J_-_2_Category_A_Items_Revised.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- Regular Overhaul (ROH) of USNS LENTHALL
- Solicitation number
- N32205-15-R-1006
About this file
Response to Clarfication
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech/Rep Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | |||||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | |||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | |||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | |||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | |||||||||||
| 006 | HEAVY WEATHER PLAN | |||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NDT KING POST AREAS (ABS) | |||||||||||
| 102 | TANK RAFTING & INSPECTIONS | |||||||||||
| 103 | ULTRASONIC THICKNESS GAUGING | |||||||||||
| 104 | DECK NON-SKID RENEWAL | |||||||||||
| 105 | STRUCTURAL STEEL REPAIRS | |||||||||||
| 106 | CARGO FEED WATER TANKS PORT & STBD BLASTING & RECOATING | |||||||||||
| 108 | TANK DECK OVERHEAD MECHANICAL CLEANING AND RECOATING | |||||||||||
| 109 | STATION 8 KING POST BLAST AND COAT | |||||||||||
| 110 | FAS STATION 8 KING MAINTENANCE PLATFORM AND REPAIR | |||||||||||
| 111 | MAIN DECK STEEL REPLACEMENT | |||||||||||
| 115 | PORT AND STBD UPPER SEA-CHEST STEEL REPLACEMENT | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | MAIN ENGINE 12,000 HOUR OVERHAUL | |||||||||||
| 202 | MAIN ENGINE TURBOCHARGERS OVERHAUL | |||||||||||
| 203 | STBD MAIN ENGINE CLUTCH AND COUPLING | |||||||||||
| 204 | MAIN ENGINE COOLERS | |||||||||||
| 205 | MAIN ENGINE EXHAUST RESILIENT MOUNTS | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | SWITCHBOARDS AND MOTOR CONTROLLERS CLEANING | |||||||||||
| 302 | CIRCUIT BREAKER INSPECTION & REPAIR | |||||||||||
| 303 | RECONDITION AC MOTORS | |||||||||||
| 304 | WEATHER DECK KICK PIPE REPAIRS | |||||||||||
| 305 | CARGO CONSOLE INSTALLATION | |||||||||||
| 306 | CARGO SYSTEM WIRE REPLACEMENT | |||||||||||
| 307 | CARGO CONSOLE MECHANICAL SUPPORT | |||||||||||
| 308 | CARGO CONSOLE PAINTING | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | RADAR/ECDIS PREVENTIVE MAINTENANCE | |||||||||||
| 402 | GYRO COMPASS REPEATER SYSTEM ANNUAL | |||||||||||
| 403 | GMDSS RECERTIFICATION | |||||||||||
| 404 | SVDR RECERTIFICATION | |||||||||||
| 405 | MAGNETIC COMPASS INSPECTION & ALIGNMENT | |||||||||||
| 406 | URT 23 REPLACEMENT WITH RM 500'S | |||||||||||
| 407 | SPERRY DUAL STEERING SYSTEM | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | STBD PTO CLUTCH AND COUPLING OVERHAUL | |||||||||||
| 502 | NR. 2 MAIN SALT CIRCULATION PUMP OVERHAUL | |||||||||||
| 503 | MAIN SALT WATER CHECK VALVE NO. 2 AND TWO SPARES OVERHAUL | |||||||||||
| 504 | ENGINE ROOM OILY WATER SEPARATOR REPLACEMENT | |||||||||||
| 505 | CLAYTON REPLACEMENT BOILER REPLACEMENT | |||||||||||
| 506 | REPLACE START AIR COMPRESSORS REPLACEMENT | |||||||||||
| 507 | OVERHAUL TANK VENT VALVES | |||||||||||
| 508 | REFRIGERATION & AIR CONDITIONING SYSTEMS REPAIR & GROOM | |||||||||||
| 509 | T-ALT XXX INSTALL NEW LUBE OIL PURIFIER REPLACEMENT | |||||||||||
| 510 | MAINE ENGINE 1, 2 & 3 LUBE OIL PUMP OVERHAUL | |||||||||||
| 511 | CARGO OIL CONTENT MONITOR CALIBRATION & REPAIR | |||||||||||
| 512 | MISC. PIPING REPAIRS | |||||||||||
| 513 | MISC. INSULATION & LAGGING REPAIRS | |||||||||||
| 514 | CONEX BOX REPLACEMENT | |||||||||||
