N00421-16-R-0007
Section A - Solicitation/Contract Form
GENERAL INFORMATION
Point of Contact:
Lyle A. Kralle Contract Specialist Code 2.5.1.7.10
(301) 757-0156 Lyle.kralle@navy.mil
Rebecca J. Wathen Procuring Contracting Officer Code 2.5.1.7
(301) 757-0013 Rebecca.wathen@navy.mil
The contract is for a total period of performance of five (5) years (Base Period of one year plus four one-year option periods).
The Contract includes Cost Plus Fixed Fee (CPFF) Level of Effort (LOE) contact line item numbers (CLINs) for labor and cost reimbursement (no fee) CLINs for Other Direct Costs (ODCs), including material and travel.
Funding for each CLIN will be obligated at the SubCLIN level.
The Contractor will not be authorized to access any classified information under this contract unless a DD Form 254 is incorporated.
CLAUSES INCORPORATED BY FULL TEXT
| 5252.201-9504 | DRAFT RFP INFORMATION (NAVAIR)(JUL 2011) |
| Offerors are hereby informed that the terms of this RFP may change based on staff comment and direction resulting from the milestone review. |
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
4.4 CSS Labor (RDT&E)
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
FOB: Destination
PURCHASE REQUEST NUMBER: 1300386757
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
4.4 CSS Labor (O&MN)
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
4.4 CSS Labor (AP(N))
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
4.4 CSS Labor (NWCF)
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Travel in Support of CLINs 0001-0004
COST
Travel in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Materials in Support of CLINs 0001-0004
COST
Materials in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Data CLINs 0001-0004
* Not Separately Price *NSP * Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (RDT&E) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (O&MN) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (AP(N)) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (NWCF) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Travel in Support of CLINs 0101-0104 |
COST
Travel in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Materials in Support of CLINs 0101-0104 |
COST
Materials in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data CLINs 0101-0104 |
* Not Separately Price *NSP * Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (RDT&E) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (O&MN) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (AP(N)) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (NWCF) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Travel in Support of CLINs 0201-0204 |
COST
Travel in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Materials in Support of CLINs 0201-0204 |
COST
Materials in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data CLINs 0201-0204 |
* Not Separately Price *NSP * Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (RDT&E) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (O&MN) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (AP(N)) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (NWCF) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Travel in Support of CLINs 0301-0304 |
COST
Travel in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Materials in Support of CLINs 0301-0304 |
COST
Materials in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data CLINs 0301-0304 |
* Not Separately Price *NSP * Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (RDT&E) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (O&MN) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (AP(N)) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| 4.4 CSS Labor (NWCF) |
CPFF
Labor for Engineering, Administrative, Operation and Technical Support Services in accordance with the Performance Based Statement of Work.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Travel in Support of CLINs 0401-0404 |
COST
Travel in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Materials in Support of CLINs 0401-0404 |
COST
Materials in support of Engineering, Administrative, Operation and Technical Support Services.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Technical Data CLINs 0401-0404 |
* Not Separately Price *NSP * Technical Data in accordance with CDRLs in support of Engineering and Technical Services.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
CLAUSES INCORPORATED BY FULL TEXT
| 5252.211-9503 | LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012) - ALT I (JUN 2013) |
| (a) The level of effort estimated to be ordered during the term of this contract is [Insert man-hours] man-hours of direct labor including authorized subcontract labor, if any. The estimated composition of the total man-hours of direct labor by classification is as follows: |
| CLINS |
| Location |
| Base |
Option 1 Option 2 Option 3 Option 4
| Labor Category |
| On / Off |
| Hours |
| Hours |
| Hours |
| Hours |
| Hours |
| Total |
Hours
| Engineering Technician III |
| Pax(On) |
| 5760 |
| 5760 |
| 5760 |
| 5760 |
| 5760 |
| 28800 |
| Engineering Technician IV |
| Pax(On) |
| 13440 |
| 13440 |
| 13440 |
| 13440 |
| 13440 |
| 67200 |
Engineering Technician V (Facilities)
| Pax(On) |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
Engineering Technician V (Environmental Testing)
| Pax(On) |
| 5720 |
| 5720 |
| 5720 |
| 5720 |
| 5720 |
| 28600 |
Engineering Technician V (Electrical Testing)
| Pax(On) |
| 3840 |
| 3840 |
| 3840 |
| 3840 |
| 3840 |
| 19200 |
Engineering Technician V (Dynamometer Testing)
| Pax(On) |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
Engineering Technician II SCA: Technical Assistant II
