About this file

This document provides draft elements for solicitation N00421-16-R-0026 seeking operational systems customization and engineering/technical services for mobile deployable command, control, communications, computers, combat systems, intelligence, surveillance, and reconnaissance systems. The Naval Air Warfare Center Aircraft Division Special Communications Mission Solutions Division requires support for legacy, current and next generation mobile deployable systems throughout their lifecycles including concept development, design, integration, verification, logistics and in-service support. Work will primarily occur in the continental United States with some tasks requiring travel outside the United States. Responses to the draft solicitation were requested by April 20, 2018 to inform revisions. The resulting contract will support Special Operations Forces, homeland security, and other Department of Defense and non-Department of Defense agencies. The North American Industry Classification System code is 541330 with a small business size standard of $38.5 million.

Attachment 13 Electronic Transfer of Contractor Expenses

View the file

Other files

File Type Posted
P8_FTEs_and_Labor_Hours_by_Location.xlsx XLSX spreadsheet
N00421-16-R-0026_MDC5ISR_RFP_Amend_0001.docx DOCX document
Attachment_11_MDC5ISR_Small_Business_Subcontracting_Plan.docx DOCX document
Attachment_02_MDC5ISR_Non-Navy_IT_Compliance_Form.doc DOC document
P2_Contractor_Performance_Assessment_Questionnaire_(CPAQ).pdf PDF
Attachment_07_MDC5ISR_Wage_Determinations.docx DOCX document
Attachment_09_MDC5ISR_Data_Item_Transmittal_Form.docx DOCX document
P6_Prime_and_Subcontractor_Cost_Summary_Sheet.xls XLS spreadsheet
Attachment_04_Authorized_Subcontractors.docx DOCX document
Attachment_14_MDC5ISR_Task_Order_Closeout.docx DOCX document
P5_-_Reserved.docx DOCX document
Attachment_10_MDC5ISR_QASP-CSP.doc DOC document
N00421-16-R-0026_MDC5ISR_RFP.docx DOCX document
Attachment_12_MDC5ISR_Financial_Progress_Report.docx DOCX document
Attachment_17_MDC5ISR_Segregation_of_Costs_Format.docx DOCX document
P4_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_18_MDC5ISR_OPNAV_5239_14_SAAR_N-form.pdf PDF
P7_-_Reserved.docx DOCX document
P1_Past_Performance_Information_Form.pdf PDF
Attachment_08_MDC5ISR_Authorized_Key_Personnel.doc DOC document
Attachment_05_MDC5ISR_COR_Designation_Letter.docx DOCX document
Attachment_06_MDC5ISR_ACOR_Designation_Letter.docx DOCX document
Attachment_01_MDC5ISR_DD254_Form.pdf PDF
Attachment_03_MDC5ISR_OCI_List.docx DOCX document
Attachment_15_MDC5ISR_LAN_SOP_for_RFPs_v10.docx DOCX document
P8_FTEs_and_Labor_Hours_by_Location.xlsx XLSX spreadsheet
Attachment_16_MDC5ISR_Workforce_Reporting_Template.xlsx XLSX spreadsheet
P3_Fully_Burdened_Rates.xlsx XLSX spreadsheet
Exhibit_A_MDC5ISR_CDRLs.pdf PDF
N00421-16-R-0026_MDC5ISR-Elements_4'5'18.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 13

Code AD-4.11.4 Electronic Transfer of Contractor Expenses

1.0 Instructions for the electronic submission of contractor expense data are as follows:

a. Submit only one line of current expenditures and one line of cumulative expenditures per record.

b. Maximum line length is 91 characters. Try to stay around 80.

c. Categories are separated by a space.

d. File must not contain page breaks or blank lines.

e. Each line of current expenditures must contain at least nine columns and each line of cumulative expenditures must contain nine columns. If there is no expenditure data for the first nine columns, zeros must be placed in those columns.

f. If no expenditures exist for the CLIN and category put a zero in the column.

g. Submit all add records for a reporting period at the beginning of the file. After the reporting period, you may submit changes and deletion entries. Specify the period for the entry you wish to change or delete.

h. Valid transaction codes: (A) for adding or changing a record and (D) is for deletion of a record. Do not send a cumulative line when deleting a record.

i. All fields may be submitted to include up to the second decimal place.

