Att_L5_Cost_Summary.xlsx
XLSX spreadsheet 61 KB Posted
- Attached to
- Systems Engineering Contractor Support Services Follow-On Federal contract opportunity
- Solicitation number
- N0042123R0007
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offeror Instructions Instructions for the Offeror for the Cost Summary Sheet (using the Sample Cost Summary Sheet for Row/Column references):
| General Instructions | 1 | The Offeror shall prepare only one Cost Summary Sheet for the entire period of performance. Where Subcontractors are proposed, Subcontractors shall each complete a copy of the Cost Summary Sheet. | ||
| 2 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. | |||
| 3 | All cells shall be unprotected and unlocked, with formulas intact to show mathematical operations. | |||
| 4 | Where it is necessary to add additional rows, the Offeror shall ensure the integrity of all formulas. | |||
| 5 | All dollar figures shall be carried out no further than two decimal places. | |||
| 6 | Cells in the Offeror Cost Summary sheet that do not require edits are highlighted in gray. | |||
| 7 | Cells in the Offeror Cost Summary sheet that require Offeror inputs are highlighted in yellow. | |||
| 8 | Cells in the Offeror Cost Summary sheet that are auto calculated are highlighted in green. Offerors shall ensure that formulas are properly applied to any inserted rows. | |||
| 9 | On the Offeror CLIN Summary tab, ensure that the total costs of the CLINs match Section B and the total on the Offeror Cost Summary Spreadsheet. | |||
| Offeror Name | Cell B3 | Enter the Offeror name | ||
| Prime Contractor Labor Cost | Prime Contractor Direct Labor | Rows 9-11+ | ||
| Column A | Starting at row 9, the Offeror shall enter all Prime employee names or position designator. If necessary, insert additional rows. | |||
| Rows 9-11+ | ||||
| Column B | Starting in row 9, the Offeror shall specify a Government Labor Category using the information provided in the tables of Section L, Paragraph 5.4. | |||
| Rows 9-11+ | ||||
| Column C | Starting at row 9, the Offeror shall insert the title of the proposed labor category it will be utilizing, as recorded in the Prime's accounting system, that correlates to each of the Government specified labor categories shown in column B. When more than one person is proposed to provide services for a labor category, that labor category shall be listed multiple times for each person performing work. For example, if the Offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. If necessary, insert additional rows. | |||
| Rows 9-11+ | ||||
| Column D | The Offeror shall identify whether the individual specified for this labor category is full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. | |||
| Rows 9-11+ |
Column E
| The Offeror shall insert "Off" if the worker will be performing at the Contractor's facility (i.e., off-site location hours) or "On" if it will be performing in the Government Spaces (i.e., on-site location hours). | ||
| Rows 9-11+ | ||
| Columns F, I, L, O, and R | The Offeror shall insert the proposed direct labor rate for each employee/labor category (starting in Row 9). The proposed direct labor rate shall be equal to or greater than the Minimum Rate (Column H) stated in the "Minimum Direct Labor Rates" worksheet. Note, the Offeror shall not use any fully burdened hourly rates when pricing the labor of its employees. | |
| Rows 9-11+ | ||
| Columns G, J, M, P, and S | The Offeror shall insert the proposed 'Hours' for each employee/labor category (starting in Row 9). |
Column U sums the respective 'Hours' from each year.
| Rows 9-11+ | ||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas (Rate x Hours). |
Column V sums the respective 'Amounts' from each year.
| Row 12 | ||
| Columns G, J, M, P, and S | The Total Direct Labor Cost 'Hours' are auto calculated based on the provided formulas (Summation of the Amount for Rows 9-11+) |
Column U sums the respective 'Hours' from each year.
| Row 12 | ||
| Columns H, K, N, Q, and T | The Total Direct Labor Cost 'Amount' is auto calculated based on the provided formulas (Summation of the Amount for Rows 9-11+) |
Column V sums the respective 'Amounts' from each year.