| Pax(On) |
| 7680 |
| 7680 |
| 7680 |
| 7680 |
| 7680 |
| 38400 |
Engineering Technician Junior SCA: Technical Assistant I
| Pax(On) |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
Subject Matter Expert (Wiring Qualified Products)
| Pax(On) |
| 4440 |
| 4440 |
| 4440 |
| 4440 |
| 4440 |
| 22200 |
Subject Matter Expert (Environmental)
| Pax(Off) |
| 2800 |
| 2800 |
| 2800 |
| 2800 |
| 2800 |
| 14000 |
Subject Matter Expert (Electrical Science and Technology Support)
| Pax(On) |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
Senior Engineer (Mechanical)
| Pax(On) |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
Senior Engineer (Electrical)
| Pax(On) |
| 5760 |
| 5760 |
| 5760 |
| 5760 |
| 5760 |
| 28800 |
| Administrative Assistant Junior |
| Pax(On) |
| 4490 |
| 4490 |
| 4490 |
| 4490 |
| 4490 |
| 22450 |
| Administrative Assistant |
| Pax(On) |
| 6240 |
| 6240 |
| 6240 |
| 6240 |
| 6240 |
| 31200 |
| Computer Specialist |
| Pax(On) |
| 5760 |
| 5760 |
| 5760 |
| 5760 |
| 5760 |
| 28800 |
| Senior Computer Specialist |
| Pax(On) |
| 9600 |
| 9600 |
| 9600 |
| 9600 |
| 9600 |
| 48000 |
| Procurement Specialist |
| Pax(On) |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
| Program Manager |
| Pax(On) |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
| Program Analyst |
| Pax(On) |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 1920 |
| 9600 |
Totals
| 90,890 |
| 90,890 |
| 90,890 |
| 90,890 |
| 90,890 |
| 454,450 |
| (b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22. | |
| (c) It is agreed that while the contractor's performance during the period set forth in paragraph (a) above is based upon an anticipated level of effort consisting of man-hours of direct labor (as may be described or defined elsewhere herein), such level of effort may fluctuate, either upward or downward, by no more than ten (10%) percent of the total anticipated man-hours. This fixed fee is agreed to be paid for man-hours expended from ninety (90%) percent to one hundred ten (110%) percent of the total anticipated man-hours. The fixed fee shall not vary with the cost of the actual effort supplied within this range. In the event that less than ninety (90%) percent of the anticipated level of effort is actually expended by the expiration date of the contract, the Government shall have the option of: | |
| (1) requiring the contractor to continue to perform until the level of effort expended equals ninety (90%) percent of the anticipated level of effort; or | |
| (2) effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than ninety (90%) percent of the anticipated level of effort. | |
| (d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations. |
Section C - Descriptions and Specifications
PERFORMANCE BASED SOW
PERFORMANCE BASED STATEMENT OF WORK
for Propulsion and Power Department (AIR 4.4) Lab Support
1.0 SCOPE
This Performance Based Statement of Work (PBSOW) sets forth the requirements for Contractor provided engineering, technical, administrative, operation, maintenance, repair, equipment and laboratory upgrades and improvements, equipment procurement, and calibration services for the Naval Air Warfare Center, Propulsion and Power Department (AIR 4.4), Patuxent River, Maryland.
1.1 BACKGROUND
AIR 4.4 is the lead activity for research, systems engineering and integration, engineering analysis and evaluation, test and evaluation, and in-service engineering support of Naval Propulsion and Power Systems. These systems include, but may not be limited to the following:
• Air breathing engines (except for ramjets) and engine integration for manned and unmanned aircraft and missiles, engine subsystems such as controls and lubrication systems;
• Auxiliary, secondary and emergency power systems;
• Helicopter transmissions and drive systems;
• Aircraft and engine fuel systems, and ground refueling systems;
• Fuel and oil for propulsion system engines, gearboxes, propellers and transmissions;
• Propulsion system performance, engine structures, fleet operations metrics; and
• Power generating; battery and power conversion systems; electrical power distribution systems; electrical power quality; electrical starting and emergency electrical power systems.
1.2 FACILITY/LABORATORY DESCRIPTION
The contractor shall provide the people and the skills necessary for the engineering, technical, administrative, operation, maintenance, repair, equipment and laboratory upgrades and improvements, equipment procurement, and calibration services of the below test facilities and testing laboratories, including test equipment. The ability to move people from one test lab/facility to another lab/facility to meet workload demands is required to ensure an efficient execution of the mission. The facilities, systems, and equipment do not remain static as upgrades, replacements, and removal of facilities, systems, and equipment and testing requirements evolve over time to meet the requirements of the Fleet.
· Propulsion Systems Evaluation Facility (PSEF), Bldg. 2360, NAWCAD Patuxent River, MD
· Aircraft Test and Evaluation Facility (ATEF), Bldg. 1669, NAWCAD Patuxent River, MD
· Electrical Power Systems Evaluation Facility (EPSEF), Bldg. 1461, NAWCAD Patuxent River, MD
1.2.1 PSEF – The PSEF consists of numerous test areas and unique facilities to test and collect data on propulsion components and sub-systems in the following test areas:
1.2.1.1 Fuels and Lubricants Test Area (FLT): This test area consists of 30 test rigs used to evaluate specific performance properties of aircraft and ship fuels, fuel handling systems and components, and engine/drive train lubricants.
1.2.1.2 Rotor Spin Facility (RSF): This facility is a unique Department of Defense asset that tests aircraft engine compressor and turbine components for a multi-service customer base under centrifugal loads. Testing includes Low and High Cycle Fatigue, Burst and Containment and Life/Design Validation.
1.2.1.3 Altitude Environmental Chamber (AEC): This facility assesses the operational flight envelope of UAV propulsion systems, evaluates system performance, mission operability, service life and design integrity.
1.2.1.4 Helicopter Drive System Facility (HDS): This facility is a unique Department of Defense asset, which provides test and evaluation capability to a multi-service customer base with interests in both the mechanical evaluation of helicopter hardware and the evaluation of diagnostic systems and techniques through the Helicopter Integrated Diagnostics System program.
1.2.1.5 Small Engine Test Area (SETA): These test areas are used to test and evaluate turboshaft engines, auxiliary power units, aircraft starters, starter control valves and prognostics and health management technologies. Testing includes environmental effects on engine performance and life, life extension evaluations, performance evaluations and developmental hardware evaluations.
1.2.1.6 Chemistry Laboratory (CL): This test area is used to test and evaluate the chemical and physical properties of aircraft and ship fuels and lubricants. This facility provides evaluation testing for all Navy fuels encompassing ship, air and ground uses.
1.2.1.7 Battery and Fuel Cell Test Laboratory. This facility performs discharge and recharge characteristics testing as well as evaluation of systems involved in flight testing and Science and Technology development programs.
1.2.2 ATEF – The ATEF is a Hush House for the evaluation of aircraft installed and uninstalled engine propulsion system performance. This facility has the capability to test the full spectrum of aircraft power operation from ground run-up to full afterburner under numerous environmental conditions. ATEF also contains specialized instrumentation and equipment to provide instrumentation signals real time during engine operation. Capabilities include:
· Engine/Intake Crosswind/Ingestion
· Weight and Balance
· Environmental effects (rain, wind, sun, heat)
· Thrust calibration
· Residual Fuel Calibration
· X-Ray inspections
· Night Vision equipment testing
1.2.3 EPSEF – The EPSEF is a testing facility that consists of numerous test areas that are designed to evaluate electrical power generating, battery and power conversion systems, electrical power distribution systems, electrical power quality, electrical starting and emergency electrical power systems. The facility is also responsible for auxiliary, secondary, and emergency power systems.
1.2.3.1 Electrical Test Laboratory. This facility performs electrical power evaluation testing on both airborne and ground equipment during all phases of equipment development and production. Continuous testing is performed on AC/DC generators, electrical starters, power conversion equipment, batteries, power monitors, wiring, and electrical circuit breakers. The rotational drive capability of this Lab is also used to evaluate helicopter drive systems for life and diagnostic system development.
1.2.3.2 Dynamics Test Laboratory. This facility performs dynamics testing on a full range of airborne and ground equipment under either ambient conditions or extreme temperature/altitude/humidity conditions.
1.2.3.3 Environmental Test Laboratory. This test area uses unique environmental test chambers to simulate the harsh environments that airborne and ground equipment are required to withstand. The majority of this testing evaluates the components ability to perform under MIL-STD-810A-G environment.
1.2.3.4 Mobile Electrical Test Laboratories. Provides mobile data acquisition capability for aircraft ground testing conducted at Patuxent River and other government and contractor facilities. The mobile laboratories are used to evaluate the performance of new components and aircraft systems that interface with the electrical power generation and distribution systems while installed in the aircraft. The mobile laboratories are trucks containing test equipment and require insured personnel who can drive the vehicle and operate the test equipment within the mobile laboratory. Over the road and airfield permits/license will be required and must be obtained by the Contractor.
1.2.3.5 Wind Tunnel Test Facility. A ram air turbine generator facility provides precise control and calibrated air velocities to evaluate the performance of the turbines under controlled laboratory conditions. This facility also performs blowing rain tests.
1.2.3.6 Wiring Test Laboratory (WTL): The WTL facility is dedicated to the testing, evaluation, and monitoring of aircraft electrical interconnect system components and tools in support of the Navy Qualified Products Lists (QPL) for each component.
1.2.3.7 Aircraft Mounted Auxiliary Drive (AMAD) Stand. This test stand supports the F-18 C/D AMAD research and development and engineering investigation programs. The test stand is utilized for performing diagnostics on the AMAD unit after removal from aircraft.
1.2.3.8 Modeling and Simulation Test Laboratory. This laboratory performs electrical generator and electrical power system modeling and simulation. This could include wire diagnostics and safety of flight testing for science and technology efforts.
