Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | |||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 000 | GENERAL REQUIREMENTS | ||||||||||||||
| 25 | COST TO ESTABLISH AND MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION BRAVO, CHARLIE AND DELTA | ||||||||||||||
| 7.11 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY FROM ALPHA to FORCE PROTECTION CONDITION BRAVO | 1 | Days | $0.00 | |||||||||||
| 7.12 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY FROM ALPHA to FORCE PROTECTION CONDITION CHARLIE | 1 | Days | $0.00 | |||||||||||
| 7.13 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY FROM ALPHA to FORCE PROTECTION CONDITION DELTA | 1 | Days | $0.00 | |||||||||||
| 7.11 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION BRAVO | 10 | Days | $0.00 | |||||||||||
| 7.12 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 10 | Days | $0.00 | |||||||||||
| 7.13 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 10 | Days | $0.00 | |||||||||||
| WI 025 SUBTOTAL | |||||||||||||||
| 30 | CONTINUATION OF SERVICES | ||||||||||||||
| 7.1 | Overhaul Management Team | 15 | Days | $0.00 | |||||||||||
| 7.2 | General Services For The Ship | 15 | Days | $0.00 | |||||||||||
| 7.3 | Telephone Services | 15 | Days | $0.00 | |||||||||||
| 7.4 | Project Planning and Monitoring | 15 | Days | $0.00 | |||||||||||
| 7.5 | Fire Protection and Ship's Safety | 15 | Days | $0.00 | |||||||||||
| 7.6 | Shipboard Access & Security | 15 | Days | $0.00 | |||||||||||
| 7.7 | Gas Free Certificates | 15 | Days | $0.00 | |||||||||||
| WI 030 SUBTOTAL | |||||||||||||||
| 100 | HULL STRUCTURES | ||||||||||||||
| 113 | ULTRASONIC THICKNESS GAUGINGS - ADDITIONAL READINGS | 7,500 | EA | ||||||||||||
| 114 | STRUCTURAL STEEL REPAIRS (ADDITIONAL) | ||||||||||||||
| 7.1.1 | STEEL PLATE REPLACEMENT | 10,000 | LB | ||||||||||||
| 7.1.2 | ROLLED STEEL STRUCTURAL SHAPES | 5,000 | LB | ||||||||||||
| 7.2.1 | VEE OUT & RE-WELD ONE (1) 6" LONG OR LESS CRACKED FILLET WELD | 50 | EA | ||||||||||||
| 7.2.2 | VEE OUT & RE-WELD ONE (1) 7"-12" LONG CRACKED FILLET WELD | 50 | EA | ||||||||||||
| 7.3.1 | REPLACE ONE (1) SOUNDING TUBE STRIKER PLATE | 25 | EA | ||||||||||||
| 7.4.1 | CLAD WELD ONE (1) 2" x 2" AREA OF DECK OR BOTTOM PLATING | 50 | EA | ||||||||||||
| 7.4.2 | CLAD WELD ONE (1) 4" X 4" AREA OF DECK OR BOTTOM PLATING | 50 | EA | ||||||||||||
| 7.4.3 | CLAD WELD ONE (1) 6" X 6" AREA OF DECK OR BOTTOM PLATING | 50 | EA | ||||||||||||
| 900 | DRY-DOCKING AND UNDOCKING | ||||||||||||||
| 912 | REMOVE EXISTING DETERIORATED ZINC ANODES AND INSTALL 1 EACH: | ||||||||||||||
| 7.2 | Type ZSS-12 Zinc Anode | 200 | EA | ||||||||||||
| Type ZHC-23 Zinc Anode | 100 | EA | |||||||||||||
| Type ZHC-47 Zinc Anode | 200 | EA | |||||||||||||
| Type ZEP Style B Zinc Anode | 100 | EA | |||||||||||||
| 913 | DRYDOCKING AND UNDOCKING SHIP | ||||||||||||||
| 7.1 | Additional Days to Drydock Vessel | 15 | DAYS | ||||||||||||
| TOTAL |
&14USNS JOHN LENTHALL
N32205-15-R-1006 &14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS
ATTACHMENT J-3