| Prime Contractor Indirect Labor Cost | Rows 14-16+ | ||
| Columns A | The Offeror shall insert the type of/names of any indirect rates. For example, if there are multiple fringe rates, insert additional rows to reflect each fringe rate apply accordingly. | ||
| Rows 14-16+ | |||
| Columns F, I, L, O, and R | The Offeror shall insert applicable annual indirect rates under the 'Rates' column for the respective year. | ||
| Rows 14-16+ | |||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas for each year (Indirect Rate x Total Direct Labor Cost). |
Column V sums the respective 'Amounts' from each year.
| Total Direct and Indirect Labor Cost | Row 18 | ||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas (Total Direct Labor Cost + Total Indirect Labor Cost) |
Column V sums the respective 'Amounts' from each year.
| COM | Row 19 | ||
| Columns H, K, N, Q, and T | The Offeror shall insert the proposed Facilities Capitol Cost of Money (COM) for each year. |
Column V sums the respective 'Amounts' from each year.
| Total Prime Contractor Labor Cost | Row 19 | ||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas (Total Direct and Indirect Labor Cost + COM) |
Column V sums the respective 'Amounts' from each year.
| Subcontractor Labor Cost | Subcontractor Proposed Cost and Fee | Rows 24-16+ | |
| Column A | The Offeror shall enter each subcontractor name (starting in Row 24 of the Sample Cost Summary Sheet). If necessary, insert additional rows. | ||
| Rows 24-26+ | |||
| Columns G, J, M, P, and S | The Offeror shall enter the total hours proposed by the respective subcontractor. Note, the total hours entered in these columns should align with the total hours proposed in the 'Sub Cost Summary' worksheet completed by the respective Subcontractor. |
Column U is auto calculated and sums the respective 'Hours' from each year.
| Rows 24-26+ | ||
| Columns H, K, N, Q, and T | The Offeror shall enter the total dollar amount (inclusive of any subcontractor fees) proposed by the respective subcontractor. Note, the total dollars should align with the total dollars proposed in the 'Sub Cost Summary' worksheet completed by the respective Subcontractor. |
Column V is auto calculated and sums the respective 'Amounts' from each year.
| Row 27 | ||
| Columns G, J, M, P, and S | The Total Proposed Subcontractor Labor Cost and Fee 'Hours' columns are auto calculated based on the provided formulas (Summation of the Hours for Rows 24-26+) |
Column U sums the respective 'Hours' from each year.
| Row 27 | ||
| Columns H, K, N, Q, and T | The Total Proposed Subcontractor Labor Cost and Fee 'Amounts' columns are auto calculated based on the provided formulas (Summation of the Amount for Rows 24-26+) |
Column V sums the respective 'Amounts' from each year.
| Prime Contractor Pass Through (Not Including Fee) | Rows 29-31+ | ||
| Column A | The Offeror shall insert the type of/names of any applicable pass through costs (e.g., handling, G&A). If necessary, insert additional rows. | ||
| Rows 29-31+ | |||
| Columns F, I, L, O, and R | The Offeror shall insert applicable pass through rates under the 'Rates' Column for the respective year. | ||
| Rows 29-31+ | |||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas (Pass Through Rate x Total Proposed Subcontractor Labor Cost and Fee) |
Column V sums the respective 'Amounts' from each year.
| Row 32 | ||
| Columns H, K, N, Q, and T | The Total Pass Through (not including fee) 'Amounts' columns are auto calculated based on the provided formulas (Summation of the Amount for Rows 29-31+) |
Column V sums the respective 'Amounts' from each year.
| Total Subcontractor Cost, Including Pass Through | Row 33 | ||
| Columns H, K, N, Q, and T | The Total Subcontractor Cost Including Pass Through 'Amounts' columns are auto calculated based on the provided formulas (Total Proposed Subcontractor Labor Cost and Fee + Total Pass Through (Not Including Fee)) |
Column V sums the respective 'Amounts' from each year.
| Total Labor Cost (Prime and Subcontractor Labor) | Row 35 | |
| Columns G, J, M, P, and S | The Total Labor Cost (Prime and Subcontractor Labor) 'Hours' columns are auto calculated based on the provided formulas (Total Direct Labor Cost 'Hours' + Total Proposed Subcontractor Labor Cost and Fee 'Hours') |
Column U sums the respective 'Hours' from each year.