| 515 | MAIN REDUCTION GEAR ANNUAL INSPECTION | |||||||||||
| 516 | INSPECTION MACHINERY SPACES CRANES AND HOIST | |||||||||||
| 517 | INCINERATOR INSPECTION AND MAINTENANCE | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | ANNUAL INSPECTION & REPAIR OF FIRE FIGHTING EQUIPMENT | |||||||||||
| 602 | ANNUAL INSPECTION OF FIRE & AFFF HOSES | |||||||||||
| 603 | ANNUAL LIFE RAFT RECERTIFICATION | |||||||||||
| 604 | INSPECTION & REPAIR OF LIFEBOATS | |||||||||||
| 605 | INSPECTION & REPAIR OF RESCUE BOATS | |||||||||||
| 606 | PORT RHIB DAVIT ANNUAL SERVICING | |||||||||||
| 607 | ANNUAL SCBA COMPRESSOR/REFILL STATION SERVICING | |||||||||||
| 608 | ANNUAL INSPECTION OF SCBA EQUIPMENT | |||||||||||
| 609 | ANNUAL PERSONNEL ELEVATOR RECERTIFICATION (PLC UPGRADE) | |||||||||||
| 610 | ANNUAL SERVICING OF IMMERSION SUITS | |||||||||||
| 611 | TERRAZZO DECK COVERING REPLACEMENT | |||||||||||
| 612 | CARPET & TILE REPLACEMENT | |||||||||||
| 613 | JOINER BULKHEAD PANEL REPLACEMENT | |||||||||||
| 614 | WINDOW RE-GASKETING 02 LEVEL | |||||||||||
| 615 | ANNUAL INSPECTION OF ACCOMODATION LADDERS | |||||||||||
| 616 | PRC DECK COVERING REPLACEMENT | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | GALLEY VENTALATION SYSTEMS CLEANING | |||||||||||
| 900 | DRY-DOCKING AND UNDOCKING | |||||||||||
| 901 | DRY-DOCKING AND UNDOCKING | |||||||||||
| 902 | HULL CLEANING AND PAINTING | |||||||||||
| 903 | ANCHORS & CHAINS CLEANING & PAINTING | |||||||||||
| 904 | OVERHAULING SEA VALVES | |||||||||||
| 905 | CATHELCO MARINE GROWTH INHIBITOR ANODES REPLACEMENT | |||||||||||
| 906 | RUDDER AND STERN FRAME EXAMINATION | |||||||||||
| 907 | INSPECTION OF BILGE KEELS | |||||||||||
| 908 | SEA SUCTION VALVE REPLACEMENT | |||||||||||
| 909 | CRP PROPELLER MAINTENANCE | |||||||||||
| 910 | STERN TUBE SEAL MAINTENANCE | |||||||||||
| 911 | CATHODIC PROTECTION SYSTEM MAINTENANCE | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | CARGO BOOM TOPPING WINCH REPLACEMENT | |||||||||||
| 1002 | REPAIR GYPSY WINCH FOUNDATIONS AND O/H MOTORS | |||||||||||
| 1003 | SLIDING BLOCK TRANSFER HEAD REFURBISHMENT | |||||||||||
| 1004 | REPAIR SADDLE WINCH ELECTRIC MOTOR AND BRAKE STATION 8 | |||||||||||
| 1005 | REPAIR HAULING WINCH ELECTRIC COOLING FAN MOTORS STATION 3 & 4 | |||||||||||
| 1006 | REFURBISH RAM TENSION UPPER & LOWER SHEAVE BLOCK ASSEMBLIES | |||||||||||
| 1007 | WINCH CONTROL BOOTH & WINDOWS REFURBISHMENT AND REPAIR | |||||||||||
| 1008 | STATION 3 HIGH LINE WINCH MAIN & REPLENISHMENT PUMP OVERHAUL | |||||||||||
| 1009 | REPAIR SADDLE WINCH ELECTRIC MOTOR STATION 2 AND NUMBER 3 | |||||||||||
| 1010 | MFR & REPLACE RAM TENSIONER SIGHT GLASS DRAIN VALVE BRACKETS | |||||||||||
| 1011 | MFR & REPAIR WINCH BOOTH DOOR, DOOR HINGES & DOOR FRAME HINGES | |||||||||||
| 1012 | MFR & INSTALL CONTROLEX CABLE BRACKETS STA. 1-4, 6,7 AND 8 | |||||||||||
| 1013 | MFR ASD SHROUD ASSEMBLE & INSTALL | |||||||||||
| 1014 | INSTALL NEW KICK STUFFING TUBES STA 7 SPAN WIRE WINCH & ASD AIR MODULE | |||||||||||
| 1015 | SLIDING BLOCK ELECTRIC MOTOR AND BRAKE OVERHAUL | |||||||||||
| 1016 | ULTRASONIC TESTING OF HAULING SPAN WIRE ASD & RAM TENSIONER DECK ETC | |||||||||||
| 1017 | SINGLE DRUM SPAN WIRE WINCH MOTOR OVERHAUL | |||||||||||
| TOTAL |
| USNS LENTHALL (T-AO 189) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-15-R-1006 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .