This document contains an amendment to a solicitation and responses to questions regarding a federal contract opportunity to provide structural analysis and structural life monitoring support services. The Naval Air Warfare Center Aircraft Division is seeking these services over a five year period in support of the Structural Appraisal of Fatigue Effects program, Strength Engineering, and Loads and Dynamics Engineering. The total level of effort is estimated at 438,600 man-hours. The requirement is set aside for small businesses and will result in a single-award indefinite delivery/indefinite quantity contract that is cost-plus-fixed-fee and non-performance based. The solicitation number is N00421-18-R-0015 and responses are due by 22 October 2018.
N00421-18-R-0015-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_P6_PRIME_Cost_Summary.xls | XLS spreadsheet | |
| Attachment_1_CSP.pdf | ||
| N00421-18-R-0015-0001.pdf | ||
| Attachment_P3_Past_Performance_Information_Form.pdf | ||
| Attachment_P8-Annual_Fully_Burdened_Labor_Rates.xlsx | XLSX spreadsheet | |
| Attachment_1_CSP.pdf | ||
| Attachment_P6_PRIME_Cost_Summary.xls | XLS spreadsheet | |
| Attachment_P7_SUBCONTRACTOR_Cost_Summary_Sheet.xls | XLS spreadsheet | |
| Attachment_3_NAWCTSD_4330-60,_Data_Item_Transmittal_Form.pdf | ||
| 0015_Exhibit_A_CDRLs.pdf | ||
| N00421-18-R-0015.pdf | ||
| Attachment_2_OCI_List.pdf | ||
| Attachment_P5_CPAQ.pdf | ||
| Attachment_7_GFP.xlsx | XLSX spreadsheet | |
| Attachment_P4_Composite_Labor_Rate_and_Fee_Worksheet.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Oct-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0042118R0015
X 9B. DATED (SEE ITEM 11)
20-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Oct-2018
CODE
NAVAL AIR WARFARE CENTER AD
22473 MILLSTONE ROAD BLDG 505
PATUXENT RIVER MD 20670
N00421 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0042118R0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
Amendment 0002
The purpose of this amendment is to address additional questions associated to the RFP.
RFP Questions and Answers
1. Question: Please clarify that the only two Key personnel positions are the: Aerospace Engineer Senior
(KEY); and Computer and Information System Managers- Senior (KEY) and that resumes are only required for these individuals?
A. The Aerospace Engineer Senior (KEY); and Computer and Information System Managers- Senior
(KEY) are the only two labor categories designated as “Key” labor categories. Please refer to
Section C, Paragraph 3.4.5.1, as well as, the table at Section L, Part B, Paragraph 3.5.3 for Key personnel labor categories. Additionally, please refer to Section L, Part B, Paragraph 1.1.1 for resume requirements.
2. Question: In 1.2.1 SOW Approach: The Offeror shall describe in sufficient detail the following:
The Offeror shall provide a written narrative of the Offeror’s proposed understanding and capability necessary to perform the requirements of the SOW paragraphs 3.3 Detailed Support shown in the following table. Please clarify whether 1.2.1.1-1.2.1.3 are referring to ALL SOW tasks, or only those listed in the table. If ALL SOW tasks are required in the response, we respectfully request an extension to respond, as well as an increase in the page limit.
A. Please refer to previously answered questions No. 8 and 18 under Amendment 0001 below:
**All other terms and agreements remain unchanged**
** The closing date and time remain unchanged as 22 October 2018 at 1:00pm EST **
Amendment 0001
The purpose of this amendment is to make a revision to the solicitation as outlined below. All questions associated to the RFP are also addressed herein.
SF30
Block 1 – “Unrated” was added.
Section A
Added the following language: “Note: Personnel must be approved in accordance with NAVAIR clause
5252.237-9501 Addition or Substitution of Key Personnel prior to performing and incurring costs in a key labor category/position under the Task Order.”
Section J
Attachment 1 Contractor Surveillance Plan and Attachment P6 Prime Cost Summary Spreadsheet are revised and updated herein.
Section L
The solicitation is herein revised to remove the following from Section L, Part B, paragraph 3.1(b) “and
Sub CLIN”.
The solicitation is herein revised to change language in Section L, Part B, paragraph 3.3 from: “The Offeror shall use the CLIN Summary tab to…” change to: “The Offeror shall create a Summary tab to…”
The solicitation is herein revised to remove the requirement from Section L, Part B, paragraph 3.3(a) and mark the paragraph as “Reserved”.