| Row 35 | ||
| Columns H, K, N, Q, and T | The Total Labor Cost (Prime and Subcontractor Labor) 'Amounts' columns are auto calculated based on the provided formulas (Total Direct Labor Cost 'Amounts' + Total Proposed Subcontractor Labor Cost and Fee 'Amounts') |
Column V sums the respective 'Amounts' from each year.
| Fixed Fee | Prime Contractor Fee for Prime Contractor Labor | Row 38 | |
| Columns F, I, L, O, and R | The Offeror shall insert the fixed fee rate applied to its cost excluding subcontractor labor. | ||
| Row 38 | |||
| Columns H, K, N, Q, and T | The Prime Contractor Fee for Prime Contractor Labor 'Amounts' columns are auto calculated based on the provided formulas (Total Direct Labor Cost 'Amount' x Prime Contractor Fee for Prime Contractor Labor 'Rate') |
Column V sums the respective 'Amounts' from each year.
| Prime Contractor Fee for Subcontractor Labor * | Row 39 | ||
| Columns F, I, L, O, and R | The Offeror shall insert the fixed fee rate it is applying to the subcontractor labor, if any. | ||
| Row 39 | |||
| Columns H, K, N, Q, and T | The Prime Contractor Fee for Subcontractor Labor 'Amounts' columns are auto calculated based on the provided formulas (Total Subcontractor Cost, Including Pass Through 'Amount' x Prime Contractor Fee for Subcontractor Labor 'Rate') |
Column V sums the respective 'Amounts' from each year.
| Total Fee (For Prime and Subcontractor Labor) | Row 40 | ||
| Columns H, K, N, Q, and T | The Total Fee (For Prime and Subcontractor Labor) 'Amounts' columns are auto calculated based on the provided formulas (Total Subcontractor Cost, Including Pass Through 'Amount' x Prime Contractor Fee for Subcontractor Labor 'Rate') |
Column V sums the respective 'Amounts' from each year.
| Total Labor Cost Plus Fixed Fee (CPFF) | Row 42 | |
| Columns H, K, N, Q, and T | The Total Labor Cost Plus Fixed Fee (CPFF) 'Amounts' columns are auto calculated based on the provided formulas (Total Direct Labor Cost 'Amounts' + Total Proposed Subcontractor Labor Cost and Fee 'Amounts') |
Column V sums the respective 'Amounts' from each year.
| Other Direct Costs | Other Direct Costs | Row 45+ | |
| Column A | The Offeror shall insert lines to specify ODCs as necessary (e.g., Travel, Material). | ||
| Row 45+ | |||
| Columns H, K, N, Q, and T | The Offeror shall insert the 'Amount' for each ODC. |
Column V is auto calculated and sums the respective 'Amounts' from each year.
| Any Adders to ODCs | Row 46+ | ||
| Column A | The Offeror shall insert lines to specify Indirect cost types to the Other Direct Costs if applicable and if in compliance with the RFP instructions (e.g., G&A (cost only - no fee)). | ||
| Row 46+ | |||
| Columns H, K, N, Q, and T | The Offeror shall insert the 'Amount' for each ODC. |
Column V is auto calculated and sums the respective 'Amounts' from each year.
| Total ODCs | Row 47 | ||
| Columns H, K, N, Q, and T | The Total ODCs 'Amounts' columns are auto calculated based on the provided formulas (Other Direct Costs + Any Adders to ODCs) |
Column V sums the respective 'Amounts' from each year.
| Total CPFF (Labor and ODCs) | Row 49 | |
| Columns H, K, N, Q, and T | The Total CPFF (Labor and ODCs) 'Amounts' columns are auto calculated based on the provided formulas (Total Labor Cost Plus Fixed Fee (CPFF) + Total ODCs) |
Column V sums the respective 'Amounts' from each year.
