Att_L5_Cost_Summary_Amend0001.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Systems Engineering Contractor Support Services Follow-On Federal contract opportunity
Solicitation number
N0042123R0007
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

View the file

Other files for this federal contract opportunity

Other files attached to Systems Engineering Contractor Support Services Follow-On, newest first.
File Type Posted
RFP_N0042123R0007_Amend0003.pdf PDF
RFP_N0042123R0007_Amend0002.pdf PDF
Att_L5_Cost_Summary_Amend0002.xlsx XLSX spreadsheet
RFP_N0042123R0007_Amend01.pdf PDF
CDRLs.pdf PDF
Att_L1_CA_Tables_Amend0001.xlsx XLSX spreadsheet
Att_L4_CRM_Amend0001.xlsx XLSX spreadsheet
Draft RFP_v2_QA.pdf PDF
RFP_N0042123R0007_Amend01.pdf PDF
Att_J3_Form DD254_Amend0001.pdf PDF
Att_L3_PPCE_Data_Amend0001.xlsx XLSX spreadsheet
Att_L7 5.4 Labor Hours Table_Amend0001.xlsx XLSX spreadsheet
N0042123R0007.pdf PDF
Att_L6_Annual_Fully_Burdened_Rates.xlsx XLSX spreadsheet
Att_J4_Data_Item_Transmittal_Acceptance_Rejection_Form.docx DOCX document
Att_L2_PPQ.docx DOCX document
Att_L4_CRM.xlsx XLSX spreadsheet
Att_J1_Org_Conflict_of_Interest.docx DOCX document
2a - C073 DD254 N00421-23-R-0007 TBD.pdf PDF
Att_L1_CA_Tables.xlsx XLSX spreadsheet
Att_L5_Cost_Summary.xlsx XLSX spreadsheet
Draft RFP QAs.pdf PDF
Att_J3_DD_Form_254.pdf PDF
Att_L3_PPCE_Data.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" for Contractor's facility; "P" for Pax River; "J" for Jacksonville; "B" for Boeing; "L" for Lockheed Martin; "RAZ" for Raytheon Tucson AZ; "RCA" for Raytheon El Segundo CA; "C" for Cherry Point; "N" for North Island; "E" for Dept of Energy; "S" for Sikorsky; "U" for Camp LeJeune; "TSD" for NAWCTSD; or "W" Whidbey Island.
In column F, identify for the specific labor category individual whether they are employees, contingent, or prospective. Enter "E" for employees, "C" for contingent, or "P" for prospective.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
12Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The prime should insert the subcontractor handling charge, if any.
14The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
15The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A13, and A20.
2Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" for Contractor's facility, "P" for Pax River, "J" for Jacksonville, "L" for Lockheed Martin, "R" for Raytheon, "C" for Cherry Point, "N" for North Island, "E" for Dept of Energy, "S" for Sikorsky "U" for Camp LeJeune or "W" Whidbey Island.
10In column F, identify for the specific labor category individual whether they are employees, contingent or prospective. Enter "E" for employee, "C" for contingent or "P" for prospective.
11In Column G Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
12For subcontractor cost summary sheets, delete Rows 22-48.
When submitting this file, the instructions may be deleted.

Offerors and Subcontractors may add worksheets to provide clarity and detail in support of the Cost Summary Spreadsheet

