP” |
| 010 |
| Furnish Office For Overhaul Management Team (OMT) |
| “A” |
| 011 |
| Furnish General Services (T-AO) |
| “A” |
| 012 |
| Telephone Services |
| “A” |
| 013 |
| Project Planning and Production Status Monitoring Reports |
| “A” |
| 014 |
| Preparation of Weight and Moment Report |
| “A” |
| 015 |
| Integrated Logistics and GFM Support Requirements |
| “A” |
| 016 |
| Fire Protection and Ship's Safety Program |
| “A” |
| 017 |
| Handling Ship's Stores |
| “A” |
| 018 |
| Delivery and Redelivery of the Vessel |
| “A” |
| 019 |
| Shipboard Access and Security |
| “A” |
| 020 |
| Gas Free Certificates |
| “A” |
| 021 |
| Clean and Gas Free Tanks, Voids, Cofferdams & Spaces |
| “A” |
| 022 |
| Dock Trials and Sea Trials |
| "A" |
| 023 |
| Hazardous Waste Disposal |
| "A" |
| 024 |
| Physical Security at Private Contractor’s Facility |
| NSP |
| 025 |
| Physical Security at Private Contractor’s Facility in Force Protection Condition Bravo-Delta |
| “B” |
| 030 |
| Continuation of Services Rev FEB 14 |
| “B” |
SECTION 100 - HULL STRUCTURE
| 102 |
| PW TANK PRESERVATION (ABS INSPECTION) |
| “A” |
| 103 |
| PUMP ROOM BILGE PRESERVATION |
| “A” |
| 104 |
| INTERIOR DOORS AND FRAMES; REPLACE |
| “A” |
| 105 |
| REPLACE VARIOUS PIPING |
| “A” |
| 106 |
| TANK DECK OVERHEAD PRESERVATION |
| “A” |
| 107 |
| NON-SKID DECK RESURFACING |
| “A” |
| 108 |
| LIFEBOAT DECK OVERHEAD REPAIRS |
| “A” |
| 109 |
| 01 DECK EXPANSION JOINT REPAIRS |
| “A” |
| 110 |
| STRUCTURAL STEEL REPAIRS |
| “B” |
SECTION 200 – MACHINERY, PROPULSION
| 201 |
| PORT AND STBD MAIN ENGINE 72,000 HOUR OVERHAUL |
| “A” |
| 202 |
| PORT AND STARBAORD ME COUPLING REPLACEMENT/MODIFICATION |
| “A” |
| 203 |
| ERC UPS REPLACEMENT |
| “A” |
| 204 |
| MAIN SEAWATER STRAINER/VALVE REPAIR (VRR 15-011/012) |
| “A” |
SECTION 300 - ELECTRICAL
| 301 |
| CLEANING SWITCHBOARDS AND CONTROL CENTERS |
| “A” |
| 302 |
| OVERHAUL CIRCUIT BREAKERS |
| “A” |
| 304 |
| PTO TECHNICAL REPRESENTATIVE |
| “A” |
SECTION 400 – COMMUNICATIONS AND NAVIGATIONAL AIDS
| 401 |
| RADAR/ECDIS MAINTENANCE |
| “A” |
| 402 |
| NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE |
| “A” |
| 403 |
| GMDSS SAFETY RADIO CERTIFICATE |
| “A” |
| 404 |
| SVDR RUTTER RECERTIFICATION |
| “A” |
| 405 |
| OE-82 UHF SATCOM ANTENNA OVERHAUL |
| “A” |
| 407 |
| TV-DTS SYSTEM GROOM |
| “A” |
SECTION 500 - MACHINERY, AUXILIARY SYSTEM
| 501 |
| AUXILIARY BOILER MAINTENANCE |
| “A” |
| 502 |
| SHIPS SERVICE AIR COMPRESSOR SERVICE/GROOM |
| “A” |
| 503 |
| SCBA COMPRESSOR/REFILL STATION SERVICING/INSPECTION |
| “A” |
| 504 |
| ER OWS AND CARGO OCM GROOM |
| “A” |
| 505 |
| CONNEX BOX SERVICE |
| “A” |
| 506 |
| A/C & REFRIG COMPRESSOR OVERHAUL |
| “A” |
| 507 |
| MLO AND ROCKER ARM LO PUMP OVERHAUL (VR 11-008/010) |