&A &F N00421-23-R-0007
Minimum Direct Labor Rates
| Labor Category1 | Level | BLS Code | Location | Area | Percentile | Base Rate | Minimum Rate8 |
| Computer & Information Systems Analyst | Junior | 11-3021 | Contractor Site or PAX River | California-Lexington Park, MD | 25th | $61.14 | $63.77 |
| Computer & Information Systems Analyst | Journeyman | 11-3021 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $78.88 | $82.27 |
| Computer & Information Systems Analyst | Senior | 11-3021 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $99.93 | $104.23 |
| Data Scientist | Journeyman | 15-2051 | Contractor Site | California-Lexington Park, MD | 50th | $49.76 | $51.90 |
| Engineer | Apprentice | 17-20002 | Contractor Site | California-Lexington Park, MD | 10th | $36.00 | $37.55 |
| Engineer | Junior | 17-20002 | Contractor Site or PAX River | California-Lexington Park, MD | 25th | $41.44 | $43.22 |
| Engineer | Journeyman | 17-20002 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $52.00 | $54.24 |
| Engineer | Senior | 17-20002 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $66.28 | $69.13 |
| Engineer | Senior | 17-20002 | NAS Jacksonville | Jacksonville, FL | 75th | $66.28 | $69.13 |
| Engineer | Senior | 17-20003 | Marine Corps Air Station (MCAS) Cherry Point, NC | New Bern, NC | 75th | $63.89 | $66.64 |
| Engineer | Senior | 17-20002 | NAS North Island | San Diego, CA | 75th | $66.28 | $69.13 |
| Engineer | Senior | 17-20003 | NAS Whidbey Island Oak Harbor, WA | Western Washington nonmetropolitan area | 75th | $63.89 | $66.64 |
| Engineer | Senior | 17-20003 | Raytheon Tucson, AZ | Tucson, AZ | 75th | $63.89 | $66.64 |
| Engineer | Senior | 17-20002 | Dept of Energy, Idaho Falls, ID | Idaho Falls, ID | 75th | $66.28 | $69.13 |
| Engineer | Senior | 17-20003 | Marine Corps Base Camp LeJeune | Jacksonville, NC9 | 75th | $63.89 | $66.64 |
| Engineer | Senior | 17-20002 | Sikorsky, Stratford, CT | Bridgeport-Stamford-Norwalk, CT | 75th | $66.28 | $69.13 |
| Engineer | Senior | 17-20002 | Lockheed Martin | Orlando, FL | 75th | $66.28 | $69.13 |
| Engineer | Senior | 17-20002 | Boeing, St. Louis, MO | St. Louis, MO | 76th | $66.28 | $69.13 |
| Engineer (Model-Based Systems) | Junior | 17-20002 | Contractor Site | California-Lexington Park, MD | 25th | $41.44 | $43.22 |
| Engineer (Model-Based Systems) | Journeyman | 17-20002 | Contractor Site | California-Lexington Park, MD | 50th | $52.00 | $54.24 |
| Engineer (Model-Based Systems) | Senior | 17-20002 | Contractor Site | California-Lexington Park, MD | 75th | $66.28 | $69.13 |
| Engineer (Production Quality) | Senior | 17-20002 | Contractor Site | California-Lexington Park, MD | 75th | $66.28 | $69.13 |
| Engineer (Systems) | Journeyman | 17-2199 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $50.29 | $52.45 |
| Engineer (Systems) | Senior | 17-2199 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $65.05 | $67.85 |
| Engineering Technician IV | N/A | 17-30204 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $35.78 | $37.32 |
| Engineering Technician IV | N/A | 17-30205 | Marine Corps Air Station (MCAS) Cherry Point, NC | New Bern, NC | 50th | $31.50 | $32.85 |
| Engineering Technician IV | N/A | 17-30205 | Marine Corps Base Camp LeJeune | Jacksonville, NC9 | 50th | $31.50 | $32.85 |
| Engineering Technician VI | N/A | 17-30204 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $46.23 | $48.22 |
| Engineering Technician VI | N/A | 17-30205 | Marine Corps Air Station (MCAS) Cherry Point, NC | New Bern, NC | 75th | $41.31 | $43.09 |
| Engineering Technician VI | N/A | 17-30205 | Marine Corps Base Camp LeJeune | Jacksonville, NC9 | 75th | $41.31 | $43.09 |
| Engineering Technician VI | N/A | 17-30205 | Boeing | St Louis, MO | 75th | $41.31 | $43.09 |
| Engineering Technician VI | N/A | 17-30204 | Raytheon El Segundo, CA | Los Angeles - Long Beach - Anaheim, CA | 75th | $46.23 | $48.22 |
| Engineering Technician (Model-Based) IV | N/A | 17-30204 | Contractor Site | California-Lexington Park, MD | 50th | $35.78 | $37.32 |
| Engineering Technician (Model-Based) VI | N/A | 17-30204 | Contractor Site | California-Lexington Park, MD | 75th | $46.23 | $52.70 |
| Management Analyst | Junior | 13-1111 | PAX River | California-Lexington Park, MD | 25th | $33.81 | $35.26 |
| Management Analyst (Configuration) | Junior | 13-1111 | Contractor Site or PAX River | California-Lexington Park, MD | 25tth | $33.81 | $35.26 |
| Mathematical Science Occupations (All Other) | Senior | 15-20996 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $65.68 | $68.50 |
