CDRL_A007.pdf
PDF 60 KB Posted
- Solicitation number
- N00421-19-R-0049
About this file
This document contains a Contract Data Requirements List (CDRL) and a related federal contract opportunity notice. The CDRL outlines test plan and procedure documentation requirements for an engineering support services contract. Deliverables include test plans and procedures in contractor format due 45 days after task completion. The distribution statement is D and one soft copy shall be delivered to the Naval Air Warfare Center.
The related federal opportunity is a solicitation for Airborne Anti-Submarine Warfare contractor support services. The Naval Air Warfare Center Aircraft Division is seeking engineering, administrative, IT, logistics and management support for acoustic and non-acoustic sensor systems. Services will support research, development, procurement, integration and training across classified and unclassified programs. The location is primarily Patuxent River, Maryland with potential off-site work. The cost-plus-fixed-fee IDIQ contract has a five year ordering period from March 2020 to March 2025. The NAICS code is 541330 with a $41.5 million size standard. The incumbent is American Electronic Warfare Associates under contract N00421-05-D-0013-0002.
CDRL A007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P8_Streamlined_Rates__for__Order__Pricing.xlsx | XLSX spreadsheet | |
| Amendment_0002.docx | DOCX document | |
| Amended_RFP.docx | DOCX document | |
| CDRL_A008.pdf | ||
| CDRL_A013.pdf | ||
| CDRL_A002.pdf | ||
| CDRL_A009.pdf | ||
| P4_Past_Performance_Information_Form.pdf | ||
| CDRL_A010.pdf | ||
| P6_Cost_Summary_Spreadsheet.xls | XLS spreadsheet | |
| Attachment_J1_Org_Conflict_of_Interest.docx | DOCX document | |
| Attachment_J4_DD_254_FINAL.pdf | ||
| N00421-19-R-0049_Released_RFP.docx | DOCX document | |
| P5_Contractor_Performance_Assessment_Questionnaire.pdf | ||
| Attachment_J3_SAC.docx | DOCX document | |
| CDRL_A001.pdf | ||
| P7_Fully_Burdened_Labor_Rates.xlsx | XLSX spreadsheet | |
| CDRL_A011.pdf | ||
| CDRL_A005.pdf | ||
| CDRL_A012.pdf | ||
| CDRL_A003.pdf | ||
| CDRL_A004.pdf | ||
| CDRL_A006.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST FORM APPROVED
OMB No.0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to, Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contract Office for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER: SESS
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
NAWCAD 4.5.14 TBD
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Test Plans/ Test Procedures
3. SUBTITLE
Test Plan
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.)
DI-SESS-81704
5. CONTRACT REFERENCE
See BLK 16
6. REQUIRING OFFICE
AD4.5.14
7. DD 250 REQ
LT
9. DIST STATEMENT REQUIRED
10. FREQUENCY
ONE/R
12 DATE OF FIRST
See BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
D 11. AS OF DATE
13. DATE OF SUBSEQUENT
See BLK 16
a. ADDRESSEE Draft FINAL
Reg Repro
16. REMARKS
BLOCK 4: Contractor format acceptable. Data Item Description cited as a guide only.
BLOCK 5: SOW Para 3.3.1.3.3, 3.3.1.8, 3.3.1.9, 3.3.2.4
BLOCK 8: and 13: The Government has 45 working days for review and acceptance or rejection. Contractor has 30 days for re-submittal if accepted with comments or rejected.
BLOCK 9: DISTRIBUTION STATEMENT D, Department of Defense and U.S. DoD contractors only (Critical Technology) (Date). Other requests shall be referred to (Cognizant Program Office assigned at time of award).
BLOCK 12: Report to be submitted NLT 45 days after completing studies, research, development, test and evaluation.
BLOCK 14: One (1) soft copies (Reg). Soft copy shall be delivered in the original and modifiable application (e.g., Microsoft Office, AutoCAD, etc.) to:
Building 2185 RM 1130 22347 Cedar Point Road Patuxent River, MD 20670
DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, NISPOM, Section 5-705.
4.5.14 (See Block 16)
1 1
15.TOTAL 1 1
G. PREPARED BY
H. DATE
14 September 2018
I. APPROVED BY
J. DATE
DD FORM 1423, JUN 90 Previous editions are obsolete Page of Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
DI-SESS-81704_Test Plans_Test Procedure
File details come from the government source that posted it. Updated .