Question-Answer_Number_Two.docx

DOCX document 15 KB Posted

Attached to
5. 4. 3 Laboratory Support
Solicitation number
N00421-18-R-0035
Issued by

About this file

This document contains questions and answers regarding a federal solicitation for laboratory support services. The solicitation seeks to provide various support functions for several simulation laboratories operated by the Naval Air Systems Command's 5.4.3 Integrated Battlespace Simulation and Test division. The laboratories are used for activities such as research and development for aviation systems, supporting system development, flight test support, and operational support including system enhancements and accident investigations. They also conduct research on simulation initiatives involving common architectures, cross-platform communications, live virtual constructive events, air system stimulation, and verification and validation activities. The questions and answers clarify aspects of the solicitation such as the statement of work references and submission requirements for attachments to the technical and cost volumes of proposals.

Question and Answer Number 2

View the file

Other files

File Type Posted
Question-Answer_Number_Three.docx DOCX document
Attachment_P6_CLIN_Breakout_spreadsheet_543LABv3.xls XLS spreadsheet
N00421-18-R-0035_Amendment_0002.docx DOCX document
Attachment_P6_CLIN_Breakout_spreadsheet_543LABv2.xls XLS spreadsheet
N00421-18-R-0035_Amendment_0001.docx DOCX document
Question-Answer_Number_One.docx DOCX document
CDRL_A002_-_Project_Financial_Summary.pdf PDF
Attachment_J5_-Estimated_GFE.docx DOCX document
Attachment_P8_-_CDRL_A001_Format_-_Lab_Technical.pdf PDF
Attachment_P5_Ctr_Perf_Assess_Quest.pdf PDF
Attachment_P6_CLIN_Breakout_spreadsheet.xls XLS spreadsheet
CDRL_A003_-_Monthly_Status_Report.pdf PDF
N00421-18-R-0035.docx DOCX document
CDRL_A004_-_OPSEC_Plan.pdf PDF
Attachment_P4_PP_Info_Form.pdf PDF
Attachment_J4_DD254(BID).pdf PDF
Attachment_P9_-_CDRL_A002_Format_-_Lab_Technical.pdf PDF
Attachment_J1_OCI_List.doc DOC document
CDRL_A001_-_Monthly_Financial_Summary.pdf PDF
Attachment_P7_FB_Labor_Rate.xlsx XLSX spreadsheet
CDRL_A001_-_Monthly_Financial_Summary.pdf PDF
CDRL_A003_-_Monthly_Status_Report.pdf PDF
CDRL_A002_-_Project_Financial_Summary.pdf PDF
N00421-18-R-0035_DRAFT_RFP.docx DOCX document
Attachment_J4_DD254(BID).pdf PDF
CDRL_A004_-_OPSEC_Plan.pdf PDF
Attachment_3_-_CDRL_A002_Format.pdf PDF
Attachment_2_-_CDRL_A001_Format.pdf PDF
Attachment_P7_FB_Labor_Rate.xlsx XLSX spreadsheet
Attachment_J5_-Estimated_GFE.docx DOCX document
Attachment_P4_PP_Info_Form.pdf PDF
Attachment_J1_OCI_List.doc DOC document
Attachment_P5_Ctr_Perf_Assess_Quest.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/29/2019

Question #1: Section L Page 81 says 1.1.1 Project Support should address SOW 3.3.4 and

3.3.5 however page 83, section 1.1 first sentence says Project Support should address SOW 3.3.5 (does not include 3.3.4). Please clarify if

1.1.1 Project Support should address both SOW 3.3.4 and 3.3.5 or only 3.3.5.

Answer #1: The chart within Section L, Paragraph 3.0 will be updated in a forthcoming solicitation amendment to remove SOW 3.3.4 from the 1.1.1 Project Support section. As a result, only SOW 3.3.5 will need to be addressed for 1.1.1 Project Support.

Additionally, your question made us realize that the final RFP includes an outdated version of the Section C - Statement of Work. As a result, the forthcoming amendment will include an updated Section C - Statement of Work which is in alignment with the Statement of Work posted in the Draft solicitation announcement. The subject solicitation Amendment (#0001) will be posted to FBO today (1/29/2019).

02/08/2019 Question #2: The table in Section L, para 3.0 (page 81) lists "Completed Attachment P6" for the Technical Volume, Workforce Section 1.2.2.

Page 84, Technical Volume, section 1.2.2 Labor Mix, instructs "The offeror shall utilize Attachment P6 to propose the labor categories and hours (regular and overtime) as outlined in Section L, Paragraph 3.5.2."

The example table shown in 3.5.2, page 89, is quite different from Attachment P6 (which also contains cost data that shall not be included in the Technical Volume). Please clarify.

Answer #2: The Section 1.2.2 requirement for a "Completed Attachment P6" has been removed from the 1.2 Workforce section contained in the table within Section L, paragraph 3.0.

Section L paragraph 1.2.2 - Labor Mix, which states "The offeror shall utilize Attachment P6 to propose the labor categories and hours (regular and overtime) as outlined in Section L, Paragraph 3.5.2" has been deleted entirely.

It is the Government's intent for the completed Attachment P6 only to be submitted within the Cost Volume. Language has been added to the table in Section L paragraph 3.0 to further clarify the submission of Attachments P4, P5, P6, and P7. Offerors will be expected to utilize the data contained in the Section L Table 3.5.2 to complete Attachment P6 for the cost proposal.

File details come from the government source that posted it. Updated .