CDRL_A005.pdf
PDF 86 KB Posted
- Solicitation number
- N00421-19-R-0049
About this file
This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity notice. The CDRL outlines reporting requirements for a Risk Management Status Report to be delivered under an engineering support services contract. It requires one soft copy of the report to be submitted every 45 days after completion of studies, evaluations, and testing.
The related federal contract opportunity is a solicitation for Contractor Support Services personnel to provide engineering, administrative, logistics, and management support to the Naval Air Warfare Center Aircraft Division's Airborne Anti-Submarine Warfare Systems Engineering Division. The cost-plus-fixed-fee Indefinite Delivery/Indefinite Quantity contract would have a 5-year ordering period from March 2020 to March 2025. As a small business set-aside, the awardee must meet limitations on subcontracting. The incumbent is American Electronic Warfare Associates. The location of performance is primarily the Naval Air Warfare Center in Patuxent River, Maryland.
CDRL A005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P8_Streamlined_Rates__for__Order__Pricing.xlsx | XLSX spreadsheet | |
| Amendment_0002.docx | DOCX document | |
| Amended_RFP.docx | DOCX document | |
| CDRL_A008.pdf | ||
| CDRL_A013.pdf | ||
| CDRL_A002.pdf | ||
| CDRL_A009.pdf | ||
| P4_Past_Performance_Information_Form.pdf | ||
| CDRL_A007.pdf | ||
| CDRL_A010.pdf | ||
| P6_Cost_Summary_Spreadsheet.xls | XLS spreadsheet | |
| Attachment_J1_Org_Conflict_of_Interest.docx | DOCX document | |
| Attachment_J4_DD_254_FINAL.pdf | ||
| N00421-19-R-0049_Released_RFP.docx | DOCX document | |
| P5_Contractor_Performance_Assessment_Questionnaire.pdf | ||
| Attachment_J3_SAC.docx | DOCX document | |
| CDRL_A001.pdf | ||
| P7_Fully_Burdened_Labor_Rates.xlsx | XLSX spreadsheet | |
| CDRL_A011.pdf | ||
| CDRL_A012.pdf | ||
| CDRL_A003.pdf | ||
| CDRL_A004.pdf | ||
| CDRL_A006.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST FORM APPROVED
OMB No.0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to, Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contract Office for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO B. EXHIBIT C. CATEGORY
TBD A TDP TM OTHER: MGMT
D. SYSTEM/ITEM E. CONTRACTOR/PR NO. F. CONTRACTOR
NAWCAD 4.5.14 TBD
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Risk Management Status Report
3. SUBTITLE
Risk Management Report
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.)
DI-MGMT-81809
5. CONTRACT REFERENCE
SOW Para 3.3.1.2
6. REQUIRING OFFICE
AD4.5.14
7. DD 250 REQ
LT
9. DIST STATEMENT REQUIRED
10. FREQUENCY
ONE/R
12 DATE OF FIRST
See BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
D 11. AS OF DATE
13. DATE OF SUBSEQUENT
See BLK 16
a. ADDRESSEE Draft FINAL
Reg Repro
16. REMARKS
BLOCK 4: Contractor format acceptable. Data Item Description cited as a guide only.
BLOCK 8: and 13: The Government has 45 working days for review and acceptance or rejection. Contractor has 30 days for re-submittal if accepted with comments or rejected.
BLOCK 9: DISTRIBUTION STATEMENT D, Department of Defense and U.S. DoD contractors only (Critical Technology) (Date). Other requests shall be referred to (Cognizant Program Office assigned at time of award).
BLOCK 12: Report to be submitted NLT 45 days after completing studies, research, development, test and evaluation.
BLOCK 14: One (1) soft copy (Reg). Soft copy shall be delivered in the original and modifiable application (e.g., Microsoft Office, AutoCAD, etc.) to:
Building 2185 RM 1130 22347 Cedar Point Road Patuxent River, MD 20670
DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, NISPOM, Section 5-705.
4.5.14 (See Block 16)
1 1
15.TOTAL 1 1
G. PREPARED BY
H. DATE
13 September 2018
I. APPROVED BY
J. DATE
DD FORM 1423, JUN 90 Previous editions are obsolete Page of Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
DI-MGMT-81809_Ris k Management Statu