*All other terms and agreements remain unchanged*
*The closing date and time remain unchanged as 22 October 2018 at 1:00pm EST.*
RFP Questions and Answers
1. Page 1. Block 1, Is this a rated contract under DPAS, and if so, what is the priority rating?
A. No, the contract is Unrated. The solicitation has been updated herein.
2. Page 7 and Attachment P6. Attachment P6 has CLIN 0007 noted in cell K421 however on Page 7 of solicitation N00421-18-R-0015, ODC CLIN is 0011 (there is no CLIN 0007-0010). What is the correct
CLIN number/structure?
A. Attachment P6 has been updated to reflect the correct CLIN number/structure.
3. Page 14. 3.1.4.1.4 Overtime – states that Overtime cannot be charged directly to the contract unless first approved in writing by the Chief of the Contracting. However, clause 52.222-2 Payment for Overtime
Premiums found on page 61 authorizes the use of overtime if the overtime premium cost does not exceed
$0.00. Please clarify if overtime is authorized.
A. At this time, no overtime is authorized. If overtime is determined necessary during performance, prior to execution and expenditure, approval will be required along with a modification to the basic contract and incorporation of the clause into the applicable Task Order.
4. Page 41. NAVAIR Clause 5252.216-9506 MINIMUM AND MAXIMUM QUANTITIES
(NAVAIR)(MAR 1999) states that the “Indefinite Quantity" of this contract, has a minimum quantity of
$10,000.00; the maximum quantity is the total contract value (ceiling of the contract), but on page 60, under FAR 52.216-19 ORDER LIMITATIONS (OCT 1995), it shows the Minimum order being
$5,000.00. Can you confirm what the minimum quantity is under this contract?
A. The minimum quantity of the contract is $10,000, while the minimum price for each individual order is $5,000.
5. Page 54. NAVAIR Clause 5252.228-9501 LIABILITY INSURANCE (MAR 1999) lists the types of insurance required In Accordance With (IAW) FAR 52.228-7, in particular (d) requires Aircraft public and passenger liability: $200,000 per person and _$500,000_ per occurrence for bodily injury, other than passenger liability; $200,000 per occurrence for property damage. Passenger bodily injury liability limits of
_$200,000 per passenger, multiplied by the number of seats or number of passengers, whichever is greater.
This could pose a burdensome expense for a small business; would the government consider removing (d) as part of the Insurance requirement?
A. No, the Government will not remove (d) as part of the requirement.
6. Page 68. Section K, If the information in Federal Awardee Performance and Integrity Information System
(FAPIIS) is accurate and up to date as required through an active registration in the System for Award
Management (SAM) database, is it still necessary to check the box on page 68, of the clause FAR 52.209-7
INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)?
A. Yes, it is still necessary to check the box in FAR 52.209-7 paragraph (b).
7. Page 71. NAVAIR Clause 5252.209-9511 ORGANIZATIONAL CONFLICTS OF INTEREST
REPRESENTATION (SERVICES) (NAVAIR)(APR 1989) mandates that the Offeror must check one of the appropriate boxes, and submit along with the proposal; what area/section should this be included? Or should it be included as an Attachment and mentioned in the Cover letter, because it is not the same as
Attachment 2 – Organizational Conflict of Interest (OCI) List?
A. Information concerning conflicts of interest should be included as an Attachment to the proposal and included in the Proposal Cover Letter.
8. Page 77, 1.2.1 SOW Approach – is the Offeror to demonstrate their understanding of the work as it pertains to just those SOW paragraphs outlined in the table? Or all SOW paragraphs in 3.3? Please clarify.
A. The Offeror is to demonstrate their understanding of the work as it pertains to the SOW paragraphs outlined in the table in Section L, Part B, paragraph 1.2.1.
9. Page 78. 2.1 Past Performance/General: Please clarify that past performance is not required from proposed subcontractors that do not meet the proposal definition of principal subcontractor.
A. The Past Performance Information Form is only required from principal subcontractors.
10. Page 78. 2.1 Past Performance/General: 2nd sentence of 3rd paragraph states “Due to the printing limitations associated with the Past Performance Information Form (Attachment P3), the Offerors may utilize the Past Performance Annex to include an exact copy of the full text from the “Contract Effort
Description” block or other blocks as appropriate for reviewing the data.” Is the Past Performance Annex a self-created document?
