Att_L5_Cost_Summary_Amend0001.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- Systems Engineering Contractor Support Services Follow-On Federal contract opportunity
- Solicitation number
- N0042123R0007
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions for Prime Contractor: | |
| 1 | Enter Prime offeror name into cell A3. |
| 2 | Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. |
| 3 | Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. |
| 4 | Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor) |
| 5 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| 6 | All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations. |
| 7 | All dollar figures shall be carried out no further than two decimal places. |
| 8 | In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 9 | In column E, the Offeror shall insert a "K" for Contractor's facility; "P" for Pax River; "J" for Jacksonville; "B" for Boeing; "L" for Lockheed Martin; "RAZ" for Raytheon Tucson AZ; "RCA" for Raytheon El Segundo CA; "C" for Cherry Point; "N" for North Island; "E" for Dept of Energy; "S" for Sikorsky; "U" for Camp LeJeune; "TSD" for NAWCTSD; or "W" Whidbey Island. |
| In column F, identify for the specific labor category individual whether they are employees, contingent, or prospective. Enter "E" for employees, "C" for contingent, or "P" for prospective. | |
| 10 | Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly. |
| 11 | For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance. |
| 12 | Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas. |
| 13 | The prime should insert the subcontractor handling charge, if any. |
| 14 | The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor. |
| 15 | The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any. |
| 16 | Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable. |
| 17 | Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions. |
| 18 | On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet |
| 19 | When submitting this file, the instructions may be deleted. |
| Instructions for Subcontractors: | |
| 1 | Enter Prime offeror name into cell A3. |
| Replace Prime Contractor with Subcontractor in A7, A8, A13, and A20. | |
| 2 | Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. |
| 3 | Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. |
| 4 | Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor) |
| 5 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| 6 | All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations. |
| 7 | All dollar figures shall be carried out no further than two decimal places. |
| 8 | In column D, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 9 | In column E, the Offeror shall insert a "K" for Contractor's facility, "P" for Pax River, "J" for Jacksonville, "L" for Lockheed Martin, "R" for Raytheon, "C" for Cherry Point, "N" for North Island, "E" for Dept of Energy, "S" for Sikorsky "U" for Camp LeJeune or "W" Whidbey Island. |
| 10 | In column F, identify for the specific labor category individual whether they are employees, contingent or prospective. Enter "E" for employee, "C" for contingent or "P" for prospective. |
| 11 | In Column G Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly. |
| 12 | For subcontractor cost summary sheets, delete Rows 22-48. |
| When submitting this file, the instructions may be deleted. |
Offerors and Subcontractors may add worksheets to provide clarity and detail in support of the Cost Summary Spreadsheet
Minimum Direct Labor Rates
| Labor Category1 | Level | BLS Code | Location | Area | Percentile | Base Rate | Minimum Rate8 |
| Computer & Information Systems Analyst | Junior | 11-3021 | Contractor Site or PAX River | California-Lexington Park, MD | 25th | $50.68 | $52.86 |
| Computer & Information Systems Analyst | Journeyman | 11-3021 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $75.98 | $79.25 |
| Computer & Information Systems Analyst | Senior | 11-3021 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $95.03 | $99.12 |
| Data Scientist | Journeyman | 15-2051 | Contractor Site | California-Lexington Park, MD | 50th | $48.92 | $51.02 |
| Engineer | Apprentice | 17-20002 | Contractor Site | California-Lexington Park, MD | 10th | $45.58 | $47.54 |
| Engineer | Junior | 17-20002 | Contractor Site or PAX River | California-Lexington Park, MD | 25th | $55.88 | $58.28 |
| Engineer | Journeyman | 17-20002 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $66.76 | $69.63 |
| Engineer | Senior | 17-20002 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $78.89 | $82.28 |
| Engineer | Senior | 17-20002 | NAS Jacksonville | Jacksonville, FL | 75th | $54.07 | $56.40 |
| Engineer | Senior | 17-20003 | Marine Corps Air Station (MCAS) Cherry Point, NC | New Bern, NC | 75th | $51.56 | $53.78 |
| Engineer | Senior | 17-20002 | NAS North Island | San Diego, CA | 75th | $77.02 | $80.33 |