2.0 APPLICABLE DOCUMENTS (The most current version of the document shall be used)
Document Number Nomenclature
| MIL-PRF-23699 | Lubricating Oil, Gas Turbine Engine, Synthetic Base | |
| DOD-L-85734 | Lubricating Oil, Helicopter Transmission, Synthetic Base | |
| MIL-PRF-85704 | Cleaning Compound, Turbine Engine Gas Path | |
| MIL-PRF-5624 | Turbine Fuels, Aviation, Grades JP-4, JP-5, and JP-5/JP-8 ST | |
| MIL-PRF-32148 | Filter Separator Elements, Fluid Pressure, Aviation and Distillate Fuel, Naval Shipboard | |
| API 1581 | Specification and Qualification Procedures for Aviation Jet Fuel Filter/Separators | |
| MIL-DTL-16884 | Fuel, Naval Distillate | |
| MIL-DTL-87107 | Propellant, High Density Synthetic Hydrocarbon Type, Grade JP-10 | |
| SAE AS5877 | Nozzle, Pressure, Fuel Servicing | |
| MIL-STD-210-C | Climate Extremes for Military Equipment | |
| MIL-STD-461-D | Electromagnetic Emission & Susceptibility Requirements for the Control of Electromagnetic Interference | |
| MIL-STD-462-D | Electromagnetic Interference Characteristics, Measurement of | |
| MIL-STD-464 | Electromagnetic Environmental Effects Requirement for Systems | |
| MIL-STD-704-F | Aircraft Electrical Power Characteristics | |
| MIL-STD-781-D | Reliability Design Qualification & Production Acceptance Tests: Exponential Distribution | |
| MIL-STD-810-G | Environmental Test Methods & Engineering Guidelines | |
| MIL-E-5272-C | Environmental Testing, Aeronautical & Associated Equipment, General Specification for | |
| MIL-E-5400 | Electronic Equipment, Airborne, General Specification for | |
| MIL-T-5422 | Testing, Environmental Airborne Electronic, & Associated Equipment | |
| MIL-G-6162-B | Generators & Starter-Generators, Electric Direct Current, Nominal 30 Volts, Aircraft, General Specification for | |
| MIL-G-21480-E | Generator System, 400 Hertz, Alternating Current, Aircraft General Specification for | |
| MIL-E-23001-B | Electric Generating System, Variable Speed Constant Frequency, Aircraft, General Specification for | |
| MIL-E-81910-A | Electric Power Generating & Control Equipment, Aircraft, Testing General Specification for |
MIL-W-5088-L &
| SAE-AS50881 | Wiring, Aircraft, Installation of | |
| MIL-I-8700-A | Installation and Test of Electronic Equipment in Aircraft, General Specification for | |
| MIL-STD-454-N | Standard General Requirements for Electronic Equipment | |
| MIL-E-7080-B | Electric Equipment, Aircraft, Selection and Installation of | |
| NAVAIR 01-1A-505 | Installation Practices, Aircraft Electric, and Electronic Wiring | |
| MIL–B-5087-B | Bonding, Electrical and Lightening Protection, for Aerospace |
3.0 REQUIREMENTS
The following describes the types of functional effort to be performed by the contractor:
3.1 ADMINISTRATIVE SUPPORT
(CLINS 0004, 0104, 0204, 0304, and 0404)
(NWCF)
The contractor shall provide general administrative, secretarial, and clerical support for AIR-4.4. Typical tasks listed in order of importance shall include, but are not limited to:
3.1.1 Process travel authorizations and orders using the Defense Travel System (DTS).
3.1.2 Process Visit Requests and imputing information into the BASICS II base access system.
3.1.3 Prepare visit requests using OPNAV 5221/27 and Aircraft and Personnel Automated.
3.1.4 Using both the Clearance System (APACS) and the Joint Personnel Adjudication System (JPAS).
3.1.5 Maintain recall and muster lists.
3.1.6 Operate a computer including proficiency in the complete Microsoft Office Suite software (i.e. MS Excel, Powerpoint, Access, Word, Outlook, etc.)
3.1.7 Create and save DoD Emall shopping carts items for DoD bankcard holders to purchase. The Contractor shall not be permitted to execute the purchase themselves.
3.1.8 Scan and transfer files
3.1.9 Comply with the requirements of the Privacy Act of 1974 in regard to personal information protection and disclosure.
3.1.10 Answer telephones and route calls.
3.1.11 Receive, route and distribute mail and other office material.
3.1.12 Operate an office copier to copy, sort, and collate copies.
3.1.13 Maintain and update office files and records.
3.1.14 Prepare and distribute Naval messages.
3.1.15 Prepare formal correspondence, technical reports, booklets and memoranda.
3.1.16 Provide conference and workshop coordination and administrative services including development of agendas, milestone charts, announcements, schedule meeting rooms, set up and dismantle of audio/visual equipment, database tracking of events, record attendees and points of contact, record minutes at general and splinter group meetings, and operate message boards.