1.1 The following information must be contained in each file and must be in the following order. There are some categories that are not used on all task orders but are required for others. You must report a zero for categories the task order or the contractor’s reporting system does not require. If no expenditures exist for a particular category, put a zero in the column for the current expenditures. Following are the headers and columns available to enter expenditures:

Contractor Status Report

Task Order Number:

Week Ending Date: MM/DD/YYYY

CODE, WBSN/TO_NO, CLIN, HOURS, LABOR$, HOURS_OT, LABOR$_OT,

MATERIAL, TRAVEL, OTHER, CUM_HOURS, CUM_LABOR$,

CUM_HOURS_OT, CUM_LABOR$_OT, CUM_MATERIAL, CUM_TRAVEL,

CUM_OTHER

a. The task order number needs to be specified only once for the reporting period.

b. The week ending date needs to be specified only once for a given period and will be applied to all entries following the date. Dates should reflect the following format: MM/DD/YYYY.

1.2 Descriptions of expenditure category (column) titles are as follows:

CODE

Transaction Code. Should be an (A) when expenses for the specified CLIN are for a new period ending date, or a (D) if the transaction is a deletion of a previously transmitted expense entry. This entry should be placed in the first position of the line.

WBSN/TO_NO

Work Breakdown Structure Number (WBSN). This entry may consist of up to17 characters. WBSN shall be in the following format:

Last two digits of the Fiscal Year in which the task began (ex. 2005)

A Task Order Option Year - an alphabetic indicator assigned to each option year (ex. A for Base Year, B for Option I, C for Option II, etc.). WBSN will correspond to the task order's deliverable CDRL for that option year.

5733/

Task Order Number - last four digits of the task order number and a forward slash (/) at the end (ex. N00421-02-C-5733)

090-01

WBSN - up to nine characters total (ex. 090, 090-01, 1111-A01)

Examples:

05A5733/090

05A5733/090-01

05A5733/1111-A01

Task Order format shall be in accordance with the Government issued number shown on Block 2 of Form DD1155. Number format can be alphabetic, numeric, or alphanumeric.

CLIN

Task Order Line Item Number. This entry may consist of up to 6 characters (ex. 0001, 0101, 0001aa, 0001ab).

HOURS

Total Workhours. Total labor hours expended for the reporting period to include subcontractor hours. Overtime hours worked may be included if other categories are not feasible to utilize with contractor’s reporting system.

LABOR$

Labor Dollars. Total fully burdened labor dollars expended for the reporting period. May include overtime labor and subcontractor labor dollars, if other categories are not feasible to utilize with the contractor’s reporting system.

HOURS_OT

Overtime Hours. Total overtime labor hours expended for the reporting period, if the contractor’s reporting system provides this total separately from standard time workhours.

LABOR$_OT

Overtime Labor Dollars. Total fully burdened overtime labor dollars expended for the reporting period, if the contractor’s reporting system provides this total separately from standard labor dollars.

MATERIAL

Material Dollars. Total fully burdened material expenditures including outstanding commitments for the reporting period. This may include subcontractor material expenditures, if other categories are not feasible to utilize with the contractor’s reporting system.

TRAVEL

Travel Dollars. Total fully burdened travel expenditures including outstanding commitments for the reporting period. This may include subcontractor travel expenditures, if other categories are not feasible to utilize with the contractor’s reporting system.

OTHER

Other Dollars. All other miscellaneous expenses not applicable to the above categories broken down by CLIN (labor, travel, and material), if the contractor’s reporting system provides a category of cost other than those provided above.

CUM

Cumulative Hours or Cost. Indicates the cumulative total of the category.

1.3 The following reflects how each expenditure category is rolled together to show CLIN Level expenses:

a. HOURS + HOURS_OT = HOURS

b. LABOR$ + LABOR$_OT = LABOR

c. MATERIAL = MATERIAL

d. TRAVEL = TRAVEL

e. OTHER = OTHER

f. CUM_HOURS + CUM_HOURS_OT = CUM_HOURS

g. CUM_LABOR$ + CUM_LABOR$_OT = CUM_LABOR

h. CUM_MATERIAL = CUM_MATERIAL

i. CUM_TRAVEL = CUM_TRAVEL

j. CUM_OTHER = CUM_OTHER