| Engineer | Senior | 17-20003 | NAS Whidbey Island Oak Harbor, WA | Western Washington nonmetropolitan area | 75th | $71.25 | $74.31 |
| Engineer | Senior | 17-20003 | Raytheon Tucson, AZ | Tucson, AZ | 75th | $61.88 | $64.54 |
| Engineer | Senior | 17-20002 | Dept of Energy, Idaho Falls, ID | Idaho Falls, ID | 75th | $81.81 | $85.33 |
| Engineer | Senior | 17-20003 | Marine Corps Base Camp LeJeune | Jacksonville, NC9 | 75th | $51.56 | $53.78 |
| Engineer | Senior | 17-20002 | Sikorsky, Stratford, CT | Bridgeport-Stamford-Norwalk, CT | 75th | $65.36 | $68.17 |
| Engineer | Senior | 17-20002 | Lockheed Martin | Orlando, FL | 75th | $58.98 | $61.52 |
| Engineer | Senior | 17-20002 | Boeing, St. Louis, MO | St. Louis, MO | 76th | $64.13 | $66.89 |
| Engineer (Model-Based Systems) | Junior | 17-20002 | Contractor Site | California-Lexington Park, MD | 25th | $55.88 | $58.28 |
| Engineer (Model-Based Systems) | Journeyman | 17-20002 | Contractor Site | California-Lexington Park, MD | 50th | $66.76 | $69.63 |
| Engineer (Model-Based Systems) | Senior | 17-20002 | Contractor Site | California-Lexington Park, MD | 75th | $78.89 | $82.28 |
| Engineer (Production Quality) | Senior | 17-20002 | Contractor Site | California-Lexington Park, MD | 75th | $78.89 | $82.28 |
| Engineer (Systems) | Journeyman | 17-2199 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $73.60 | $76.76 |
| Engineer (Systems) | Senior | 17-2199 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $78.89 | $82.28 |
| Engineering Technician IV | N/A | 17-30204 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $46.40 | $48.40 |
| Engineering Technician IV | N/A | 17-30205 | Marine Corps Air Station (MCAS) Cherry Point, NC | New Bern, NC | 50th | $38.15 | $39.79 |
| Engineering Technician IV | N/A | 17-30205 | Marine Corps Base Camp LeJeune | Jacksonville, NC9 | 50th | $38.15 | $39.79 |
| Engineering Technician VI | N/A | 17-30204 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $48.80 | $50.90 |
| Engineering Technician VI | N/A | 17-30205 | Marine Corps Air Station (MCAS) Cherry Point, NC | New Bern, NC | 75th | $41.97 | $43.77 |
| Engineering Technician VI | N/A | 17-30205 | Marine Corps Base Camp LeJeune | Jacksonville, NC9 | 75th | $41.97 | $43.77 |
| Engineering Technician VI | N/A | 17-30205 | Boeing | St Louis, MO | 75th | $38.25 | $39.89 |
| Engineering Technician VI | N/A | 17-30204 | Raytheon El Segundo, CA | Los Angeles - Long Beach - Anaheim, CA | 75th | $47.79 | $49.84 |
| Engineering Technician (Model-Based) IV | N/A | 17-30204 | Contractor Site | California-Lexington Park, MD | 50th | $46.40 | $48.40 |
| Engineering Technician (Model-Based) VI | N/A | 17-30204 | Contractor Site | California-Lexington Park, MD | 75th | $48.80 | $52.70 |
| Management Analyst | Junior | 13-1111 | PAX River | California-Lexington Park, MD | 25th | $46.52 | $48.52 |
| Management Analyst (Configuration) | Junior | 13-1111 | Contractor Site or PAX River | California-Lexington Park, MD | 25tth | $46.52 | $48.52 |
| Mathematical Science Occupations (All Other) | Senior | 15-20996 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $67.37 | $70.27 |
| Mathematical Scientist (Systems Specialist) | Senior | 15-20996 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $67.37 | $70.27 |
| Operations Manager | Senior | 11-1021 | Contractor Site | California-Lexington Park, MD | 75th | $75.05 | $78.28 |
| Operations Manager Deputy | Journeyman | 11-1021 | Contractor Site | California-Lexington Park, MD | 50th | $45.53 | $47.49 |
| Operations Research Analyst | Junior | 15-2031 | Contractor Site or PAX River | California-Lexington Park, MD | 25th | $44.88 | $46.81 |
| Operations Research Analyst | Journeyman | 15-2031 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $55.71 | $58.11 |
| Operations Research Analyst | Senior | 15-2031 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $69.55 | $72.54 |
| Operations Research Analyst | Senior | 15-2031 | NAWCTSD Orlando | Orlando, FL | 75th | $58.98 | $61.52 |
| Operations Research Analyst (Model-Based) | Junior | 15-2031 | Contractor Site | California-Lexington Park, MD | 25th | $44.88 | $46.81 |
| Operations Research Analyst (Model-Based) | Journeyman | 15-2031 | Contractor Site | California-Lexington Park, MD | 50th | $55.71 | $58.11 |
| Operations Research Analyst (Model-Based) | Senior | 15-2031 | Contractor Site | California-Lexington Park, MD | 75th | $69.55 | $72.54 |
| Program Management Analyst | Journeyman | 13-1111 | Contractor Site or PAX River | California-Lexington Park, MD | 50th | $57.98 | $60.47 |
| Program Management Analyst | Journeyman | 13-1111 | Marine Corps Air Station (MCAS) Cherry Point, NC | New Bern, NC | 50th | $44.51 | $46.42 |
| Program Management Analyst | Journeyman | 13-1111 | Marine Corps Base Camp LeJeune | Jacksonville, NC | 50th | $44.51 | $46.42 |