3.1.17 Filing.
3.1.18 Prepare vouchers (Standard Form 1034) for standard issue safety equipment (shoes/glasses).
3.1.19 Prepare graphic art.
| 3.2 | PROGRAM MANAGEMENT SUPPORT |
| (CLINs 0001, 0101, 0201, 0301, and 0401) | |
| (RDT&E) |
3.2.1 Coordinate and track cost, schedule, business, and performance standards. Provide reports as requested by the COR.
3.2.2 Maintain interface with the COR in order to understand objectives and milestones.
3.2.3 Track projects and Contract Data Requirements Lists (CDRLs) deliveries.
| 3.3 | PROGRAM MANAGEMENT SUPPORT |
| (CLINs 0004, 0104, 0204, 0304, and 0404) | |
| (NWCF) |
3.3.1 Coordinate and track cost, schedule, business, and performance standards. Provide reports as requested by the COR.
3.3.2 Maintain interface with the COR in order to understand objectives and milestones.
3.3.3 Track projects and Contract Data Requirements Lists (CDRLs) deliveries.
| 3.4 | LABORATORY OPERATIONS SUPPORT |
| (CLINs 0001, 0101, 0201, 0301, and 0401) | |
| (RDT&E) |
The contractor shall provide engineering, technical, operation, maintenance, equipment repair, improvements, and calibration services in support of AIR-4.4 testing laboratories and test facilities based on current and projected test requirements for systems during the development phase. Typical tasks include, but are not limited to:
3.4.1 Provide training for the proper and safe operation and maintenance of both new and existing test facilities and test equipment.
3.4.2 Review and provide recommendations for project test plans and the test request forms per the Test Plan Standard Work Package.
3.4.3 Support the preparation of specialized and non-standard project test plans, test requests and development of innovative test procedures.
3.4.4 Support the availability and proper operation of appropriate facilities, instrumentation and test apparatus for the conduct of test program objectives. This could include adaptation and modification of existing test equipment/facilities.
3.4.5 Provide recommendations to the Government Project Engineer for new instrumentation and wiring configurations based on test requirements.
3.4.6 Perform pre-test setup, operation, data collection, recording, and analysis functions to support routine, as well as specialized and non-standard testing.
3.4.7 Conduct tests and analyze test data to confirm the test data is within range in accordance with government furnished specifications or approved test plans. If out of range, notify the test engineer in writing.
3.4.8 Maintain documentation of all test programs. Documentation is to include a description of the systems and/or equipment that was evaluated; the laboratory equipment and instrumentation used to run the test; calibration data; pretest and post-test performance data and the daily event log. Provide test results with findings, conclusions and recommendations to the project engineer.
3.4.9 Prepare test facility and equipment preventive maintenance schedules and perform maintenance in accordance with equipment maintenance/operation manuals and military test specifications and standards as applicable. Provide the Government written recommendations for test facility or equipment repairs, upgrades, or replacement.
3.4.10 Repair test facilities and test equipment.
3.4.11 Maintain all contractor occupied or utilized spaces (office, laboratory area, equipment room) in a safe, orderly and clean manner.
3.4.12 Remain cognizant of advances in testing technology. This may include visits or telephone inquiries to other activities, agencies and equipment manufacturers for the purpose of evaluating and observing evolving test equipment technology. Provide recommendations to the government technical lead to upgrade and modernize test facilities and equipment to enhance functionality of the test area, and reduce test cost.
3.4.13 The Contractor shall provide inputs for the preparation of recommended performance design change specifications, engineering data, installation requirements and other technical documentation to support the upgrade, repair and/or modification of existing and capability expansion of facility/equipment testing capabilities and equipment. Procurement of any new equipment or systems, in support of existing and future test capabilities, shall be because the existing equipment and capability is determined Beyond Economical Repair (BER) or unable to meet mission requirements and a new purchase is the only way to meet the requirement. The purchase of any replacement equipment, materials and repairs or upgrades under this contract shall be limited to those required to meet the minimum requirements defined within the test plan or mission plan. Purchases will be limed by the following:
a. The purchase of equipment, materials, and repairs or upgrades, for routine, low cost consumables (i.e. gears, bearings, seals, filters, gaskets, connectors, cables, flow meters, miscellaneous repairs, calibration effort, etc.), which do not exceed $500, and are within the scope of the contract may be purchased without Government verification.
b. he purchase of equipment, materials and repairs, upgrades and services in excess of $500 but less than $10,000, and are within the scope of the contract, may be purchased by the contractor after COR verification and written approval.
c. The purchase of equipment, materials and repairs, upgrades and services, in excess of $10,000 but less than $30,000 and are within the scope of the contract, may be purchased by the contractor after AIR 4.4C verification and written approval.
d. The purchase of equipment, materials and repairs or upgrades, in excess of $30,000 will be referred to the Contracting Officer, via the COR, for determination of whether or not the work is within the contract scope to maintain or enhance existing facilities
3.4.14 Support the government during manufacturer design reviews; factory demonstrations, equipment acceptance tests and operator/maintenance/manual verification/validation efforts.
