About this file

This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity notice. The CDRL outlines required monthly progress reports from a contractor, including a funds expenditure graph and work completed graph. The contractor must submit draft reports within 30 days of the date of award and final reports within 30 days of the subsequent month.

The related federal contract opportunity is a solicitation for Airborne Anti-Submarine Warfare contractor support services. The Naval Air Warfare Center Aircraft Division seeks engineering, administrative, IT, logistics and management support for its ASW Systems Engineering Division. Services will support acoustic and non-acoustic sensors for naval air platforms across research, procurement, integration and training. The solicitation targets small businesses under a set-aside and will result in a cost-plus-fixed-fee IDIQ contract from March 2020 to March 2025. The incumbent is American Electronic Warfare Associates.

CDRL A001

View the file

Other files

File Type Posted
P8_Streamlined_Rates__for__Order__Pricing.xlsx XLSX spreadsheet
Amendment_0002.docx DOCX document
Amended_RFP.docx DOCX document
CDRL_A008.pdf PDF
CDRL_A013.pdf PDF
CDRL_A002.pdf PDF
CDRL_A009.pdf PDF
P4_Past_Performance_Information_Form.pdf PDF
CDRL_A007.pdf PDF
CDRL_A010.pdf PDF
P6_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attachment_J1_Org_Conflict_of_Interest.docx DOCX document
Attachment_J4_DD_254_FINAL.pdf PDF
N00421-19-R-0049_Released_RFP.docx DOCX document
P5_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_J3_SAC.docx DOCX document
P7_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
CDRL_A011.pdf PDF
CDRL_A005.pdf PDF
CDRL_A012.pdf PDF
CDRL_A003.pdf PDF
CDRL_A004.pdf PDF
CDRL_A006.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST FORM APPROVED

OMB No.0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to, Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contract Office for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO B. EXHIBIT C. CATEGORY

TBD A TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR

NAWCAD 4.5.14 TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Contractor’s Monthly Progress, Status & Management Report

3. SUBTITLE

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.)

DI-MGMT-81864A

5. CONTRACT REFERENCE

SOW Para 3.1.3.1 & 3.3.3

6. REQUIRING OFFICE

AD4.5.14

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

Monthly

12 DATE OF FIRST

SUBMISSION

30 DAC

14. DISTRIBUTION

b. COPIES

8. APP CODE

11. AS OF DATE

30 days from

DOA

13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft FINAL

Reg Repro

16. REMARKS

BLOCK 4:

Reports shall document work performed on calendar month basis. Report to be submitted NLT 2 weeks into the subsequent month.

Graphs – additional requirements:

Funds expenditure graph. A funds expenditure graph shall be included. The graph shall be reproducible to enable periodic changes reflecting current contract funding status to be entered. The graph shall portray, at least quarterly, the planned versus actual total dollar expenditures and the percentage of the total contract dollars that the expenditure represents.

Work completed graph. A work completed graph shall be included that reflects the percentage of work completed by the contractor through the current reporting period. The graph shall plot actual completion versus planned completion, and shall be maintained current and be fully legible and reproducible.

BLOCK 14: One (1) soft copy (Reg). Soft copy shall be delivered in the original and modifiable application (e.g., MS Word, Excel, AutoCAD, etc.) to:

Building 2185 RM1130 22347 Cedar Point Road Patuxent River, MD 20670

DESTRUCTION NOTICE: Follow procedures in DoD 5220.22-M, NISPOM, Section 5-705.

4.5.14 (See

BLK 16)

1 1

15.TOTAL 1 1

G. PREPARED BY

H. DATE

14 September 2018

I. APPROVED BY

J. DATE

DD FORM 1423, JUN 90 previous editions are obsolete Page of Pages

17.

PRICE

GROUP

18.

DI-MGMT-81864A_C

ontracting Managm

File details come from the government source that posted it. Updated .