| “A” |
| 508 |
| EVAPORATOR REPLACEMENT |
| “A” |
| 510 |
| INCINERATOR MAINTENANCE AND ADJUSTMENT |
| “A” |
| 511 |
| ME JW COOLER OVERHAUL |
| “A” |
| 512 |
| HOT WATER TANK REPLACEMENT |
| “A” |
| 513 |
| CLEAN AND INSPECT MSD TANKS |
| “A” |
| 514 |
| DECK DRAIN PIPE REPLACEMENT |
| “A” |
| 515 |
| T-AO CLASS FUEL SENSOR INSTALLATION |
| “A” |
| 516 |
| VARIOUS PUMP OVERHAULS |
| “A” |
SECTION 600 - OUTFIT, FURNISHING AND HABITABILITY
| 601 |
| FIREFIGHTING EQUIPMENT RECERTIFICATION |
| “A” |
| 602 |
| ELEVATOR RECERTIFICATION |
| “A” |
| 603 |
| LIFERAFT RECERTIFICATION |
| “A” |
| 604 |
| RESCUE BOAT RECERTIFICATION |
| “A” |
| 605 |
| RESCUE BOAT WINCH & DAVIT INSPECTION |
| “A” |
| 606 |
| LIFEBOAT RECERTIFICATION |
| “A” |
| 607 |
| LIFEBOAT WINCH & DAVIT INSPECTION |
| “A” |
| 608 |
| INSPECTION OF FIRE HOSES |
| “A” |
| 609 |
| INSPECTION OF AFFF HOSES |
| “A” |
| 610 |
| STATEROOM CARPET/TILE REPLACEMENT |
| “A” |
| 611 |
| HEAD AND SHOWER TERRAZZO REPLACEMENT |
| “A” |
| 612 |
| SCBA EQUIPMENT ANNUAL RECERTIFICATION |
| “A” |
| 613 |
| TRASHCOMPACTOR REPLACE |
| “A” |
SECTION 800 –HEATING VENTILATION AND AIR CONDITIONING
| 801 |
| LAUNDRY VENTILATION SYSTEM CLEANING |
| “A” |
| 802 |
| GALLEY RANGE EXAUST SYSTEM CLEANING |
| “A” |
SECTION 900 – DRYDOCKING AND UNDOCKING
| 901 |
| DOCKING AND UNDOCKING |
| “A” |
| 902 |
| UNDERWATER HULL CLEANING AND PRESERVATION |
| “A” |
| 903 |
| FREEBOARD PRESERVATION |
| “A” |
| 904 |
| DRY DOCK CONTINUATION |
| “B” |
SECTION 1000 – UNREP EQUIPMENT
| 1001 |
| REPAIR UNREP BLOCKS AND SHEAVES |
| “A” |
| 1002 |
| SLIDING BLOCK LOWER PILLOW BLOCK BEARINGS |
| “A” |
| 1003 |
| STATION 3 & 4 SLIDING BLOCK PRESERVATION |
| “A” |
| 1004 |
| SADDLE WINCH FOUNDATION REFURBISH |
| “A” |
| 1005 |
| HAULING WINCH CONTROLLEX CABLE PENETRATIONS |
| “A” |
| 1006 |
| HIGHLINE WINCH CONTROLLEX CABLE PENETRATIONS |
| “A” |
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0006:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
23-MAR-2016
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
22-MAR-2016
The following Delivery Schedule item for CLIN 0002 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
The following Delivery Schedule item for CLIN 0003 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
The following Delivery Schedule item for CLIN 0004 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
The following Delivery Schedule item for CLIN 0005 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
The following Delivery Schedule Item has been deleted from CLIN 0006:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
The following Delivery Schedule item has been added to CLIN 0006:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 11-JAN-2016 TO
(End of Summary of Changes)