3.4.15 The contractor shall install test facilities and equipment that have been purchased by the government or the contractor, in accordance with Paragraph 3.3.13 above. These installations shall be in accordance with equipment manuals, vendor instructions or Public Works Department Instructions which would be furnished as Government Furnished Information (GFI).
3.4.16 Support the development of test methods and procedures to facilitate the introduction of new/modified test equipment, standards and specifications.
3.4.17 Provide test facility maintenance and repair coordination for the Propulsion and Power Department. Duties shall include test facility maintenance as per the preventative maintenance plan including routine/daily test facilities inspections and any required corrective actions. Additional tasks include preparation of and preservation of test facilities, systems, hardware and equipment that will be placed in long term storage. Coordination with NAS Public Works (PW) for repair of equipment to maintain the required test conditions and ensure that PW maintenance activities are conducted without impact to test operations. Monitor all test equipment operation utilizing the Data Display Channel (DDC) system and adjusts set-points to provide test conditions to the appropriate test areas.
3.4.18 Conduct testing and evaluation utilizing AIR 4.4 Standard Work Packages (SWPs) and Standard Skills Packages (SSPs).
3.4.19 Conduct chemical analysis testing and reporting, including, but not limited to viscosity, flash point, heating value, density, foam, hydrogen content, surface tension, nitrogen content, tensile test, vapor pressure, water content, pour point test, sonic shear and peroxide content.
3.4.20 Conduct tests and analyze data from corrosion test apparatus, Spectroil Jr. spectrophotometer and Fiter Debris Analyzer (FDA); evaluate test results from high temperature deposition test, hot liquid process simulator, Ryder gear, Falex multi-specimen test, Rolls Royce Tribo test and others in support of the Lubricants Program.
3.4.21 Conduct tests in the Fuels and Lubricants areas including outside operations using the large fuel systems. Provide training to contractor personnel to ensure safety when utilizing chemicals.
3.4.22 Perform electrical wiring and wiring system component qualification and other testing and in accordance with Government test acceptance criteria. The contractor shall provide the test results to the government. All determinations of technical acceptance or rejection will be made by the government only.
3.4.23 Provide technical support for the Society of Automotive Engineers (SAE) and military (MIL) specifications for wiring and wiring components. Attend and participate in technical industry meetings, conferences, and planning meetings to provide interpretation for specifications and standards technical requirements. Provide a record of discussion items, action items, conclusions and recommendations to their respective government technical team lead.
3.4.24 Provide technical support to propulsion and power facilities including facility preparation to conduct the testing; environmental temperature control; preparing instrumentation for testing and reporting status, data acquisition and data retention. Perform information management assurance for the data acquisition systems and ensure the quality of the data for facility/laboratory systems administrators.
3.4.25 Make changes and/or modify facilities, systems, equipment, instrumentation and hardware as per engineering drawings.
3.4.26 Dismantle, prepare and preserve facilities, systems, hardware and equipment that will be placed in long term storage. Provide and maintain a written record of stored items.
3.4.27 Start, set and adjust test operating conditions, monitor test performance and operation and shut down the test facility after testing is complete.
3.4.28 Trouble shoot facility, system, equipment and hardware performance problems; advising facilities engineering of problems and potential solutions.
3.4.29 Ship and/or transport test equipment and/or test articles.
3.4.30 Maintain and update the inventory of equipment, instrumentation and hardware in all test facilities areas.
3.4.31 Support the AIR 4.4 RDT&E network which is a data sharing and exchanging system in compliance with Navy and DoD data and system security requirements. The AIR 4.4 RDT&E network is not part of the Navy Marine Corp Intranet (NMCI). Maintain, upgrade and report the network, nodes, and peripheral equipment configuration management. Recommend technical refresh dates and recommend improvements covering facility software, and data security hardware and software. Respond to and provide solutions for system trouble calls.
3.4.32 Support RDT&E Network accreditation process by collecting data, documenting systems, scanning machines and preparing documents for accreditation application submission.
3.4.33 Provide a dedicated, journey level Systems Administrator to work on the Naval Power Avionic and Thermal (NPATH) Lab computer systems. Provide computer updates, ensure network connectivity and load software programs. Ensure the NPATH modeling and data acquisition systems are functional to support each test or analysis event.