| Program Management Analyst | Senior | 13-1111 | Contractor Site or PAX River | California-Lexington Park, MD | 75th | $66.36 | $69.21 |
| Program Management Analyst (Model-Based Systems Engineering) | Junior | 13-1111 | Contractor Site | California-Lexington Park, MD | 25th | $46.52 | $48.52 |
| Program Management Analyst (Model-Based Systems Engineering) | Journeyman | 13-1111 | Contractor Site | California-Lexington Park, MD | 50th | $57.98 | $60.47 |
| Program Management Analyst (Model-Based Systems Engineering) | Senior | 13-1111 | Contractor Site | California-Lexington Park, MD | 75th | $66.36 | $69.21 |
| Software Developer | Junior | 15-1252 | Contractor Site | California-Lexington Park, MD | 25th | $49.23 | $51.35 |
| Software Developer | Journeyman | 15-1252 | Contractor Site | California-Lexington Park, MD | 50th | $60.40 | $63.00 |
| Software Developer | Senior | 15-1252 | Contractor Site | California-Lexington Park, MD | 75th | $70.12 | $73.14 |
| Tactical Operations and Air/Weapons Specialist | Journeyman | 55-30007 | PAX River | California-Lexington Park, MD | 50th | $49.96 | $52.11 |
| Tactical Operations and Air/Weapons Specialist | Senior | 55-30007 | PAX River | California-Lexington Park, MD | 75th | $71.72 | $74.80 |
| Notes: | |||||||
| 1includes Key Personnel | |||||||
| 217-2072, Electronics Engineers, Except Computerwas used to calculate the minimum rate for 17-2000. | |||||||
| 317-2071 Electrical Engineers was used to calculate the minimum rate for 17-2000 in these locations. | |||||||
| 417-3021 Aerospace Engineering & Operations Technologists and Technicians was used to calculate the minimum rate for 17-3020. | |||||||
| 517-3029 Aerospace Engineering & Operations Technologists and Technicians, Except Drafters, All Other was used to calculate the minimum rate for 17-3020. | |||||||
| 615-2051 Data Scientists was used to calculate the minimum rate for 15-2099. | |||||||
| 7BLS does not provide wage estimates for the 55-0000 Military Specific Occupations group. 53-2012 Commercial Pilots was used to calculate the minimum rate (salary/2080). | |||||||
| 8includes 4.3% escalation | |||||||
| 9New Bern rate used to calculate the minimum rate. |
Cost Summary
COST SUMMARY SPREADSHEET
| Prime Offeror Name: | |||||||||||||||||||||||||
| Subcontractor Name (if applicable): | |||||||||||||||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | 6 month Option to Extend | Total for All Periods | |||||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | F/P | Site | E/C/P | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Hours | Amount |
| Prime Contractor Labor Cost | |||||||||||||||||||||||||
| Prime Contractor Direct Labor | |||||||||||||||||||||||||
| Employee Name 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| Employee Name 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| Etc. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| Total Direct Labor Cost | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| Prime Contractor Indirect Labor Cost | |||||||||||||||||||||||||
| Overhead | |||||||||||||||||||||||||
| Fringe Benefits | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| Total Indirect Labor Cost | |||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| COM | |||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Subcontractor Labor Cost | ||||||||
| Subcontractor proposed cost and fee | ||||||||
| Subcontractor 1 | 0 | |||||||
| Subcontractor 2 | 0 | |||||||
| Etc. | 0 | |||||||
| Total proposed subcontractor labor cost and fee | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Prime contractor pass through (not including fee) | ||||||||
| Handling | ||||||||
| G&A | ||||||||
| Other (if any) | ||||||||
| Total pass through (not including fee) | ||||||||
| Total Subcontractor Cost including pass through | 0 |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor * |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF) 0
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all CLINs (Labor and ODCs) 0
Grand Total of CPFF all CLINs
| Pass Through Analysis - Total for All Years | Amount |
| Subcontractor proposed cost and fee | $0 |
| Pass Through Amount (not including fee) | $0 |
| Prime Contractor Fee for Subcontractor Labor * | $0 |
| Total Pass Through Amount (including fee) | $0 |
| Fee Analysis - Total for All Years | Amount |
| Prime Contractor Labor Cost | $0 |
| Fixed Fee for Labor Performed by Prime Contractor | $0 |
* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through. However, in Section B, prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column).
CLIN Summary
CLIN Summary Sheet
| CLINS | CLIN Description | Total Hours | Total Cost | Total Fixed Fee | Total Value $ |
| 1000 | |||||
| 1008 | |||||
| Total |
File details come from the government source that posted it. Updated .