| Mathematical Scientist (Systems Specialist) | Senior | 15-20996 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $65.68 | $68.50 |
| Operations Manager | Senior | 11-1021 | Contractor Site | California-Lexington Park, MD | 75th | $74.31 | $77.51 |
| Operations Manager Deputy | Journeyman | 11-1021 | Contractor Site | California-Lexington Park, MD | 50th | $47.16 | $49.19 |
| Operations Research Analyst | Junior | 15-2031 | Contractor Site or PAX River | California-Lexington Park, MD | 25th | $30.80 | $32.12 |
| Operations Research Analyst | Journeyman | 15-2031 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $41.21 | $42.98 |
| Operations Research Analyst | Senior | 15-2031 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $54.80 | $57.16 |
| Operations Research Analyst | Senior | 15-2031 | NAWCTSD Orlando | Orlando, FL | 75th | $54.80 | $57.16 |
| Operations Research Analyst (Model-Based) | Junior | 15-2031 | Contractor Site | California-Lexington Park, MD | 25th | $30.80 | $32.12 |
| Operations Research Analyst (Model-Based) | Journeyman | 15-2031 | Contractor Site | California-Lexington Park, MD | 50th | $41.21 | $42.98 |
| Operations Research Analyst (Model-Based) | Senior | 15-2031 | Contractor Site | California-Lexington Park, MD | 75th | $54.80 | $57.16 |
| Program Management Analyst | Journeyman | 13-1111 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $45.81 | $47.78 |
| Program Management Analyst | Journeyman | 13-1111 | Marine Corps Air Station (MCAS) Cherry Point, NC | New Bern, NC | 50th | $45.81 | $47.78 |
| Program Management Analyst | Journeyman | 13-1111 | Marine Corps Base Camp LeJeune | Jacksonville, NC | 50th | $45.81 | $47.78 |
| Program Management Analyst | Senior | 13-1111 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $61.29 | $63.93 |
| Program Management Analyst (Model-Based Systems Engineering) | Junior | 13-1111 | Contractor Site | California-Lexington Park, MD | 25th | $33.81 | $35.26 |
| Program Management Analyst (Model-Based Systems Engineering) | Journeyman | 13-1111 | Contractor Site | California-Lexington Park, MD | 50th | $45.81 | $47.78 |
| Program Management Analyst (Model-Based Systems Engineering) | Senior | 13-1111 | Contractor Site | California-Lexington Park, MD | 75th | $61.29 | $63.93 |
| Software Developer | Junior | 15-1252 | Contractor Site | California-Lexington Park, MD | 25th | $46.54 | $48.54 |
| Software Developer | Journeyman | 15-1252 | Contractor Site | California-Lexington Park, MD | 50th | $61.18 | $63.81 |
| Software Developer | Senior | 15-1252 | Contractor Site | California-Lexington Park, MD | 75th | $77.64 | $80.98 |
| Tactical Operations and Air/Weapons Specialist | Journeyman | 55-30007 | PAX River | California-Lexington Park, MD | 50th | $49.96 | $52.10 |
| Tactical Operations and Air/Weapons Specialist | Senior | 55-30007 | PAX River | California-Lexington Park, MD | 75th | $71.72 | $74.80 |
| Notes: | |||||||
| 1includes Key Personnel | |||||||
| 217-2072, Electronics Engineers, Except Computerwas used to calculate the minimum rate for 17-2000. | |||||||
| 317-2071 Electrical Engineers was used to calculate the minimum rate for 17-2000 in these locations. | |||||||
| 417-3021 Aerospace Engineering & Operations Technologists and Technicians was used to calculate the minimum rate for 17-3020. | |||||||
| 517-3029 Aerospace Engineering & Operations Technologists and Technicians, Except Drafters, All Other was used to calculate the minimum rate for 17-3020. | |||||||
| 615-2051 Data Scientists was used to calculate the minimum rate for 15-2099. | |||||||
| 7BLS does not provide wage estimates for the 55-0000 Military Specific Occupations group. 53-2012 Commercial Pilots was used to calculate the minimum rate (salary/2080). | |||||||
| 8includes 4.3% escalation | |||||||
| 9New Bern rate used to calculate the minimum rate. |
Sample Offeror Cost Summary
SAMPLE OFFEROR COST SUMMARY SPREADSHEET
Offeror (Prime) Name:
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total for All Periods | ||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | F/P | Site | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Hours | Amount |
| Prime Contractor Labor Cost | |||||||||||||||||||||
| Prime Contractor Direct Labor | |||||||||||||||||||||
| Employee Name 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Employee Name 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Etc. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Total Direct Labor Cost | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | |||||||||