Minimum Direct Labor Rates

Labor Category1LevelBLS CodeLocationAreaPercentileBase RateMinimum Rate8
Computer & Information Systems AnalystJunior11-3021Contractor Site or PAX RiverCalifornia-Lexington Park, MD25th$50.68$52.86
Computer & Information Systems AnalystJourneyman11-3021Contractor Site or PAX RiverCalifornia-Lexington Park, MD50th$75.98$79.25
Computer & Information Systems AnalystSenior11-3021Contractor Site or PAX RiverCalifornia-Lexington Park, MD75th$95.03$99.12
Data ScientistJourneyman15-2051Contractor SiteCalifornia-Lexington Park, MD50th$48.92$51.02
EngineerApprentice17-20002Contractor SiteCalifornia-Lexington Park, MD10th$45.58$47.54
EngineerJunior17-20002Contractor Site or PAX RiverCalifornia-Lexington Park, MD25th$55.88$58.28
EngineerJourneyman17-20002Contractor Site or PAX RiverCalifornia-Lexington Park, MD50th$66.76$69.63
EngineerSenior17-20002Contractor Site or PAX RiverCalifornia-Lexington Park, MD75th$78.89$82.28
EngineerSenior17-20002NAS JacksonvilleJacksonville, FL75th$54.07$56.40
EngineerSenior17-20003Marine Corps Air Station (MCAS) Cherry Point, NCNew Bern, NC75th$51.56$53.78
EngineerSenior17-20002NAS North IslandSan Diego, CA75th$77.02$80.33
EngineerSenior17-20003NAS Whidbey Island Oak Harbor, WAWestern Washington nonmetropolitan area75th$71.25$74.31
EngineerSenior17-20003Raytheon Tucson, AZTucson, AZ75th$61.88$64.54
EngineerSenior17-20002Dept of Energy, Idaho Falls, IDIdaho Falls, ID75th$81.81$85.33
EngineerSenior17-20003Marine Corps Base Camp LeJeuneJacksonville, NC975th$51.56$53.78
EngineerSenior17-20002Sikorsky, Stratford, CTBridgeport-Stamford-Norwalk, CT75th$65.36$68.17
EngineerSenior17-20002Lockheed MartinOrlando, FL75th$58.98$61.52
EngineerSenior17-20002Boeing, St. Louis, MOSt. Louis, MO76th$64.13$66.89
Engineer (Model-Based Systems)Junior17-20002Contractor SiteCalifornia-Lexington Park, MD25th$55.88$58.28
Engineer (Model-Based Systems)Journeyman17-20002Contractor SiteCalifornia-Lexington Park, MD50th$66.76$69.63
Engineer (Model-Based Systems)Senior17-20002Contractor SiteCalifornia-Lexington Park, MD75th$78.89$82.28
Engineer (Production Quality)Senior17-20002Contractor SiteCalifornia-Lexington Park, MD75th$78.89$82.28
Engineer (Systems)Journeyman17-2199Contractor Site or PAX RiverCalifornia-Lexington Park, MD50th$73.60$76.76
Engineer (Systems)Senior17-2199Contractor Site or PAX RiverCalifornia-Lexington Park, MD75th$78.89$82.28
Engineering Technician IVN/A17-30204Contractor Site or PAX RiverCalifornia-Lexington Park, MD50th$46.40$48.40
Engineering Technician IVN/A17-30205Marine Corps Air Station (MCAS) Cherry Point, NCNew Bern, NC50th$38.15$39.79
Engineering Technician IVN/A17-30205Marine Corps Base Camp LeJeuneJacksonville, NC950th$38.15$39.79
Engineering Technician VIN/A17-30204Contractor Site or PAX RiverCalifornia-Lexington Park, MD75th$48.80$50.90
Engineering Technician VIN/A17-30205Marine Corps Air Station (MCAS) Cherry Point, NCNew Bern, NC75th$41.97$43.77
Engineering Technician VIN/A17-30205Marine Corps Base Camp LeJeuneJacksonville, NC975th$41.97$43.77
Engineering Technician VIN/A17-30205BoeingSt Louis, MO75th$38.25$39.89
Engineering Technician VIN/A17-30204Raytheon El Segundo, CALos Angeles - Long Beach - Anaheim, CA75th$47.79$49.84
Engineering Technician (Model-Based) IVN/A17-30204Contractor SiteCalifornia-Lexington Park, MD50th$46.40$48.40
Engineering Technician (Model-Based) VIN/A17-30204Contractor SiteCalifornia-Lexington Park, MD75th$48.80$52.70
Management AnalystJunior13-1111PAX RiverCalifornia-Lexington Park, MD25th$46.52$48.52
Management Analyst (Configuration)Junior13-1111Contractor Site or PAX RiverCalifornia-Lexington Park, MD25tth$46.52$48.52
Mathematical Science Occupations (All Other)Senior15-20996Contractor Site or PAX RiverCalifornia-Lexington Park, MD75th$67.37$70.27
Mathematical Scientist (Systems Specialist)Senior15-20996Contractor Site or PAX RiverCalifornia-Lexington Park, MD75th$67.37$70.27
Operations ManagerSenior11-1021Contractor SiteCalifornia-Lexington Park, MD75th$75.05$78.28
Operations Manager DeputyJourneyman11-1021Contractor SiteCalifornia-Lexington Park, MD50th$45.53$47.49
Operations Research AnalystJunior15-2031Contractor Site or PAX RiverCalifornia-Lexington Park, MD25th$44.88$46.81
