Attachment_P4_Composite_Labor_Rate_and_Fee_Worksheet.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- N00421-18-R-0015
About this file
This document provides details for a federal contract opportunity to provide structural analysis and structural life monitoring services to the Naval Air Systems Command. The solicitation seeks a contractor to support the Structural Appraisal of Fatigue Effects program, as well as Strength Engineering and Loads and Dynamics Engineering, with a level of effort of 438,600 man-hours over five years. The anticipated contract type is a small business set-aside, single-award Indefinite Delivery/Indefinite Quantity contract with a cost-plus-fixed-fee arrangement. The document includes templates for contractors to provide estimated and negotiated composite labor rates by labor category and year, as well as instructions for completing the fixed fee rate table. The government plans to release the solicitation in the fourth quarter of fiscal year 2018.
Attachment P4 - Composite Labor Rate and Fee Worksheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00421-18-R-0015-0002.pdf | ||
| Attachment_P6_PRIME_Cost_Summary.xls | XLS spreadsheet | |
| Attachment_1_CSP.pdf | ||
| N00421-18-R-0015-0001.pdf | ||
| Attachment_P3_Past_Performance_Information_Form.pdf | ||
| Attachment_P8-Annual_Fully_Burdened_Labor_Rates.xlsx | XLSX spreadsheet | |
| Attachment_1_CSP.pdf | ||
| Attachment_P6_PRIME_Cost_Summary.xls | XLS spreadsheet | |
| Attachment_P7_SUBCONTRACTOR_Cost_Summary_Sheet.xls | XLS spreadsheet | |
| Attachment_3_NAWCTSD_4330-60,_Data_Item_Transmittal_Form.pdf | ||
| 0015_Exhibit_A_CDRLs.pdf | ||
| N00421-18-R-0015.pdf | ||
| Attachment_2_OCI_List.pdf | ||
| Attachment_P5_CPAQ.pdf | ||
| Attachment_7_GFP.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Composite Rate - Term
| Worksheet and Instructions to Prime Offeror for completing Table B-1 Estimated and Negotiated Compsite Labor Rate Table. |
| N00421-18-R-0015 |
| ESTIMATED AND NEGOTIATED COMPOSITE LABOR RATES | |||||
| (Regardless of Clearance or Location) | |||||
| Non-Performance Based (Level of Effort) | |||||
| Labor Category | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
| Aerospace Engineers - Senior | |||||
| Aerospace Engineers - Journeyman | |||||
| Aerospace Engineers – Junior | |||||
| Computer and Informational Managers – Senior | |||||
| Computer Systems Analyst – Senior | |||||
| Computer Systems Analyst – Journeyman | |||||
| Computer Programmers – Journeyman | |||||
| Computer Programmers – Junior | |||||
| Program/Project Analyst – Journeyman | |||||
| Program/Project Analyst - Junior |
| INSTRUCTIONS: | |
| Column Heading | Description of Data Under this Column Heading |
| Government Labor Category | The Government Labor Categories correlating to Section C of the Government solicitation. |
| Composite Proposed Fully Burdened Rate, Years 1 - 5 | The average Fully Burdened Labor Rate per Hour is entered in the above table as proposed for each labor category during the applicable performance year (1-5) of the ordering period. Numbers only are entered, in U.S. dollar format ($###.##) rounded to the nearest cent. Fully Burdened Labor Rates shall include direct labor cost, fringe, overhead, G&A, subcontractor pass-through rate, and fee on total cost, but should not include Fully Burdened Other Direct Costs (ODCs) such as Materials, and Travel. This would be the total labor costs (the sum of both the prime and all subcontractors) costs for that labor category divided by the total number of labor hours for that category to arrive at the average (composite) Fully Burdened Labor Rate per Hour. |
Fee
| Worksheet and Instructions to Prime Offeror for completing B-2 Fixed Fee Table |
| N00421-18-R-0015 |
| FIXED FEE PER HOUR | |
| Fixed Fee Rate Per Hour | |
| Non-Performance Based (Level of Effort) |
| INSTRUCTIONS: |
| Enter the fee per hour based on the total fee proposed for all ordering periods divided by the total number of hours for all ordering periods. |
File details come from the government source that posted it. Updated .