N32205-15-R-1006
USNS LENTHALL (T-AO 189)
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: 108
PARAGRAPH / SECTION NO: 3.1.1
TITLE: TANK DECK OVERHEAD MEACHANICAL CLEANING & RECOATING
QUESTION:
section 3.1.1 allows for 35,000 sq ft of power tool cleaning. Section 4.1 says GFM 60 gallons of primer (enough for 8,500 to 9,000 sq ft). Is owner wanting to do some spot power tool work inside the 35,000 sq ft area or is it a full removal of the 35,000 sq ft?
ANSWER:
Item will be revised to remove the qty. of gallons from paragraph 4.1. The entire 35,000 sq ft of over head is SSPC-SP3 and painted.
ATTACHMENT J - 8