3.4.34 Maintain, support and upgrade RDT&E hardware and software including the Laboratory Information Management System (LIMS), once functional and out of development, test area data acquisition systems, data processing systems, control systems, and displays.
| 3.5 | LABORATORY OPERATIONS SUPPORT |
| (CLINs 0004, 0104, 0204, 0304, and 0404) | |
| (Working Capital Fund) |
The contractor shall provide engineering, technical, operation, maintenance, equipment repair and improvements, capability improvements and calibration services in support of AIR-4.4 testing laboratories and test facilities based on current and projected test requirements. Typical tasks include, but are not limited to:
3.5.1 Provide training for the proper and safe operation and maintenance of both new and existing test facilities and test equipment.
3.5.2 Review and provide recommendations for project test plans and the test request forms per the Test Plan Standard Work Package.
3.5.3 Support the preparation of specialized and non-standard project test plans, test requests and development of innovative test procedures.
3.5.4 Support the availability and proper operation of appropriate facilities, instrumentation and test apparatus for the conduct of test program objectives. This could include adaptation and modification of existing test equipment/facilities.
3.5.5 Provide recommendations to the Government Project Engineer for new instrumentation and wiring configurations based on test requirements.
3.5.6 Perform pre-test setup, operation, data collection, recording, and analysis functions to support routine, as well as specialized and non-standard testing.
3.5.7 Conduct tests and analyze test data to confirm the test data is within range in accordance with government furnished specifications or approved test plans. If out of range, notify the test engineer in writing.
3.5.8 Maintain documentation of all test programs. Documentation is to include a description of the systems and/or equipment that was evaluated; the laboratory equipment and instrumentation used to run the test; calibration data; pretest and post-test performance data and the daily event log. Provide test results with findings, conclusions and recommendations to the project engineer.
3.5.9 Prepare test facility and equipment preventive maintenance schedules and perform maintenance in accordance with equipment maintenance/operation manuals and military test specifications and standards as applicable. Provide the Government written recommendations for test facility or equipment repairs, upgrades, or replacement.
3.5.10 Repair test facilities and test equipment.
3.5.11 Maintain all contractor occupied or utilized spaces (office, laboratory area, equipment room) in a safe, orderly and clean manner.
3.5.12 Remain cognizant of advances in testing technology. This may include visits or telephone inquiries to other activities, agencies and equipment manufacturers for the purpose of evaluating and observing evolving test equipment technology. Provide recommendations to the government technical lead to upgrade and modernize test facilities and equipment to enhance functionality of the test area, and reduce test cost.
3.5.13 The Contractor shall provide inputs for the preparation of recommended performance design change specifications, engineering data, installation requirements and other technical documentation to support the upgrade, repair and/or modification of existing and capability expansion of facility/equipment testing capabilities and equipment. Procurement of any new equipment or systems, in support of existing and future test capabilities, shall be because the existing equipment and capability is determined Beyond Economical Repair (BER) or unable to meet mission requirements and a new purchase is the only way to meet the requirement. The purchase of any replacement equipment, materials and repairs or upgrades under this contract shall be limited to those required to meet the minimum requirements defined within the test plan or mission plan. Purchases will be limed by the following:
a. The purchase of equipment, materials, and repairs or upgrades, for routine, low cost consumables (i.e. gears, bearings, seals, filters, gaskets, connectors, cables, flow meters, miscellaneous repairs, calibration effort, etc.), which do not exceed $500, and are within the scope of the contract may be purchased without Government verification.
b. The purchase of equipment, materials and repairs, upgrades and services in excess of $500 but less than $10,000, and are within the scope of the contract, may be purchased by the contractor after COR verification and written approval.
c. The purchase of equipment, materials and repairs, upgrades and services, in excess of $10,000 but less than $30,000 and are within the scope of the contract, may be purchased by the contractor after AIR 4.4C verification and written approval.
d. The purchase of equipment, materials and repairs or upgrades, in excess of $30,000 will be referred to the Contracting Officer, via the COR, for determination of whether or not the work is within the contract scope to maintain or enhance existing facilities.
3.5.14 Support the government during manufacturer design reviews; factory demonstrations, equipment acceptance tests and operator/maintenance/manual verification/validation efforts.
3.5.15 The contractor shall install test facilities and equipment that have been purchased by the government or the contractor, in accordance with Paragraph 3.3.13 above. These installations shall be in accordance with equipment manuals, vendor instructions or Public Works Department Instructions which would be furnished as Government Furnished Information (GFI).
3.5.16 Support the development of test methods and procedures to facilitate the introduction of new/modified test equipment, standards and specifications.
3.5.17 Provide test facility maintenance and repair coordination for the Propulsion and Power Department. Duties shall include test facility maintenance as per the preventative maintenance plan including routine/daily test facilities inspections and any required corrective actions. Additional tasks include preparation of and preservation of test facilities, systems, hardware and equipment that will be placed in long term storage. Coordination with NAS Public Works (PW) for repair of equipment to maintain the required test conditions and ensure that PW maintenance activities are conducted without impact to test operations. Monitor all test equipment operation utilizing the Data Display Channel (DDC) system and adjusts set-points to provide test conditions to the appropriate test areas.