A. Yes, the Past Performance Annex is a self-created document to be attached to the Past
Performance Information Form.
11. Page 79. 3.1 Volume Content (b) “This volume shall contain a copy of Section B with the Contract Line
Item (CLIN) and Sub-CLIN Unit Prices...” Are there Sub-CLINs? Section B (pages 3-9) indicates Ceiling
Costs to be placed on CLIN 0001 and CLIN 0011. CLINS 0002-0006 and CLINS 0012-0016 are Not
Separately Priced (NSP). Please provide clarification regarding level CLIN/Sub-CLIN level for Cost
Volume.
A. The solicitation is herein revised to remove the following from Section L, Part B, paragraph 3.1(b)
“and Sub CLIN”. The Ceiling Costs will be placed on CLIN 0001 and CLIN 0011. No costs shall be proposed for the other CLINs at the basic contract level.
12. Page 80. 3.3 Price/Cost Information: Paragraph 1, states that the Offeror shall use the CLIN Summary tab in Attachment P6 to breakout cost by CLIN; however, there is no CLIN Summary tab. Please clarify or provide referenced CLIN Summary tab.
A. In accordance with the instructions for Attachments P6 and P7, the Offeror and subcontractors shall create a tab for each contract year and a “Summary” tab outlining the cumulative breakout for all contract years. The solicitation is herein revised to change language in Section L, Part B, paragraph 3.3 from: “The Offeror shall use the CLIN Summary tab to…” change to: “The Offeror shall create a Summary tab to…”
13. Page 80. 3.3 Price/Cost Information: Paragraph (a) states, “Show traceability with the CLINs, SubCLINs, PWS, proposed effort, proposed manning levels, and prices/costs. Refer to specific sections in the
Technical Volume as needed to illustrate the consistency between the Price/Cost Volume and the Technical
Volume.” Given that the cost proposal in Attachment P6 and Section B have all labor costs under CLIN
0001, it is not clear how this can be done. Can more clarification be provided on what the government wishes to see to fulfill this requirement?
A. The solicitation is herein revised to remove the requirement from Section L, Part B, paragraph
3.3(a) and mark the paragraph as “Reserved”.
14. Page 83. 3.4 Total Professional Compensation Plan: “The Offeror shall provide a Total Compensation
Plan in accordance with FAR 52.222-46 for each proposed professional employee.” According to the
FAR clause (found on pages 85-86) professional employees are defined in 29 CFR 541. Therefore, are we responsible to provide total compensation plan only for Professional Employees as defined in 29 CFR 541
(i.e. Professional Employees such as Engineers and NOT Executive Employees, Administrative
Employees, and Computer Employees)?
A. In accordance with Section L, Part B, paragraph 3.4, the Offeror shall provide a Total Professional
Compensation Plan for each proposed professional employee as defined in 29 CFR 541.
15. Page 83. 3.4 Total Professional Compensation Plan: The level of detail required by this paragraph is unclear. Could the govt provide a sample spreadsheet or template outlining the information required.
Regarding subparagraph (2), can you please clarify if this can be provided on a company-wide basis or is it required to be broken out by each individual professional employee?
A. The Total Professional Compensation Plan is a company generated document. The Government will not provide a template. The plan should be provided based on the offeror’s internal policies and procedures and shall include, but not be limited to the information required in Section L, Part
B, paragraph 3.4 (1), (2), and (3).
16. Page 77, 1.3.2 Transition Plan – is this section required for the incumbent? Please clarify.
A. Yes, the Transition Plan is still required for all offerors.
17. On Attachment 1, Contract Surveillance Plan (CSP), CDRL A002 is not included in the CDRL Data
Quality Standards Chart or the Quarterly Evaluation by Contract Data Requirements Lists Chart. Was this
CDRL purposely not included? In addition, the CDRL numbering in the SOW does not match that in the
CSP. Please clarify.
A. Yes, CDRL A002 will not be reviewed as part of the Contractor Performance Assessment Report
System (CPARS). The CSP has been updated herein and a revised version is provided.
18. Will the Government consider extending the proposal due date.
A. No, the Government will not extend the due date for proposals.
The following have been deleted:
SUMMARY OF CHANGES
(End of Summary of Changes)
File details come from the government source that posted it. Updated .