CDRL_A001.pdf
PDF 59 KB Posted
- Solicitation number
- N00421-19-R-0049
About this file
This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity notice. The CDRL outlines required monthly progress reports from a contractor, including a funds expenditure graph and work completed graph. The contractor must submit draft reports within 30 days of the date of award and final reports within 30 days of the subsequent month.
The related federal contract opportunity is a solicitation for Airborne Anti-Submarine Warfare contractor support services. The Naval Air Warfare Center Aircraft Division seeks engineering, administrative, IT, logistics and management support for its ASW Systems Engineering Division. Services will support acoustic and non-acoustic sensors for naval air platforms across research, procurement, integration and training. The solicitation targets small businesses under a set-aside and will result in a cost-plus-fixed-fee IDIQ contract from March 2020 to March 2025. The incumbent is American Electronic Warfare Associates.
CDRL A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P8_Streamlined_Rates__for__Order__Pricing.xlsx | XLSX spreadsheet | |
| Amendment_0002.docx | DOCX document | |
| Amended_RFP.docx | DOCX document | |
| CDRL_A008.pdf | ||
| CDRL_A013.pdf | ||
| CDRL_A002.pdf | ||
| CDRL_A009.pdf | ||
| P4_Past_Performance_Information_Form.pdf | ||
| CDRL_A007.pdf | ||
| CDRL_A010.pdf | ||
| P6_Cost_Summary_Spreadsheet.xls | XLS spreadsheet | |
| Attachment_J1_Org_Conflict_of_Interest.docx | DOCX document | |
| Attachment_J4_DD_254_FINAL.pdf | ||
| N00421-19-R-0049_Released_RFP.docx | DOCX document | |
| P5_Contractor_Performance_Assessment_Questionnaire.pdf | ||
| Attachment_J3_SAC.docx | DOCX document | |
| P7_Fully_Burdened_Labor_Rates.xlsx | XLSX spreadsheet | |
| CDRL_A011.pdf | ||
| CDRL_A005.pdf | ||
| CDRL_A012.pdf | ||
| CDRL_A003.pdf | ||
| CDRL_A004.pdf | ||
| CDRL_A006.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST FORM APPROVED
OMB No.0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to, Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contract Office for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
NAWCAD 4.5.14 TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Contractor’s Monthly Progress, Status & Management Report
3. SUBTITLE
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.)
DI-MGMT-81864A
5. CONTRACT REFERENCE
SOW Para 3.1.3.1 & 3.3.3
6. REQUIRING OFFICE
AD4.5.14
7. DD 250 REQ
LT
9. DIST STATEMENT REQUIRED
D
10. FREQUENCY
Monthly
12 DATE OF FIRST
SUBMISSION
30 DAC
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
30 days from
DOA
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft FINAL
Reg Repro
16. REMARKS
BLOCK 4:
Reports shall document work performed on calendar month basis. Report to be submitted NLT 2 weeks into the subsequent month.
Graphs – additional requirements:
Funds expenditure graph. A funds expenditure graph shall be included. The graph shall be reproducible to enable periodic changes reflecting current contract funding status to be entered. The graph shall portray, at least quarterly, the planned versus actual total dollar expenditures and the percentage of the total contract dollars that the expenditure represents.
Work completed graph. A work completed graph shall be included that reflects the percentage of work completed by the contractor through the current reporting period. The graph shall plot actual completion versus planned completion, and shall be maintained current and be fully legible and reproducible.
BLOCK 14: One (1) soft copy (Reg). Soft copy shall be delivered in the original and modifiable application (e.g., MS Word, Excel, AutoCAD, etc.) to:
Building 2185 RM1130 22347 Cedar Point Road Patuxent River, MD 20670
DESTRUCTION NOTICE: Follow procedures in DoD 5220.22-M, NISPOM, Section 5-705.
4.5.14 (See
BLK 16)
1 1
15.TOTAL 1 1
G. PREPARED BY
H. DATE
14 September 2018
I. APPROVED BY
J. DATE
DD FORM 1423, JUN 90 previous editions are obsolete Page of Pages
17.
PRICE
GROUP
18.
DI-MGMT-81864A_C
ontracting Managm
File details come from the government source that posted it. Updated .