| Prime Contractor Indirect Labor Cost | |||||||||||||||||||||
| Overhead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Fringe Benefits | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Total Indirect Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Total Direct and Indirect Labor cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| COM | $0.00 | ||||||||||||||||||||
| Total Prime Contractor Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontractor Labor Cost | ||||||||||||
| Subcontractor Proposed Cost and Fee | ||||||||||||
| Subcontractor 1 | 0.00 | $0.00 | ||||||||||
| Subcontractor 2 | 0.00 | $0.00 | ||||||||||
| Etc. | 0.00 | $0.00 | ||||||||||
| Total Proposed Subcontractor Labor Cost and Fee | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 |
| Prime contractor pass through (not including fee) | ||||||||||||
| Handling | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Other (if any) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Total Pass Through (Not Including Fee) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Total Subcontractor Cost, Including Pass Through | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total Labor Cost (Prime and Subcontractor Labor) 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00
| Fixed Fee | ||||||
| Prime Contractor Fee for Prime Contractor Labor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Prime Contractor Fee for Subcontractor Labor * | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Fee (for Prime and Subcontractor Labor) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total Labor Cost Plus Fixed Fee (CPFF) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Other Direct Costs | ||||||
| Other Direct Costs (ODCs) | $0.00 | |||||
| Any adders to ODCs | $0.00 | |||||
| Total ODCs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total CPFF all CLINs (Labor and ODCs) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Grand Total of CPFF all CLINs | ||
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | $0 | |
| Fixed Fee for Labor Performed by Prime Contractor | $0 | ERROR:#DIV/0! |
&F &A Page &P N00421-23-R-0007
KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:
Offeror Cost Summary
OFFEROR COST SUMMARY SHEET
Offeror (Prime) Name:
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total for All Periods | ||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | F/P | Site | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Hours | Amount |
| Prime Contractor Labor Cost | |||||||||||||||||||||
| Prime Contractor Direct Labor | |||||||||||||||||||||
| Employee Name 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Employee Name 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Etc. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Total Direct Labor Cost | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | |||||||||
| Prime Contractor Indirect Labor Cost | |||||||||||||||||||||
| Overhead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Fringe Benefits | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Total Indirect Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Total Direct and Indirect Labor cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| COM | $0.00 | ||||||||||||||||||||
| Total Prime Contractor Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontractor Labor Cost | ||||||||||||
| Subcontractor Proposed Cost and Fee | ||||||||||||
| Subcontractor 1 | 0.00 | $0.00 | ||||||||||
| Subcontractor 2 | 0.00 | $0.00 | ||||||||||
| Etc. | 0.00 | $0.00 | ||||||||||
| Total Proposed Subcontractor Labor Cost and Fee | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 |
| Prime contractor pass through (not including fee) | ||||||||||||
| Handling | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Other (if any) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Total Pass Through (Not Including Fee) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Total Subcontractor Cost, Including Pass Through | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total Labor Cost (Prime and Subcontractor Labor) 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00
| Fixed Fee | ||||||
| Prime Contractor Fee for Prime Contractor Labor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Prime Contractor Fee for Subcontractor Labor * | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Fee (for Prime and Subcontractor Labor) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total Labor Cost Plus Fixed Fee (CPFF) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Other Direct Costs | ||||||
