This document contains questions and answers related to solicitation N00421-18-R-0035 for laboratory support services. The solicitation seeks to provide full spectrum engineering, technical, and support services for simulation laboratories operated by the Naval Air Systems Command's 5.4.3 Integrated Battlespace Simulation and Test Simulation Division. The laboratories support activities including requirements analysis, test and evaluation, training, research and development, system development, and life-cycle operational support. The questions and answers clarify requirements for the technical proposal, including which statement of work tasks must be addressed and correcting inconsistencies between the statement of work and other sections. An updated attachment with a new tab for the fifth contract year is also provided to address one of the questions.

Question and Answer #3

View the file

Other files

File Type Posted
Attachment_P6_CLIN_Breakout_spreadsheet_543LABv3.xls XLS spreadsheet
Question-Answer_Number_Two.docx DOCX document
N00421-18-R-0035_Amendment_0002.docx DOCX document
Attachment_P6_CLIN_Breakout_spreadsheet_543LABv2.xls XLS spreadsheet
N00421-18-R-0035_Amendment_0001.docx DOCX document
Question-Answer_Number_One.docx DOCX document
Attachment_P6_CLIN_Breakout_spreadsheet.xls XLS spreadsheet
CDRL_A003_-_Monthly_Status_Report.pdf PDF
CDRL_A002_-_Project_Financial_Summary.pdf PDF
Attachment_J5_-Estimated_GFE.docx DOCX document
Attachment_P8_-_CDRL_A001_Format_-_Lab_Technical.pdf PDF
Attachment_P5_Ctr_Perf_Assess_Quest.pdf PDF
N00421-18-R-0035.docx DOCX document
CDRL_A004_-_OPSEC_Plan.pdf PDF
Attachment_P4_PP_Info_Form.pdf PDF
Attachment_J4_DD254(BID).pdf PDF
Attachment_P9_-_CDRL_A002_Format_-_Lab_Technical.pdf PDF
Attachment_J1_OCI_List.doc DOC document
CDRL_A001_-_Monthly_Financial_Summary.pdf PDF
Attachment_P7_FB_Labor_Rate.xlsx XLSX spreadsheet
Attachment_P7_FB_Labor_Rate.xlsx XLSX spreadsheet
Attachment_J5_-Estimated_GFE.docx DOCX document
CDRL_A001_-_Monthly_Financial_Summary.pdf PDF
CDRL_A003_-_Monthly_Status_Report.pdf PDF
CDRL_A002_-_Project_Financial_Summary.pdf PDF
N00421-18-R-0035_DRAFT_RFP.docx DOCX document
Attachment_J4_DD254(BID).pdf PDF
CDRL_A004_-_OPSEC_Plan.pdf PDF
Attachment_3_-_CDRL_A002_Format.pdf PDF
Attachment_2_-_CDRL_A001_Format.pdf PDF
Attachment_P4_PP_Info_Form.pdf PDF
Attachment_J1_OCI_List.doc DOC document
Attachment_P5_Ctr_Perf_Assess_Quest.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/29/2019

Question #1: Section L Page 81 says 1.1.1 Project Support should address SOW 3.3.4 and

3.3.5 however page 83, section 1.1 first sentence says Project Support should address SOW 3.3.5 (does not include 3.3.4). Please clarify if

1.1.1 Project Support should address both SOW 3.3.4 and 3.3.5 or only 3.3.5.

Answer #1: The chart within Section L, Paragraph 3.0 will be updated in a forthcoming solicitation amendment to remove SOW 3.3.4 from the 1.1.1 Project Support section. As a result, only SOW 3.3.5 will need to be addressed for 1.1.1 Project Support.

Additionally, your question made us realize that the final RFP includes an outdated version of the Section C - Statement of Work. As a result, the forthcoming amendment will include an updated Section C - Statement of Work which is in alignment with the Statement of Work posted in the Draft solicitation announcement. The subject solicitation Amendment (#0001) will be posted to FBO today (1/29/2019).

02/08/2019 Question #2: The table in Section L, para 3.0 (page 81) lists "Completed Attachment P6" for the Technical Volume, Workforce Section 1.2.2.

Page 84, Technical Volume, section 1.2.2 Labor Mix, instructs "The offeror shall utilize Attachment P6 to propose the labor categories and hours (regular and overtime) as outlined in Section L, Paragraph 3.5.2."

The example table shown in 3.5.2, page 89, is quite different from Attachment P6 (which also contains cost data that shall not be included in the Technical Volume). Please clarify.

Answer #2: The Section 1.2.2 requirement for a "Completed Attachment P6" has been removed from the 1.2 Workforce section contained in the table within Section L, paragraph 3.0.

Section L paragraph 1.2.2 - Labor Mix, which states "The offeror shall utilize Attachment P6 to propose the labor categories and hours (regular and overtime) as outlined in Section L, Paragraph 3.5.2" has been deleted entirely.

It is the Government's intent for the completed Attachment P6 only to be submitted within the Cost Volume. Language has been added to the table in Section L paragraph 3.0 to further clarify the submission of Attachments P4, P5, P6, and P7. Offerors will be expected to utilize the data contained in the Section L Table 3.5.2 to complete Attachment P6 for the cost proposal.

Question #3: The revised Attachment P6 only has tabs for Execution Years I - IV and a tab for Summary of Execution Years I - IV. As this is a five year contract, please advise how we shall proceed with Execution Year V.

Answer #3: An updated Attachment P6 has been uploaded. This updated version includes an additional tab for Execution Year V and an updated summary tab to cover all execution years (I-V).

File details come from the government source that posted it. Updated .