3.5.18 Conduct testing and evaluation utilizing AIR 4.4 Standard Work Packages (SWPs) and Standard Skills Packages (SSPs).
3.5.19 Conduct chemical analysis testing and reporting, including, but not limited to viscosity, flash point, heating value, density, foam, hydrogen content, surface tension, nitrogen content, tensile test, vapor pressure, water content, pour point test, sonic shear and peroxide content.
3.5.20 Conduct tests and analyze data from corrosion test apparatus, Spectroil Jr. spectrophotometer and Fiter Debris Analyzer (FDA); evaluate test results from high temperature deposition test, hot liquid process simulator, Ryder gear, Falex multi-specimen test, Rolls Royce Tribo test and others in support of the Lubricants Program.
3.5.21 Conduct tests in the Fuels and Lubricants areas including outside operations using the large fuel systems. Provide training to contractor personnel to ensure safety when utilizing chemicals.
3.5.22 Perform electrical wiring and wiring system component qualification and other testing and in accordance with Government test acceptance criteria. The contractor shall provide the test results to the government. All determinations of technical acceptance or rejection will be made by the government only.
3.5.23 Provide technical support for the Society of Automotive Engineers (SAE) and military (MIL) specifications for wiring and wiring components. Attend and participate in technical industry meetings, conferences, and planning meetings to provide interpretation for specifications and standards technical requirements. Provide a record of discussion items, action items, conclusions and recommendations to their respective government technical team lead.
3.5.24 Provide technical support to propulsion and power facilities including facility preparation to conduct the testing; environmental temperature control; preparing instrumentation for testing and reporting status, data acquisition and data retention. Perform information management assurance for the data acquisition systems and ensure the quality of the data for facility/laboratory systems administrators.
3.5.25 Make changes and/or modify facilities, systems, equipment, instrumentation and hardware as per engineering drawings.
3.5.26 Dismantle, prepare and preserve facilities, systems, hardware and equipment that will be placed in long term storage. Provide and maintain a written record of stored items.
3.5.27 Start, set and adjust test operating conditions, monitor test performance and operation and shut down the test facility after testing is complete.
3.5.28 Trouble shoot facility, system, equipment and hardware performance problems; advising facilities engineering of problems and potential solutions.
3.5.29 Ship and/or transport test equipment and/or test articles.
3.5.30 Maintain and update the inventory of equipment, instrumentation and hardware in all test facilities areas.
3.5.31 Support the AIR 4.4 RDT&E network which is a data sharing and exchanging system in compliance with Navy and DoD data and system security requirements. The AIR 4.4 RDT&E network is not part of the Navy Marine Corp Intranet (NMCI). Maintain, upgrade and report the network, nodes, and peripheral equipment configuration management. Recommend technical refresh dates and recommend improvements covering facility software, and data security hardware and software. Respond to and provide solutions for system trouble calls.
3.5.32 Support RDT&E Network accreditation process by collecting data, documenting systems, scanning machines and preparing documents for accreditation application submission.
3.5.33 Provide a dedicated, journey level Systems Administrator to work on the Naval Power Avionic and Thermal (NPATH) Lab computer systems. Provide computer updates, ensure network connectivity and load software programs. Ensure the NPATH modeling and data acquisition systems are functional to support each test or analysis event.
3.5.34 Maintain, support and upgrade RDT&E hardware and software including the Laboratory Information Management System (LIMS), once functional and out of development, test area data acquisition systems, data processing systems, control systems, and displays.
| 3.6 | LABORATORY OPERATIONS SUPPORT |
| (CLINs 0002, 0102, 0202, 0302, and 0402) | |
| (O&MN) |
The contractor shall provide engineering, technical, operation, maintenance, equipment repair, improvements, capability improvements and calibration services for in-service/out-of-production support for fielded systems. This support of AIR-4.4 testing laboratories and test facilities is based on current and projected test requirements. Typical tasks include, but are not limited to:
3.6.1 Provide training for the proper and safe operation and maintenance of both new and existing test facilities and test equipment.
3.6.2 Review and provide recommendations for project test plans and the test request forms per the Test Plan Standard Work Package.
3.6.3 Support the preparation of specialized and non-standard project test plans, test requests and development of innovative test procedures.
3.6.4 Support the availability and proper operation of appropriate facilities, instrumentation and test apparatus for the conduct of test program objectives. This could include adaptation and modification of existing test equipment/facilities.
3.6.5 Provide recommendations to the Government Project Engineer for new instrumentation and wiring configurations based on test requirements.
3.6.6 Perform pre-test setup, operation, data collection, recording, and analysis functions to support routine, as well as specialized and non-standard testing.
3.6.7 Conduct tests and analyze test data to…