| Other Direct Costs (ODCs) | $0.00 | |||||
| Any adders to ODCs | $0.00 | |||||
| Total ODCs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total CPFF all CLINs (Labor and ODCs) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Grand Total of CPFF all CLINs | ||
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | $0 | |
| Fixed Fee for Labor Performed by Prime Contractor | $0 | ERROR:#DIV/0! |
&A Page &P N00421-23-R-0007
KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:
Offeror CLIN Summary
CLIN Summary Sheet
| CLINS | CLIN Description | Total Hours | Total Cost | Total Fixed Fee | Total Value $ |
| 1000 | CPFF Labor Ceiling | 0.00 | 0.00 | 0.00 | 0.00 |
| 1010 | Cost ODC Ceiling | NA | 0.00 | NA | 0.00 |
| Total | 0.00 | 0.00 | 0.00 | 0.00 |
&A N00421-23-R-0007
Subcontractor Instructions Instructions for Subcontractors for the Cost Summary Sheet (using the Subcontractor Sample Cost Summary Sheet for Row/Column references):
| General Instructions | 1 | The Subcontractor shall prepare only one Cost Summary Sheet for the entire period of performance. When Subcontractors are submitting documents directly to the Government vice as part of the Offeror's proposal, the Subcontractor shall provide the Offeror with the total proposed hours and cost per year such that the Offeror can complete its Cost Summary sheet. | ||
| 2 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. | |||
| 3 | All cells shall be unprotected and unlocked, with formulas intact to show mathematical operations. | |||
| 4 | Where it is necessary to add additional rows, the Subcontractor shall ensure the integrity of all formulas. | |||
| 5 | All dollar figures shall be carried out no further than two decimal places. | |||
| 6 | Cells in the Subcontractor Cost Summary sheet that do not require edits are highlighted in gray. | |||
| 7 | Cells in the Subcontractor Cost Summary sheet that require Subcontractor inputs are highlighted in yellow. | |||
| 8 | Cells in the Subcontractor Cost Summary sheet that are auto calculated are highlighted in green. Offerors shall ensure that formulas are properly applied to any inserted rows. | |||
| 9 | The Subcontractor shall change the name of the "Subcontractor Cost Summary" Worksheet, by replacing "Subcontractor" with the Subcontractor's name. | |||
| Offeror Name | Cell B3 | Enter the Offeror name | ||
| Subcontractor Name | Cell C3 | Enter the Subcontractor name | ||
| Subcontractor Labor Cost | Prime Contractor Direct Labor | Rows 9-11+ | ||
| Column A | Starting at row 9, the Subcontractor shall enter all Subcontractor employee names. If necessary, insert additional rows. | |||
| Rows 9-11+ | ||||
| Column B | Starting in row 9, the Subcontractor shall specify a Government Labor Category using the information provided in the tables of Section L, Paragraph 5.4. | |||
| Rows 9-11+ | ||||
| Column C | Starting at row 9, the Subcontractor shall insert the title of the proposed labor category it will be utilizing, as recorded in the Subcontractor's accounting system, that correlates to each of the Government specified labor categories shown in column B. When more than one person is proposed to provide services for a labor category, that labor category shall be listed multiple times for each person performing work. For example, if the Offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. If necessary, insert additional rows. | |||
| Rows 9-11+ | ||||
| Column D | The Subcontractor shall identify whether the individual specified for this labor category is full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. | |||
| Rows 9-11+ |
Column E
| The Subcontractor shall insert "Off" if the worker will be performing at the Contractor's facility (i.e., off-site location hours) or "On" if it will be performing in the Government Spaces (i.e., on-site location hours). | ||
| Rows 9-11+ | ||
| Columns F, I, L, O, and R | The Subcontractor shall insert the proposed direct labor rate for each employee/labor category (starting in Row 9). The proposed direct labor rate shall be equal to or greater than the Minimum Rate (Column H) stated in the "Minimum Direct Labor Rates" worksheet. Note, the Subcontractor shall not use any fully burdened hourly rates when pricing the labor of its employees. | |
| Rows 9-11+ | ||
| Columns G, J, M, P, and S | The Subcontractor shall insert the proposed 'Hours' for each employee/labor category (starting in Row 9). |
Column U sums the respective 'Hours' from each year.