Operations Research AnalystJourneyman15-2031Contractor Site or PAX RiverCalifornia-Lexington Park, MD50th$55.71$58.11
Operations Research AnalystSenior15-2031Contractor Site or PAX RiverCalifornia-Lexington Park, MD75th$69.55$72.54
Operations Research AnalystSenior15-2031NAWCTSD OrlandoOrlando, FL75th$58.98$61.52
Operations Research Analyst (Model-Based)Junior15-2031Contractor SiteCalifornia-Lexington Park, MD25th$44.88$46.81
Operations Research Analyst (Model-Based)Journeyman15-2031Contractor SiteCalifornia-Lexington Park, MD50th$55.71$58.11
Operations Research Analyst (Model-Based)Senior15-2031Contractor SiteCalifornia-Lexington Park, MD75th$69.55$72.54
Program Management AnalystJourneyman13-1111Contractor Site or PAX RiverCalifornia-Lexington Park, MD50th$57.98$60.47
Program Management AnalystJourneyman13-1111Marine Corps Air Station (MCAS) Cherry Point, NCNew Bern, NC50th$44.51$46.42
Program Management AnalystJourneyman13-1111Marine Corps Base Camp LeJeuneJacksonville, NC50th$44.51$46.42
Program Management AnalystSenior13-1111Contractor Site or PAX RiverCalifornia-Lexington Park, MD75th$66.36$69.21
Program Management Analyst (Model-Based Systems Engineering)Junior13-1111Contractor SiteCalifornia-Lexington Park, MD25th$46.52$48.52
Program Management Analyst (Model-Based Systems Engineering)Journeyman13-1111Contractor SiteCalifornia-Lexington Park, MD50th$57.98$60.47
Program Management Analyst (Model-Based Systems Engineering)Senior13-1111Contractor SiteCalifornia-Lexington Park, MD75th$66.36$69.21
Software DeveloperJunior15-1252Contractor SiteCalifornia-Lexington Park, MD25th$49.23$51.35
Software DeveloperJourneyman15-1252Contractor SiteCalifornia-Lexington Park, MD50th$60.40$63.00
Software DeveloperSenior15-1252Contractor SiteCalifornia-Lexington Park, MD75th$70.12$73.14
Tactical Operations and Air/Weapons SpecialistJourneyman55-30007PAX RiverCalifornia-Lexington Park, MD50th$49.96$52.11
Tactical Operations and Air/Weapons SpecialistSenior55-30007PAX RiverCalifornia-Lexington Park, MD75th$71.72$74.80
Notes:
1includes Key Personnel
217-2072, Electronics Engineers, Except Computerwas used to calculate the minimum rate for 17-2000.
317-2071 Electrical Engineers was used to calculate the minimum rate for 17-2000 in these locations.
417-3021 Aerospace Engineering & Operations Technologists and Technicians was used to calculate the minimum rate for 17-3020.
517-3029 Aerospace Engineering & Operations Technologists and Technicians, Except Drafters, All Other was used to calculate the minimum rate for 17-3020.
615-2051 Data Scientists was used to calculate the minimum rate for 15-2099.
7BLS does not provide wage estimates for the 55-0000 Military Specific Occupations group. 53-2012 Commercial Pilots was used to calculate the minimum rate (salary/2080).
8includes 4.3% escalation
9New Bern rate used to calculate the minimum rate.

Cost Summary

COST SUMMARY SPREADSHEET

Prime Offeror Name:
Subcontractor Name (if applicable):
Year 1Year 2Year 3Year 4Year 56 month Option to ExtendTotal for All Periods
Cost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteE/C/PRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 1000000000
Employee Name 2000000000
Etc.000000000
Total Direct Labor Cost00000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost0000000
COM
Total Prime Contractor Labor Cost0000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 10
Subcontractor 20
Etc.0
Total proposed subcontractor labor cost and fee0000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF) 0

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all CLINs (Labor and ODCs) 0

Grand Total of CPFF all CLINs

Pass Through Analysis - Total for All YearsAmount
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$0
Fee Analysis - Total for All YearsAmount
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$0

* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through. However, in Section B, prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column).

CLIN Summary

CLIN Summary Sheet

CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
1000
1008
Total

File details come from the government source that posted it. Updated .