| Rows 9-11+ | ||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas (Rate x Hours). |
Column V sums the respective 'Amounts' from each year.
| Row 12 | ||
| Columns G, J, M, P, and S | The Total Direct Labor Cost 'Hours' are auto calculated based on the provided formulas (Summation of the Amount for Rows 9-11+) |
Column U sums the respective 'Hours' from each year.
| Row 12 | ||
| Columns H, K, N, Q, and T | The Total Direct Labor Cost 'Amount' is auto calculated based on the provided formulas (Summation of the Amount for Rows 9-11+) |
Column V sums the respective 'Amounts' from each year.
| Prime Contractor Indirect Labor Cost | Rows 14-16+ | ||
| Columns A | The Subcontractor shall insert the type of/names of any indirect rates. For example, if there are multiple fringe rates, insert additional rows to reflect each fringe rate apply accordingly. | ||
| Rows 14-16+ | |||
| Columns F, I, L, O, and R | The Subcontractor shall insert applicable annual indirect rates under the 'Rates' column for the respective year. | ||
| Rows 14-16+ | |||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas for each year (Indirect Rate x Total Direct Labor Cost). |
Column V sums the respective 'Amounts' from each year.
| Total Direct and Indirect Labor Cost | Row 18 | ||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas (Total Direct Labor Cost + Total Indirect Labor Cost) |
Column V sums the respective 'Amounts' from each year.
| COM | Row 19 | ||
| Columns H, K, N, Q, and T | The Subcontractor shall insert the proposed Facilities Capitol Cost of Money (COM) for each year. |
Column V sums the respective 'Amounts' from each year.
| Total Prime Contractor Labor Cost | Row 19 | ||
| Columns H, K, N, Q, and T | The 'Amounts' are auto calculated based on the provided formulas (Total Direct and Indirect Labor Cost + COM) |
Column V sums the respective 'Amounts' from each year.
&A N00421-23-R-0007
Sample Sub Cost Summary
SAMPLE SUBCONTRACTOR COST SUMMARY SPREADSHEET
| Offeror (Prime) Name: | |||||||||||||||||||||
| Subcontractor Name: | |||||||||||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total for All Periods | ||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | F/P | Site | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Hours | Amount |
| Subcontractor Labor Cost | |||||||||||||||||||||
| Subcontractor Direct Labor | |||||||||||||||||||||
| Employee Name 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Employee Name 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Etc. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Total Direct Labor Cost | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | |||||||||
| Subcontractor Indirect Labor Cost | |||||||||||||||||||||
| Overhead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Fringe Benefits | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Total Indirect Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Total Direct and Indirect Labor cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| COM | $0.00 | ||||||||||||||||||||
| Total Subcontractor Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&F &A Page &P N00421-23-R-0007
KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:
Subcontractor Cost Summary
COST SUMMARY SPREADSHEET
| Offeror (Prime) Name: | |||||||||||||||||||||
| Subcontractor Name: | |||||||||||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total for All Periods | ||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | F/P | Site | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Hours | Amount |
| Subcontractor Labor Cost | |||||||||||||||||||||
| Subcontractor Direct Labor | |||||||||||||||||||||
| Employee Name 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Employee Name 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Etc. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0.00 | $0.00 | ||||||||||||||
| Total Direct Labor Cost | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | 0.00 | $0.00 | |||||||||
| Subcontractor Indirect Labor Cost | |||||||||||||||||||||
| Overhead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Fringe Benefits | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Total Indirect Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| Total Direct and Indirect Labor cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||
| COM | $0.00 | ||||||||||||||||||||
| Total Subcontractor Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&F &A Page &P N00421-23-R-0007
KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:
File details come from the government source that posted it. Updated .